
QUICK START GUIDE
Defense Center 750
DC750 (Rev 1)
Front
(A) Front Panel Controls and USB Port
Back
DC750 (Rev 2)
Front
A
(A) Front Panel Controls and USB Ports
Back
E
F
E
F
A
C
D
B
(B) Power Supply
(C) Serial Port
(D) VGA Port
G
(E) Management Interface
(F) Alternate eStreamer Interface
(G) USB Ports
Included items:
Sourcere DC750 (Rev 1) or DC750 (Rev 2)•
one power cord•
one straight-through Cat 5e Ethernet cable•
rack-mounting kit•
Required items:
athead and Phillips screwdrivers for the •
rack-mounting kit
laptop or monitor and keyboard to connect •
directly to the Defense Center
WARNING!
!
This Sourcere Defense Center should be installed and maintained
by qualied personnel only. Keep in mind the following safety
information to avoid system damage or personal injury:
Remove all factory packaging before using the Defense Center.•
Provide adequate ventilation to prevent overheating. Do not •
cover or block vents, or otherwise enclose the Defense Center.
The Defense Center must be properly grounded when •
connecting power to the power outlet.
At all times, keep the chassis area free from dust.•
Lifting the chassis for rack installation may require two people, •
as the unit is heavy.
To avoid electrical shock, do not open or remove the chassis •
covers or metal parts without proper instruction.
C
D
B
(B) Power Supply
(C) Serial Port
(D) VGA Port
G
(E) Management Interface
(F) Alternate eStreamer Interface
(G) USB Ports
Thank you for choosing Sourcere.
Before installing this Defense Center, download and
follow the instructions in the Sourcere Support
Welcome Kit (https://support.sourcere.com)
to get started with Sourcere Support, and to set up
your Customer Center account.
9770 Patuxent Woods Drive
Columbia, MD 21046 USA
800.917.4134 | +1.410.423.1901
support@sourcere.com
©2014 Cisco and/or its afliates.
All rights reserved.
Page 1 of 4©2014 Cisco and/or its afliates. All rights reserved.
2014-5.3-2

DC750
Installing the Defense Center
The Sourcere 3D System is delivered on different hardware platforms that you can
rack-mount. When you install a Defense Center, make sure that you can access the
Defense Center’s console for initial setup.
You can access the console for the rst conguration of a new Defense Center using a
keyboard and monitor with KVM, or using an Ethernet connection to the management
interface.
Keyboard and Monitor/KVM
You can connect a USB keyboard and VGA monitor to any Sourcere Defense Center,
which is useful for rack-mounted Defense Centers connected to a keyboard, video, and
mouse (KVM) switch.
IMPORTANT! Do not use a KVM switch with USB mass storage to access the Defense
Center because the Defense Center may attempt to use the mass storage device as a
boot device.
INSTALLATION
Ethernet Connection to Management Interface
Congure a local computer, which must not be connected to the internet, with the
following network settings:
IP address: • 192.168.45.2
netmask: • 255.255.255.0
default gateway: • 192.168.45.1
Using an Ethernet cable, connect the network interface on the local computer to the
management interface on the Defense Center. To interact with the Defense Center, use
terminal emulation software such as HyperTerminal or XModem. The settings for this
software are as follows:
9600 baud•
8 data bits•
no parity checking•
1 stop bit•
no ow control•
Note that the management interface on a physical Sourcere Defense Center
is precongured with a default IPv4 address. However, you can recongure the
management interface with an IPv6 address as part of the setup process.
Quick Start Guide - DC750
Page 2 of 4
2014-5.3-2