NPE-G1 and NPE-G2 Installation and
Configuration Information
This chapter provides information on installing and configuring the NPE-G1 and NPE-G2 and contains
the following sections:
• Preparing for an Upgrade, page 7-2
• Copying the Configuration File, page 7-4
• Removing the Network Processing Engine, page 7-7
• Installing the NPE-G1 or NPE-G2, page 7-18
• Enabling the Second Processor on the NPE-G1, page 7-46
• Copying the Saved Configuration to NVRAM, page 7-52
• Auxiliary and Console Port Information, page 7-56
• Configuring the Native Gigabit Ethernet Interfaces, page 7-56
• Using show Commands to Check the Installation, page 7-59
• Upgrading the Cisco IOS Image and the Boot Helper (Boot Loader) Image, page 7-62
OL-4448-12
• Upgrading ROMmon on the NPE-G1 or NPE-G2, page 7-63
• Troubleshooting the Upgrade, page 7-65
• Upgrading FPGA on the NPE-G2, page 7-67
• Troubleshooting the NPE-G1 or NPE-G2, page 7-67
• Fiber Optic Cleaning Information, page 7-67
NoteThe Cisco 7200 VXR routers and Cisco uBR7200 series routers use different models of the NPE-G1 and
the NPE-G2 processors. For the Cisco 7200 VXR routers, order the NPE-G1 or NPE-G1= product. For
the Cisco uBR7200 series routers, order the UBR7200-NPE-G1, UBR7200-NPE-G1=,
UBR7200-NPE-G2, or UBR7200-NPE-G2= product.
Network Processing Engine and Network Services Engine Installation and Configuration
7-1
Preparing for an Upgrade
TipBefore you begin any removal or installation procedure, read Chapter 8, “Preparation for Installation.”
Also, for the NPE-G1, see the NPE-G1 Read Me First document, at the following URL:
http://www.cisco.com/en/US/products/hw/routers/ps341/prod_installation_guide09186a00805e396a.ht
ml
For the Cisco uBR7200-NPE-G1, see the Cisco uBR7200-NPE-G1 Read Me First document, at the
following URL:
NoteCisco IOS Release 12.2 changed the behavior of the ROM monitor (ROMmon) during the bootup
sequence. See the “Boot Changes in Cisco IOS Release 12.2” section on page 10-2 for more information.
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Upgrading to the NPE-G1 or NPE-G2 is a different procedure than previous processor upgrades because
of the following considerations:
• The NPE-G1 and NPE-G2 contain an I/O controller, which includes the bootflash and NVRAM
memory. After you install the NPE-G1 or NPE-G2 in a chassis, you can no longer access the
bootflash and NVRAM on the I/O controller. You therefore must make the existing Cisco IOS
software image and configuration files available to the NPE-G1 or NPE-G2, either by putting these
files on a CompactFlash Disk or on a TFTP server.
• The NPE-G1 and NPE-G2 include three Gigabit Ethernet interfaces. If you want to use these
interfaces to replace the Ethernet or Fast Ethernet interfaces on the existing I/O controller, you must
configure the new interfaces before they can be used to access the network. If you are also removing
the existing I/O controller, you must remove the configuration for its Ethernet or Fast Ethernet
interfaces.
NoteThe NPE-G2 provides a Fast Ethernet Management port, as well as three RJ-45 Gigabit
Ethernet ports.
• The NPE-G1 and NPE-G2 use Type 1 CompactFlash Disk memory instead of the Type 2 Flash Disk
memory used in existing I/O controllers. You must transfer any information currently saved on Flash
Disks to CompactFlash Disks so that it can be used after the upgrade to the NPE-G1 or NPE-G2.
NoteIf you are upgrading to an NPE-G2 from an NPE-G1, you do not need to perform the following
procedure.
To ensure a smooth upgrade, perform the following procedure only if you are upgrading to an NPE-G1
or NPE-G2 from an NPE-400 or earlier network processing engine.
Network Processing Engine and Network Services Engine Installation and Configuration
7-2
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Before you install an NPE-G1 or NPE-G2 in an existing router and remove the existing processor and
I/O controller, do the following:
Step 1Copy the configuration file from the existing router to a TFTP server, Flash Disk, or PC Card. See the
“Copying the Configuration File” section on page 7-4 for details.
Step 2Modify the configuration file to accommodate the new Gigabit Ethernet interfaces on the NPE-G1 or
NPE-G2. If you are also planning to remove the I/O controller, also remove the configuration lines for
the Ethernet or Fast Ethernet interfaces on the I/O controller. See the “Configuring the Native Gigabit
Ethernet Interfaces” section on page 7-56 for guidelines.
Step 3Copy the modified configuration file to a CompactFlash Disk that can be used on the NPE-G1 or
NPE-G2. If you are not planning on removing the existing I/O controller, you can do this by copying the
configuration to a Flash Disk, as described in Step 1, before you install the NPE-G1 or NPE-G2. Then
you can keep the Flash Disk in the I/O controller and copy it to a CompactFlash Disk in the NPE-G1 or
NPE-G2 after you have finished installing the NPE-G1 or NPE-G2.
If you are planning on removing the existing I/O controller, you can copy the configuration file to a
CompactFlash Disk in the following ways:
• Copy the configuration file to a TFTP server and then copy it to a CompactFlash Disk on an existing
NPE-G1 or NPE-G2.
Preparing for an Upgrade
• Copy the configuration file to a Type 2 Flash Disk using the existing I/O controller, as described in
the “Copying the Configuration File to a Flash Disk or PC Card” section on page 7-4. Then use a
multi-function reader that accommodates both Type 1 CompactFlash Disk and Type 2 Flash Disk
memory cards to transfer the configuration file to the CompactFlash Disk.
• Use a Type 1-to-Type 2 adapter to convert the CompactFlash Disk to the Flash Disk form factor.
Then insert the CompactFlash Disk and adapter into the existing I/O controller and copy the
configuration file to it, as described in Step 1.
NoteThe CompactFlash Disk must be formatted before you can write any files to it. The
CompactFlash Disk shipped with the NPE-G1 or NPE-G2 is already formatted, but a spare
CompactFlash Disk must be formatted using the format command. Do not format the
CompactFlash Disk in a PC or other workstation because the router cannot use CompactFlash
Disks that are formatted by other computers. After the CompactFlash Disk is properly formatted,
however, you can write to it using any PC or workstation that recognizes Type 2 CompactFlash
Disk memory.
Step 4(Optional) Copy the proper Cisco IOS software image (see Table 8-4 on page 8-4) to the CompactFlash
Disk, using the same technique you used to copy the configuration file in Step 3. You do not need to
perform this step if you plan to boot the router from a TFTP server, but you must add the proper boot
configuration command to the configuration file when you modify it in Step 2.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-3
Copying the Configuration File
Copying the Configuration File
CautionBefore powering down the router to install the NPE-G1 or NPE-G2, you must save the current
configuration to a Flash Disk, PC Card, Trivial File Transfer Protocol (TFTP) file server, or PC before
you install the NPE-G1 or NPE-G2, or the configuration will be lost and you will have to manually
re-enter your configuration.
Cisco IOS looks to the NPE-G1 or NPE-G2 NVRAM for the startup running configuration, because the
NPE-G1 or NPE-G2, by default, stores the running configuration, whether or not an I/O controller is
installed with the NPE-G1 or NPE-G2.
The following sections provide instructions for copying the file to a Flash Disk, PC Card, or TFTP
server, and for copying it manually using a terminal program on a PC:
• Copying the Configuration File to a Flash Disk or PC Card, page 7-4
• Copying the Configuration File to a TFTP Server, page 7-5
• Copying the Configuration File Using a PC, page 7-7
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Copying the Configuration File to a Flash Disk or PC Card
Use the following instructions for copying the router configuration file to a Flash Disk or PC Card.
CautionIf the NPE-G1 or NPE-G2 will be installed in a router with either a C7200-I/O-GE/E or
C7200-I/O-2FE/E I/O controller, copy your running configuration to a Flash Disk, not a PC Card. PC
Cards are not supported on these I/O controllers when an NPE-G1 or NPE-G2 is present. If you copy the
running configuration to a PC Card with these I/O controllers present, you will not be able to retrieve
the running configuration after the NPE-G1 or NPE-G2 is installed.
Step 1Insert the Flash Disk or PC Card into I/O controller PC Card slot 0. If slot 0 is full, use slot 1. If you
need to format the Flash Disk, go to Step 2. If the Flash Disk is already formatted, go to Step 3.
Step 2Use the format disk0: command to format a Flash Disk in slot 0. Use the format disk1: command to
format a Flash Disk in slot 1. If you are using a PC card, use slot0 or slot1 as part of the command.
System#format disk0:
Format operation may take a while. Contineu: [confirm]
Format operation will destroy all data in ‘disk0:’. Continue? [confirm]
Format :Drive communication and 1st Sector Write OK...
Writing Monlib sectors
Monlib write complete
Format:All system sectors written. OK...
Format:Total sectors in formatted partitioin:81760
Format:Total bytes in formatted partition:49861120
Format:Operation completed successfully.
Format of disk0:complete
The Flash Disk is now formatted and ready to use in the system on which you formatted it.
Network Processing Engine and Network Services Engine Installation and Configuration
7-4
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 3Make sure you are at the privileged level of the EXEC command interpreter (check the system prompt
for a pound sign [#]). If the system prompt does not have a pound sign (#), enter enable, and then your
password.
Step 4Enter the show running-config command to display the router’s running configuration. Ensure that the
configuration information is complete and correct. If it is not, use the configure command to add or
modify the existing configuration. Then enter the copy running-config command. If you have a Flash
Disk 0 or 1, use disk0 or disk1 as part of the command. If you are using a PC Card, use slot0 or slot1
as part of the command.
Step 5To copy the running configuration file to the Flash Disk or PC Card, enter the copy running-config
disk0: filename or copy running-config slot0: filename command:
System#copy running-config disk0: filename
You have finished copying the running configuration file to the Flash Disk or PC Card.
Go to the “Removing the Network Processing Engine” section on page 7-7 for instructions on removing
the current network processing engine or network services engine and replacing it with the NPE-G1 or
NPE-G2.
Copying the Configuration File
Copying the Configuration File to a TFTP Server
Before copying the router configuration file to a TFTP file server, check the following items:
• A console terminal is connected to the console port on the I/O controller or a Telnet session is
established to the router.
• The router is connected to a network supporting a file server (remote host).
• The remote host supports the TFTP application.
• You have the name or address of the remote host.
Complete the following steps to copy the router’s configuration file to a remote host:
Step 1Make sure you are at the privileged level of the EXEC command interpreter (check the system prompt
for a pound sign [#]). If the system prompt does not have a pound sign (#), enter enable, and then your
password.
Step 2Use the ping command to check the connection between the router and the remote host.
Step 3Enter the show running-config command to display the router’s running configuration. Ensure that the
configuration information is complete and correct. If it is not, use the configure command to add or
modify the existing configuration. Then enter the copy running-config startup-config command to
save the retrieved configuration in NVRAM. NVRAM uses lithium batteries to maintain its contents
when disconnected from power.
NoteRefer to the appropriate software documentation listed in the “Related Documentation” section
on page iii for descriptions of the configuration options available for the system and individual
interfaces, and for specific configuration instructions.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-5
Copying the Configuration File
Step 4Enter the copy startup-config tftp command. The EXEC command interpreter prompts you for the
name or IP address of the remote host that is to receive the configuration file. (The prompt might
include the name or address of a default file server.)
Router# copy startup-config tftp
Remote host []?
Step 5Enter the name or IP address of the remote host. In the following example, the name of the remote host
Step 6The EXEC command interpreter prompts you for the name of the file that will contain the configuration.
By default, the system appends -confg to the router’s name to create the new filename. Press Return to
accept the default filename, or enter a different name for the file before pressing Return. In the following
example, the default is accepted:
Name of configuration file to write [Router-confg]?
Write file Router-confg on host 10.1.1.1? [confirm]
Writing Router-confg.....
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 7Before the router executes the copy process, it displays the instructions you entered for confirmation. If
the instructions are not correct, enter n (no), and then press Return to stop the process. To accept the
instructions, press Return, or y and then press Return; the system begins the copy process. In the
following example, the default is accepted:
While the router copies the configuration to the remote host, it displays a series of exclamation points
(! ! !) or periods (. . .). The !!!! and [ok] indicate that the operation is successful. A display of . . . [timed
out] or [failed] indicates a failure, which would probably be because of a network fault or the lack of a
writable, readable file on the remote file server.
Step 8Check the result of the copy process.
• If the display indicates that the process was successful (with the series of exclamation points [! ! !]
and [ok]), the copy process is complete. The configuration file is safely stored in the temporary file
on the remote file server.
• If the display indicates that the process failed (with the series of periods [. . .] as shown in the
following example), your configuration was not saved:
Writing Router-confg .....
Step 9If your configuration was not saved, repeat the preceding steps, or select a different remote file server
and repeat the preceding steps. If you are unable to copy the configuration to a remote host
successfully, contact your network administrator or see the “Obtaining Documentation and Submitting
a Service Request” section on page iv for instructions on contacting technical assistance.
This completes the procedure for copying the configuration file to a TFTP server. Proceed to “Removing
the Network Processing Engine” section on page 7-7.
Network Processing Engine and Network Services Engine Installation and Configuration
7-6
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Copying the Configuration File Using a PC
Complete the following steps to copy the router’s configuration file to a text file on a PC connected to
the router’s console port.
Step 1Connect a serial port on the PC to the router’s console port. Start a terminal program on the PC and
configure it for the same baud rate, parity, and stop-bits that the console port is using.
Step 2Turn on the terminal program’s capture buffer so that it will save all output to a text file.
Step 3Enter the show startup-config command in privileged EXEC mode to display the router’s startup
configuration.
NoteRefer to the appropriate software documentation listed in the “Related Documentation” section
on page iii for descriptions of the configuration options available for the system and individual
interfaces, and for specific configuration instructions.
Step 4When the router has completed displaying the configuration, turn off the terminal program’s capture
buffer and save the configuration file to the disk on the PC.
Step 5(Optional) Use a text editor on the PC to modify the configuration, as needed.
Removing the Network Processing Engine
This completes the procedure for copying the configuration file to a PC. Proceed to “Removing the
Network Processing Engine” section on page 7-7.
Removing the Network Processing Engine
Before you begin any removal or installation procedure, read Chapter 8, “Preparation for Installation.”
To install the NPE-G1 or NPE-G2, follow the instructions in this chapter for removal of an existing
network processing engine or network services engine and installation of the NPE-G1 or NPE-G2.
NoteIf you are removing the I/O controller, and do not plan to replace it, you must install an I/O controller
blank panel (Cisco Product Number IO-CONTROLR-BLANK=) in the I/O controller slot. See the
Input/Output Controller Replacement Instructions for information on removing an I/O controller and
installing an I/O controller blank panel.
If you are installing a Port Adapter Jacket Card, see the Port Adapter Jacket Card Installation Guide for
installation information.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-7
Removing the Network Processing Engine
Ensuring Easy Access to the Router
If your Cisco 7200 VXR router or Cisco uBR7200 series router is installed in a standard 19-inch, 4-post
or telco-type rack, cables from other equipment in the rack might obstruct access to the rear of the router.
Also, rack power strips or other permanent fixtures may obstruct access to the router. Review the
following guidelines to ensure easy access to the rear of the router when it is installed in a rack. This is
particularly important because the NPE-G1 and NPE-G2 have interfaces that require cabling on the rear
of the router.
If the router is not installed in a rack, or if you already have clear access to the rear of the router, proceed
to the “Powering Down the Router and Disconnecting Input Power” section on page 7-8.
Use the following guidelines to ensure easy access to the rear of the router when it is installed in a rack:
• Ensure that you have at least 3 to 4 feet (0.91 to 1.22 meters) of working space at the rear of the
router.
• If cables from other equipment in the rack fall in front of the rear end of the router, carefully gather
the cables (using care not to strain or stress them) and use cable ties to anchor them away from the
rear of the router.
• If access to the rear of the router is partially blocked by a power strip or some other permanent rack
fixture, detach the router from the rack and carefully slide it forward until there is enough clearance
to remove the power supply, the network processing engine, and the subchassis from the router.
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
CautionMake sure that at least one other person is available to support the front of the router as you slide it out
from the rack and, if necessary, to continue to support it while you remove and insert the power supply,
network processing engine, or subchassis.
Powering Down the Router and Disconnecting Input Power
Complete the steps in the following sections to power down the router and disconnect input power.
Warning
Powering Down the Router
NoteBefore powering down the router, use the copy running-config startup-config command to save the
This unit might have more than one power cord. To reduce the risk of electric shock, disconnect the
two power cords before servicing. Statement 83
To power down a Cisco 7200 VXR router or Cisco uBR7200 series router, complete the following steps:
router’s running configuration to a Flash Disk, PC Card, TFTP server, or PC. If you do not, you will have
to manually re-enter the configuration after you install the NPE-G1 or NPE-G2 and power on the router.
See the “Copying the Configuration File” section on page 7-4.
Step 1Facing the rear of the router, place the power switch on the power supply in the off (O) position. Repeat
this action if a second power supply is installed in the router.
Network Processing Engine and Network Services Engine Installation and Configuration
7-8
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
NoteWhen powering off the router, wait a minimum of 30 seconds before powering it on again.
Step 2Observe the following items:
• The green OK LED on the power supply turns off.
• The fans stop operating.
• The LEDs on the I/O controller turn off.
• The LEDs on the port adapters turn off.
CautionWhen the power switch on a Cisco uBR7200 series power supply is turned to the off (O) position, the
power supply enters a reset cycle for 90 seconds. Wait at least 90 seconds before turning the power
switch back to the on (|) position. If you do not wait the full 90 seconds, the power supply does not
restart.
Removing the Network Processing Engine
This completes the procedure for powering down the router. The following sections provide instructions
on disconnecting power from the Cisco 7200 VXR routers and Cisco uBR7200 series routers:
• Disconnecting AC-Input Power from a Cisco 7200 VXR Router, page 7-9
• Disconnecting AC-Input Power from a Cisco uBR7246VXR Router, page 7-10
• Disconnecting AC-Input Power from a Cisco uBR7225VXR Router, page 7-11
• Disconnecting DC-Input Power from a Cisco 7200 VXR Router, page 7-11
• Disconnecting DC-Input Power from a Cisco uBR7246VXR Router, page 7-13
Disconnecting AC-Input Power from a Cisco 7200 VXR Router
To disconnect AC-input power from a Cisco 7200 VXR router, complete the following steps:
Step 1Unplug the input power cable from the power source.
Step 2Push up on the cable-retention clip that secures the input power cable to the router power supply.
Step 3Unplug the other end of the input power cable from the power supply. See Figure 7-1.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-9
Removing the Network Processing Engine
Figure 7-1Disconnecting Power from a Cisco 7200 VXR Router AC-Input Power Supply
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
2
1
66415
NETW
ORK PROCESSING ENGINE
-300
3
4
1AC-input receptacle3Power switch
2Internal fans4AC-input power supply
Step 4
Repeat Step 1 through Step 3 if a second power supply is installed.
This completes the procedure for disconnecting AC-input power from a Cisco 7200 VXR router. Go to
the “Removing the NPE or NSE-1” section on page 7-16.
Disconnecting AC-Input Power from a Cisco uBR7246VXR Router
To disconnect AC-input power from a Cisco uBR7246VXR router, complete the following steps:
Step 1Unplug the input power cable from the power source.
Step 2Push the cable-retention clip that secures the input power cable to the router power supply to the left.
Step 3Unplug the other end of the input power cable from the power supply. See Figure 7-2.
Network Processing Engine and Network Services Engine Installation and Configuration
7-10
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-2Disconnecting Power from a Cisco uBR7246VXR AC-Input Power Supply
Removing the Network Processing Engine
4
5
66434
21
3
1AC-input receptacle 4Network processing engine
2Power switch 5AC-input power supply
3Handle
Step 4Repeat Step 1 through Step 3 if a second power supply is installed.
This completes the procedure for disconnecting AC-input power from a Cisco uBR7246VXR router. Go
to the “Removing the NPE or NSE-1” section on page 7-16.
Disconnecting AC-Input Power from a Cisco uBR7225VXR Router
To disconnect AC-input power from a Cisco uBR7225VXR router, complete the following steps:
Step 1Unplug the input power cable from the power source.
Step 2Unplug the other end of the input power cable from the power supply.
NoteThe Cisco uBR7225VXR router power supply does not have a cable retention-clip.
Disconnecting DC-Input Power from a Cisco 7200 VXR Router
To disconnect DC-input power from a Cisco 7200 VXR router, complete the following steps.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-11
Removing the Network Processing Engine
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Warning
Before completing any of the following steps, and to prevent short-circuit or shock hazards, ensure
that power is removed from the DC circuit. To ensure that all power is OFF, locate the circuit breaker
on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and
Warning
tape the switch handle of the circuit breaker in the OFF position.
When you install the unit, the ground connection must always be made first and disconnected last.
Statement 332
Statement 42
Step 1At the rear of the router, check that the power switch on the power supply is in the off (O) position. (For
the Cisco 7200 VXR routers, see Figure 7-3.)
Step 2Ensure that no current is running through the –V and +V leads. To ensure that all power is off, locate the
circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the off
position, and tape the switch handle of the circuit breaker in the off position.
Step 3Disconnect the –V and +V leads. You can leave the ground cable connected.
For a Cisco 7200 VXR router, remove the cable tie that secures the –V, +V, and ground leads to the power
supply faceplate. Save the cable tie.
NoteThe cable tie that accompanied your Cisco 7200 VXR router DC-input power supply can be
removed and replaced on the power supply without the use of a tool. If you secured the DC-input
power supply leads to the power supply faceplate using a different type of cable tie, use a wire
stripper to cut that cable tie from the power supply.
Step 4
Figure 7-3Disconnecting Power from a Cisco 7200 VXR Router DC-Input Power Supply
12
66431
networking xxxx engine
34
1DC-input receptacle3Power switch
2Internal fans4DC-input power supply
Using a 3/16-inch flat-blade screwdriver, loosen the screw below the +V lead receptacle and pull the lead
from the connector. See Figure 7-3.
Network Processing Engine and Network Services Engine Installation and Configuration
7-12
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 5Repeat this step for the –V lead and the ground lead.
NoteThe color coding of the DC-input power supply leads depends on the color coding of the DC
power source at your site. Typically, green or green and yellow are used for ground. Make certain
that the lead color coding you choose for the DC-input power supply matches the lead color
coding used at the DC power source.
Step 6Repeat Step 1 through Step 6 if a second power supply is installed.
This completes the procedure for disconnecting DC-input power from a Cisco 7200 VXR router. Go to
the “Removing the NPE or NSE-1” section on page 7-16.
Disconnecting DC-Input Power from a Cisco uBR7246VXR Router
To disconnect DC-input power from a Cisco uBR7246VXR router, complete the following steps.
Removing the Network Processing Engine
Warning
Warning
Step 1At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2Ensure that no current is running through the –V and +V leads. To ensure that all power is off, locate the
Before completing any of the following steps, and to prevent short-circuit or shock hazards, ensure
that power is removed from the DC circuit. To ensure that all power is OFF, locate the circuit breaker
on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and
tape the switch handle of the circuit breaker in the OFF position.
When you install the unit, the ground connection must always be made first and disconnected last.
Statement 42
Statement 322
circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the off
position, and tape the switch handle of the circuit breaker in the off position.
Step 3Use a 7-mm wrench or nut driver (or adjustable wrench) to loosen and remove the two M4 nuts from the
strain-relief cover that secures the –V and the +V leads to the power supply faceplate. See Figure 7-4.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-13
Removing the Network Processing Engine
Figure 7-4Removing the Strain-Relief Cover from a Cisco uBR7246VXR Router DC-Input Power
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Supply
1
2
8
3
9
4
5
7
6
66408
1Power switch6–V lead
2Power receptacle7+V lead
3Captive screw 8Strain-relief cover
4M5 grounding receptacles9M4 nuts and studs
5M5 grounding lug
7-14
Step 4
Using a 3/16-inch flat-blade screwdriver, loosen the screw below the +V lead receptacle and pull the lead
from the connector. Repeat this step for the –V lead only. See Figure 7-5.
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-5Disconnecting Power from a Cisco uBR7246VXR DC-Input Power Supply
Removing the Network Processing Engine
1
2
3
4
7
8
5
6
1Power switch6–V lead
2Power receptacle7M4 studs
3DC Power supply8+V lead
4M5 grounding receptacles9Handle
5M5 grounding lug
9
66406
OL-4448-12
Step 5
Using an 8-mm wrench or nut driver (or adjustable wrench), loosen and remove the two M5 nuts that
secure the two-hole grounding lug to the grounding receptacle, and pull the grounding lug and lead from
the receptacle.
NoteThe color coding of the DC-input power supply leads depends on the color coding of the DC
power source at your site. Typically, green or green and yellow are used for ground. Make certain
that the lead color coding you choose for the DC-input power supply matches the lead color
coding used at the DC power source.
Step 6Repeat the steps above to disconnect a secure power supply.
This completes the procedure for disconnecting DC-input power from a Cisco uBR7246VXR router. Go
to the following section, “Removing the NPE or NSE-1.”
Network Processing Engine and Network Services Engine Installation and Configuration
7-15
Removing the Network Processing Engine
Removing the NPE or NSE-1
To remove the NPE or NSE-1 from a Cisco 7200 VXR router, a Cisco uBR7246VXR or a Cisco
UBR7225VXR router complete the following steps.
NoteThe weight of installed power supplies in your Cisco 7200 VXR or Cisco uBR7246VXR router might
make it difficult to remove the network processing engine. If you have difficulty, first remove the power
supplies from the chassis, and then remove the network processing engine. See the “Removing and
Replacing an AC-Input or DC-Input Power Supply” section on page 10-14 for information on removing
and replacing an installed power supply.
NoteIf you have difficulty installing a network processing engine or I/O controller in the lowest slot of a Cisco
7200 VXR router that is rack-mounted, remove the port adapters, network processing engine and I/O
controller from the chassis and reinstall them. Install the network processing engine and I/O controller
in the lowest slots first, then populate the slots above them, in a bottom-to-top order.
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 1Power down the router and disconnect the input power cable. (See the “Powering Down the Router and
Disconnecting Input Power” section on page 7-8.)
Step 2Attach an ESD-preventive wrist strap between you and an unfinished chassis surface.
Step 3Using a number 2 Phillips or a 3/16-inch flat-blade screwdriver, loosen the two captive installation
screws on the faceplate of the network processing engine. (See Figure 7-6.)
If the router is not installed in a standard 19-inch, 4-post or telco-type rack, skip to Step 7. If the router
is installed in a rack, determine if any permanent rack fixtures, such as a power strip, are obstructing
access to the rear of the router. If a rack fixture is obstructing access to the router, proceed with Step 4.
Network Processing Engine and Network Services Engine Installation and Configuration
7-16
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
1Captive installation screw3Network processing engine or network
2Handle4AC-input power supply
Removing the Network Processing Engine
66605
services engine
Step 4
Using a 3/16-inch flat-blade screwdriver, loosen the screws that secure the router to the front mounting
strips of the rack.
Step 5Position at least one person in front of the rack to support the front underside of the router.
Step 6From the rear of the rack, carefully push the front of the router out of the rack until there is enough
clearance to remove the network processing engine.
Step 7Grasp the network processing engine handle and carefully pull the network processing engine from its
chassis slot.
CautionHandle the network processing engine by the carrier edges and handle only; never touch the printed
circuit board components or connector pins.
Step 8Place the NPE on an antistatic surface with its printed circuit board components facing upward, or in a
static shielding bag. If you are returning the network processing engine to the factory, immediately place
it in a static shielding bag.
This completes the procedure for removing an installed NPE. For instructions on installing the NPE-G1
or NPE-G2, go to the “Installing the NPE-G1 or NPE-G2” section on page 7-18.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-17
Installing the NPE-G1 or NPE-G2
Installing the NPE-G1 or NPE-G2
To install the NPE-G1 or NPE-G2 in the router, use the following procedures:
• Basic Guidelines, page 7-18
• Installing a CompactFlash Disk, page 7-19
• Installing a USB Flash Memory Module or eToken—NPE-G2, page 7-19
• Installing an SFP Module—NPE-G2, page 7-20
• Installing a GBIC—NPE-G1, page 7-23
• Replacing the DIMM on the NPE-G2, page 7-24
• Upgrading the SDRAM SODIMMs on the NPE-G1 (Optional), page 7-26
• Inserting the NPE-G1 or NPE-G2 into the Router, page 7-28
• Attaching the Rear Cable-Management Brackets and Cables (Optional), page 7-29
• Reconnecting Input Power and Powering Up the Router, page 7-35
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Basic Guidelines
NoteIf you have difficulty installing a network processing engine or I/O controller in the lowest slot of a Cisco
7200 VXR router that is rack-mounted, remove the port adapters, network processing engine and I/O
controller from the chassis and reinstall them. Install the network processing engine and I/O controller
in the lowest slots first, then populate the slots above them, in a bottom-to-top order.
Use the following guidelines when installing the NPE-G1 or NPE-G2:
Step 1Ensure that the router is powered down and the input power cable is disconnected from the router and
the power source. See the “Powering Down the Router and Disconnecting Input Power” section on
page 7-8.
Step 2Attach an ESD-preventive wrist strap between you and an unfinished chassis surface.
Step 3Remove the NPE-G1 or NPE-G2 from its static shielding bag.
Step 4When touching the NPE-G1 or NPE-G2, use both hands, grasp the NPE-G1 or NPE-G2 by its metal
carrier edges, and orient it so that its printed circuit board components face upward.
CautionHandle the NPE-G1 or NPE-G2 by the carrier edges and handle only; never touch the printed circuit
board components or connector pins.
Network Processing Engine and Network Services Engine Installation and Configuration
7-18
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing a CompactFlash Disk
Use the following instructions to install the CompactFlash Disk.
Figure 7-7Installing a CompactFlash Disk
Installing the NPE-G1 or NPE-G2
13
ORK PROCESSING ENGINE - G1
C
O
M
P
A
C
T FLAS
H
2
ORK PROCESSING ENGINE - G1
C
O
M
P
A
C
T FLA
SH
ORK PROCESSING ENGINE - G1
C
O
M
P
A
C
T F
LAS
H
66776
1Inserting the CompactFlash Disk3Removing the CompactFlash Disk
2Pressing the ejector button to release the
CompactFlash Disk
Step 1Turn the CompactFlash Disk so that the label is facing down.
Step 2Slide the CompactFlash Disk into the CompactFlash Disk slot.
Step 3To remove the CompactFlash Disk, push the ejector button, and gently pull the CompactFlash Disk from
its slot.
You are finished installing the CompactFlash Disk. For more information on using the CompactFlash
Disk, see Using the Flash Disk at the following URL:
http://www.cisco.com/en/US/products/hw/routers/ps341/prod_installation_guide09186a00802a6394.ht
ml
For instructions on installing an SFP module in the NPE-G2, go to the “Installing an SFP
Module—NPE-G2” section on page 7-20.
For instructions on installing a Gigabit Interface Converter (GBIC) in the NPE-G1, go to the “Installing
a GBIC—NPE-G1” section on page 7-23.
Installing a USB Flash Memory Module or eToken—NPE-G2
To connect a Cisco USB Flash memory module or the Aladdin USB eToken Pro key to the NPE-G2 USB
port, simply insert the module into the port as shown in Figure 7-8. The USB Flash memory module can
be inserted in only one way, and can be inserted or removed regardless of whether the router is powered
up or not.
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
7-19
Installing the NPE-G1 or NPE-G2
CautionDo not remove a USB Flash memory module when a read or write operation to the USB Flash memory
module is in progress. The router might reload, or the USB Flash memory module can be damaged.
NoteOnly Cisco USB Flash memory modules and the Aladdin USB eToken Pro key are supported by Cisco
routers.
Figure 7-8Connecting a USB Flash Memory Module to a Router USB Port
AUX
FE 0/2
FOR MANAGEMENT
USE ONLY
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
FE
LINK
USB
U
S
B
NoteFor detailed information about the Cisco IOS commands that support USB Flash memory modules, see
the Cisco USB eToken and USB Flash Features Support document.
Go to the “Inserting the NPE-G1 or NPE-G2 into the Router” section on page 7-28 for instructions on
installing the NPE-G1 or NPE-G2 in the chassis.
Installing an SFP Module—NPE-G2
NoteThe SFP module is a separately orderable part and ships installed in your NPE-G2. However, if you are
adding a SFP module, you must install the SFP module before you connect the cables to it. We strongly
recommend cleaning optical cable connectors before connecting them to the SFP modules. See the
“Fiber Optic Cleaning Information” section on page 7-67.
138993
Network Processing Engine and Network Services Engine Installation and Configuration
7-20
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-9Types of SFP Module Latches
123
1Sliding latch3Swing latch
2Swing and slide latch
Installing the NPE-G1 or NPE-G2
80755
NoteThe SFP module must be installed before you connect the cables to it.
The SPF module has three types of latches, which are also the removal mechanism. See Figure 7-9.
is no correlation of the type of latch to the model (such as SX or LH) or technology type (such as Gigabit
Ethernet) of SFP modules.
Always read the label on the SFP module to determine the technology type,
and model. You can install and remove Gigabit Ethernet SFP modules with power on to the system.
Disconnect all cables before removing or installing a Gigabit Ethernet SFP module. We strongly
recommend that you do not install or remove the SFP module with optical fiber cables attached to it. SFP
modules are keyed to prevent incorrect insertion.
Warning
Warning
Warning
Warning
Invisible laser radiation may be emitted from disconnected fibers or connectors. Do not stare into
beams or view directly with optical instruments.
Class 1 laser product.
Class 1 LED product.
Statement 1008
Statement 1027
Statement 1051
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
touch the backplane with your hand or any metal tool, or you could shock yourself.
Statement 94
There
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-21
Installing the NPE-G1 or NPE-G2
Figure 7-10 Inserting an SFP Module into the NPE-G2 Gigabit Ethernet Port 0/1
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
LINK
ACTV
EN
GIGABIT ETHERNET 0 / 1
LINK
ACTV
TX
RX
RJ45
EN
GIGABIT ETHERNET 0 / 2
LINK
ACTV
EN
RJ45
149065
2
1SFP port 0/12SFP module
Use the following procedure to install an SFP module in the NPE-G2:
1
Step 1Attach an ESD-preventive wrist strap between you and an unpainted chassis surface.
Step 2Locate the label on the SFP module and turn the SFP module so the label is on top and the alignment
groove is down.
7-22
NoteThe SFP module is keyed so that it cannot be inserted incorrectly.
Step 3Insert the SFP module into SFP port 0/1, 0/2, or 0/3. The SFP module snaps into place when you have
completely and properly inserted it.
Step 4Repeat Step 2 if you are inserting a second or third SFP module.
NoteDo not remove the plug from the SFP module optical bores until you are ready to install the network
interface optical fiber cable. Save the plug for future use.
NoteWe strongly recommend cleaning all optical fiber connections before connecting optical cables to
equipment. For information about cleaning optical connectors, see the Inspection and Cleaning
Procedures for Fiber-Optic Connections document and the Compressed Air Cleaning Issues for
Fiber-Optic Connections document.
This completes the SFP module installation procedure. For information on inserting the NPE-G2 into the
chassis, see the “Inserting the NPE-G1 or NPE-G2 into the Router” section on page 7-28.
Network Processing Engine and Network Services Engine Installation and Configuration
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing a GBIC—NPE-G1
Use the instructions in this section to install a GBIC in the NPE-G1.
Figure 7-11Installing a GBIC in the NPE-G1
Installing the NPE-G1 or NPE-G2
3
2
5
ETHERNET 0/1
RX
GBIC
TX
GIGABIT ETHERNET 0/2
LINK
EN
RJ45
RX
GBIC
4
1
1GBIC4GBIC port 0/2
2Alignment groove5Plug
3GBIC port 0/1
Step 1Turn the GBIC so the label side is up and the alignment groove is down.
NoteThe GBIC is keyed so that it cannot be inserted incorrectly.
Step 2Insert the GBIC into GBIC port 0/1, 0/2, or 0/3. Repeat this step if you are installing more than one
GBIC.
66774
NoteDo not remove the GBIC plugs until you are ready to install the cables.
You are finished installing the GBICs. For more information on cabling or specifications, see the
“Gigabit Ethernet GBIC Connection Equipment” section on page 5-13.
NoteWe strongly recommend cleaning all optical fiber connections before connecting optical cables to
equipment. For information about cleaning optical connectors, see the Inspection and Cleaning
Procedures for Fiber-Optic Connections document and the Compressed Air Cleaning Issues for
Fiber-Optic Connections document.
Go to the “Inserting the NPE-G1 or NPE-G2 into the Router” section on page 7-28 for instructions on
installing the NPE-G1 or NPE-G2 in the chassis.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-23
Installing the NPE-G1 or NPE-G2
Replacing the DIMM on the NPE-G2
To replace the DIMM on the NPE-G2, use the following instructions:
Step 1Locate the DIMM on the NPE-G2. See Figure 7-12.
Figure 7-12Locating the DIMM on the NPE-G2
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
1
149472
1DIMM
Step 2Remove the DIMM by pressing against the DIMM latches until the DIMM releases.
Step 3Gently remove it from the DIMM socket.
Network Processing Engine and Network Services Engine Installation and Configuration
7-24
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-13Installing or Removing the DIMM on the NPE-G2
Installing the NPE-G1 or NPE-G2
149068
Step 4
Gently insert a DIMM into the DIMM socket.
Step 5Push the release latches until they slip into the notch on the edge of the DIMM, holding it securely in
place.
You have finished replacing the DIMM. To install the NPE-G2 in the chassis, go to the “Inserting the
NPE-G1 or NPE-G2 into the Router” section on page 7-28.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-25
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Upgrading the SDRAM SODIMMs on the NPE-G1 (Optional)
If you have purchased an SDRAM memory upgrade for the NPE-G1, replace the SDRAM SODIMMs
on the NPE-G1 using the following instructions.
Removing a SODIMM
Step 1Locate the SODIMMs on the NPE-G1.
Figure 7-14Locating the SODIMMs on the NPE-G1
2
1
GIGABIT ETHERNET 0/1
LINK
EN
RXTX
RJ45GBIC
GIGABIT ETHERNET 0/1
LINK
EN
RXTX
RJ45GBIC
GIGABIT ETHERNET 0/1
LINK
EN
RXTX
RJ45GBIC
NETWORK PROCESSING ENGINE - G1
CPU
RESET
COMPACT FLASH
SLOT
ACTIVE
POWER
CONSOLE AUX
ON
66948
1SODIMM 22SODIMM 1
NoteBoth SODIMMs must be of the same size and type, and both SODIMM sockets must be populated.
Step 2Remove the SODIMM you want to replace by pulling outward on the SODIMM spring latches with your
thumbs.
The SODIMM springs up to allow you to easily pull it from the socket.
Network Processing Engine and Network Services Engine Installation and Configuration
7-26
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-15Removing or Installing an SDRAM SODIMM
Installing the NPE-G1 or NPE-G2
1
1SODIMM
Step 3
Remove the SODIMM from the socket. Avoid touching the SODIMM as much as possible, particularly
the traces, the metal fingers on the connector side of the SODIMM.
Step 4Place the SODIMM in an antistatic shielding bag.
Installing a SDRAM SODIMM
CautionSODIMMs are sensitive components that are susceptible to ESD damage. Handle SODIMMs by the
edges only; avoid touching the memory modules, pins, or traces (the metal fingers along the connector
edge of the SODIMM).
Step 1Remove a new SODIMM from the antistatic container.
Step 2Hold the SODIMM component-side-up, with the connector edge (the metal fingers) away from you.
Step 3Align the new SODIMM notch with the connector and insert the SODIMM into the socket.
66437
CautionWhen inserting the SODIMM, use firm but not excessive pressure. If you damage a socket, you will have
to return the NPE-G1 to the factory for repair.
Step 4Gently press on the SODIMM until the SODIMM spring latches snap into place.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-27
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Step 5If the SODIMM appears misaligned, carefully remove it and reseat it in the socket. Push the SODIMM
gently back into the socket until the spring latches snap into place.
You have finished replacing the SDRAM SODIMM. To install the NPE-G1 in the chassis, go to the
“Inserting the NPE-G1 or NPE-G2 into the Router” section on page 7-28.
Inserting the NPE-G1 or NPE-G2 into the Router
NoteIf you have difficulty installing a network processing engine or I/O controller in the lowest slot of a Cisco
7200 VXR router that is rack-mounted, remove the port adapters, network processing engine and I/O
controller from the chassis and reinstall them. Install the network processing engine and I/O controller
in the lowest slots first, then populate the slots above them, in a bottom-to-top order.
To insert the NPE-G1 or NPE-G2 into the router, follow the instructions in this section:
Step 1Align the left and right edges of the NPE-G1 or NPE-G2 with the chassis slot guides. Figure 7-16 shows
an NPE-G1 being installed into a Cisco 7200 VXR router; inserting an NPE-G2 is similar. Inserting a
Cisco uBR7200-NPE-G1 or Cisco uBR7200-NPE-G2 in a Cisco uBR7200 series router is similar.
Figure 7-16Aligning the NPE-G1 Between the Slot Guides on a Cisco 7200 VXR Router
66773
1
G
IG
A
B
IT
E
T
H
E
R
N
E
T
0
/1
G
IG
A
B
IT
E
T
H
E
R
N
E
T
0
/1
G
IG
A
B
IT
E
T
H
E
R
N
E
T
0
/1
NETW
LINK
EN
RJ45
RX
LINK
EN
GBIC
TX
RJ45
RX
LINK
EN
GBIC
TX
RJ45
ORK PROCESSING ENGINE - G1
CPU
RESET
RX
GBIC
TX
COMPACT FLASH
SLOT
ACTIVE
POWER
C
ONSO
LE
ON
AU
X
3
2
4
1Slot guides3Printed circuit board
2NPE-G14Metal carrier
Step 2
Gently slide the NPE-G1 or NPE-G2 all the way into its chassis slot until you feel the connectors seat
with the router midplane.
Step 3Seat the NPE-G1 or NPE-G2 in the router midplane by tightening its captive installation screws with a
number 2 Phillips or a 3/16-inch flat-blade screwdriver.
Network Processing Engine and Network Services Engine Installation and Configuration
7-28
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
NoteThe NPE-G1 or NPE-G2 is not fully seated in the router midplane until you tighten its captive
installation screws.
Step 4If you removed power supplies from the router, replace the power supplies. (See the “Removing and
Replacing an AC-Input or DC-Input Power Supply” section on page 10-14 when replacing a power
supply in a Cisco 7200 VXR router.)
Step 5If you slid the front of the router out of the rack, slowly guide the router back into the rack.
Step 6Use a 3/16-inch flat-blade screwdriver to tighten the screws that secure the router to the front mounting
strips of the rack.
This completes the procedure for installing the NPE-G1 or NPE-G2 in a Cisco 7200 VXR router.
Attaching the Rear Cable-Management Brackets and Cables (Optional)
You may choose to use one of two types of cable-management brackets. One type is the same as is used
on the front of the router for managing port adapter and I/O controller cables. The NPE-G1- or
NPE-G2-specific bracket is used only on the NPE-G1 or NPE-G2, and provides more support for optical
fiber cables.
Depending on whether the router is front-mounted or rear-mounted in the rack, install the
cable-management brackets to the router. Go to one of these sections for instructions on rear-mounting
the cable-management brackets and attaching the cables:
• Installing the NPE-G1 or NPE-G2 Cable-Management Brackets, page 7-29—This procedure applies
to both the Cisco 7200 VXR routers and Cisco uBR7200 series routers.
• Installing the Rear Cable-Management Brackets on a Front-Mounted Router (Optional),
page 7-31—This procedure applies to only the Cisco 7200 VXR routers.
• Installing the Rear Cable-Management Brackets on a Rear-Mounted Router (Optional),
page 7-32—This procedure applies to only the Cisco 7200 VXR routers.
• Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional),
page 7-34—This procedure applies to only the Cisco UBR 7246VXR universal broadband router.
Installing the NPE-G1 or NPE-G2 Cable-Management Brackets
If you are using the NPE-G1 or NPE-G2 and installing the cable-management bracket (Cisco Product
Number MAS-7200-CBLMGMT), use the following instructions. Figure 7-17 illustrates installing the
bracket on the NPE-G1 or NPE-G2 on the Cisco 7200 VXR routers. Figure 7-18 illustrates installing the
bracket on the Cisco uBR7200-NPE-G1 or Cisco uBR7200-NPE-G2 on the Cisco uBR7200 series
routers.
NoteThe captive installation screws on the NPE-G1 or NPE-G2 must be fastened to allow the
cable-management bracket to provide proper cable support and strain relief. Always ensure that the
captive installation screws are properly tightened.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-29
Installing the NPE-G1 or NPE-G2
NoteDo not use the cable-management bracket as a handle for inserting and removing the NPE-G1 or
NPE-G2 in the chassis. You must always first unfasten the NPE-G1 or NPE-G2 captive installation
screws and remove the cable-management bracket before removing or inserting the NPE-G1 or NPE-G2
in the chassis.
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Network Processing Engine and Network Services Engine Installation and Configuration
7-30
THERNE
BIT E
IGA
G
LINK
EN
RX
RJ45GBIC
1
- G
E
IN
G
N
E
G
IN
S
S
E
C
O
R
P
K
R
O
W
T
T 0/1
LINK
EN
RJ45
TX
LINK
CPU
RESET
EN
TX
GBIC
RX
RJ45
TX
GBIC
RX
E
N
RNET 0/1
THE
BIT E
A
IG
G
T 0/1
ABIT ETHERNE
GIG
COMPACT FLASH
SLOTACTIVE
POWER
X
U
A
E
L
SO
N
O
C
ON
2
82702
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 1Loosen the left and right captive installation screws on the NPE-G1 or NPE-G2.
Step 2Hold the cable-management bracket so that it is positioned above the NPE-G1 or NPE-G2 captive
installation screws as shown in Figure 7-17 and Figure 7-18. The bracket is properly positioned when
the horizontally-faced notch is at the left, the vertically-faced notch is at the right, and the bracket’s outer
edge is flush with the edge on the NPE-G1 or NPE-G2. If you reverse the bracket so that it is not flush
with the NPE-G1 or NPE-G2, you will not be able to access the GBIC or SFP module connectors on the
NPE-G1 or NPE-G2 front panel.
Step 3Slide the left end of the bracket between the captive installation screw and the front panel of the NPE-G1
or NPE-G2.
Step 4Rotate the cable-management bracket down, until its other notch slides behind the right captive
installation screw. Make sure the bracket’s outer edge is flush with the edge of the NPE-G1 or NPE-G2
and does not obstruct the GBIC or SFP ports.
Step 5Tighten both captive installation screws.
Step 6Install the cables, and fasten them to the bracket with the velcro straps provided.
Installing the NPE-G1 or NPE-G2
Installing the Rear Cable-Management Brackets on a Front-Mounted Router (Optional)
Use the instructions in this section to attach the cable-management brackets to a front-mounted
Cisco 7200 VXR router.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-31
Installing the NPE-G1 or NPE-G2
Figure 7-19Installing the Rear Cable-Management Brackets with an NPE-G1 or NPE-G2—Router
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Front-Mounted
H6423
1
GIGABIT ETHERNET 0/1
L
IN
K
E
N
R
J
4
5
R
GIGABIT ETHERNET 0/1
L
IN
K
E
X
N
G
B
IC
T
X
R
J
4
5
GIGABIT ETHERNET 0/1
R
X
G
B
IC
T
X
R
J
4
5
N
ET
W
O
R
K
PR
O
C
E
S
S
IN
G
E
N
G
IN
E
- G
1
S
L
O
L
IN
K
C
P
U
R
E
S
E
E
N
T
R
X
G
B
IC
T
X
T
A
C
T
IV
E
P
O
W
E
R
C
O
M
P
A
C
T
F
L
A
S
H
C
O
N
S
O
L
E
O
K
A
U
X
1
1Screws
Step 1If the back of the router protrudes from the rack, place the cable-management brackets against the router
as shown in Figure 7-19.
Step 2Insert two screws into each bracket, and tighten them to the router.
Step 3Insert the GBIC, SFP module, or RJ-45 cables into the interface ports on the NPE-G1 or NPE-G2.
Step 4Place the cables through the cable-management brackets.
66749
You have finished installing the cable-management brackets. Go to the “Reconnecting Input Power and
Powering Up the Router” section on page 7-35.
Installing the Rear Cable-Management Brackets on a Rear-Mounted Router (Optional)
Use the instructions in this section to attach the cable-management brackets if you have a rear-mounted
Cisco 7200 VXR router.
Network Processing Engine and Network Services Engine Installation and Configuration
7-32
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-20Installing the Rear Cable-Management Brackets with the NPE-G1 or NPE-G2—Router
Rear-Mounted
Installing the NPE-G1 or NPE-G2
EN
1
G
IGABIT ETH
ERNE
T 0/1
G
IGABIT ETH
ER
NET
0/1
GIGAB
IT E
THER
NET 0/1
L
IN
K
E
N
R
J
4
5
R
X
L
IN
K
E
N
G
B
IC
T
X
R
J
4
5
R
X
L
G
B
IC
T
X
R
J
4
5
IN
E
N
K
R
X
G
B
IC
NETWORK PROCESSING ENGINE - G1
C
P
U
R
E
S
E
T
T
X
1
S
L
O
T
A
C
T
IV
E
P
O
W
E
C
O
R
M
P
A
C
T
F
L
A
S
H
C
ON
S
O
L
E
O
N
AU
X
1Screws
Step 1Align the cable-management brackets with the rack-mount brackets as shown in Figure 7-20.
Step 2Insert and tighten two screws for each bracket. The screws come with the cable-management brackets.
Figure 7-21Attaching Console and Auxiliary Port Cables
1
66750
NETWORK PROCESSING ENGINE - G1
CPU
RESET
COMPACT FLASH
SLOT
ACTIVE
POWER
ON
CONSOLE
2
AUX
4
5
1Console port4Cable to console terminal or DTE
2Auxiliary port5Cable to modem or DCE
3RJ-45 connectors
Step 3Insert the console and auxiliary RJ-45 cables into the interface ports on the NPE-G1 or NPE-G2.
Step 4Place the cables through the cable-management brackets.
OL-4448-12
3
66777
Network Processing Engine and Network Services Engine Installation and Configuration
7-33
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
You have finished installing the cable-management brackets. Go to the “Reconnecting Input Power and
Powering Up the Router” section on page 7-35.
Installing the Default Cable-Management Bracket on a Cisco uBR7246VXR Router (Optional)
If you are not using the NPE-G1 cable-management bracket, you can alternatively use two
cable-management bracket configurations for the Cisco uBR7246VXR router. In the first configuration,
for a 4-post rack, the rack-mount brackets are installed at the rear of the chassis and the
cable-management bracket is installed at the right front of the chassis. (See Figure 7-22.) You must
install both sets of brackets before you install the chassis in the rack.
In the second configuration, for a telco-type rack, the rack-mount brackets are installed at the middle of
the chassis and the cable-management bracket is installed at the right front of the chassis. (See
Figure 7-23.) You must install both sets of brackets before you install the chassis in the rack.
NoteThe cable-management bracket must be installed on the right side of the chassis when viewed from the
front.
Figure 7-22Installing the Chassis in a 4-Post Rack with an Installed Cable-Management Bracket
93812
12
1Rack-mount bracket2Cable-management bracket
Network Processing Engine and Network Services Engine Installation and Configuration
7-34
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Figure 7-23Installing the Chassis in a Telco-Type Rack with an Installed Cable-Management
Bracket
Installing the NPE-G1 or NPE-G2
12
93812
1Rack-mount bracket2Cable-management bracket
Reconnecting Input Power and Powering Up the Router
The following procedures explain how to reconnect input power to a Cisco 7200 VXR router, Cisco
UBR7225VXR, or Cisco uBR7246VXR router, power up the router, and verify a successful system boot.
Warning
Reconnecting AC-Input Power to the Cisco 7200 VXR Router
Step 1At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2Slide the cable-retention clip up away from the AC receptacle, and plug in the power cable.
Step 3Secure the cable in the power supply AC receptacle by sliding the cable-retention clip down until it snaps
Read the installation instructions before you connect the system to its power source.
To reconnect AC-input power to a Cisco 7200 VXR router, complete the following steps:
around the connector. The cable-retention clip provides strain relief for the AC power cable.
Statement 10
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-35
Installing the NPE-G1 or NPE-G2
Figure 7-24Connecting AC-Input Power to a Cisco 7200 VXR Router
1
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
84398
2
3
54
1Power switch4Cable-retention clip
2AC power cable5Hole for nylon cable tie
3POWER OK LED
Step 4
Plug the AC power supply cable into the AC power source.
NoteFor Cisco 7200 VXR routers, each AC-input power supply operating at 120 VAC requires a
minimum of 5A service.
We recommend powering the Cisco 7200 VXR routers from a 120 VAC, 15A receptacle U.S.
(240 VAC, 10A international) at the power source.
Step 5Repeat Step 1 through Step 4 if a second power supply is installed.
This completes the steps for reconnecting AC-input power to a Cisco 7200 VXR router. Proceed to the
“Powering Up the Router” section on page 7-45.
Network Processing Engine and Network Services Engine Installation and Configuration
7-36
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Reconnecting AC-Input Power to the Cisco uBR7246VXR Router
Figure 7-25Connecting AC-Input Power to a Cisco uBR7246VXR Router
1
Installing the NPE-G1 or NPE-G2
5
6
2
3
4
66422
1Cable-retention clip4AC power cable
2Power receptacle5Power switch
3Captive installation screw6Handle
To reconnect AC-input power to a Cisco uBR7246VXR router, complete the following steps:
Step 1At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2Slide the cable-retention clip to the left away from the AC receptacle, and plug in the power cable.
Step 3Secure the cable in the power supply AC receptacle by sliding the cable-retention clip to the right until
it snaps around the connector. The cable-retention clip provides strain relief for the AC power cable.
Step 4Plug the AC power supply cable into the AC power source.
NoteFor the Cisco uBR7200 series routers, each AC-input power supply operating at 120 VAC
requires a minimum of 7A service.
We recommend powering the Cisco uBR7200 series routers from a 120 VAC, 15A receptacle
U.S. (240 VAC, 10A international) at the power source.
Step 5Repeat Step 1 through Step 4 if a second power supply is installed.
This completes the steps for reconnecting AC-input power to a Cisco uBR7246VXR router. Proceed to
the “Powering Up the Router” section on page 7-45.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-37
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Reconnecting AC-Input Power to the Cisco uBR7225VXR Router
To connect AC-input power to the Cisco uBR7225VXR router, complete the following steps:
Step 1At the rear of the router, ensure that the power switch on the power supply is in the off position.
Figure 7-26Connecting AC-Input Power to a Cisco UBR7225VXR Router
1
uBR7225-VXR
4
uBR7225-VXR
23
Power switch
1
Handle
2
Step 2
NoteFor additional AC power cable strain relief, secure the cable to the power supply handle by inserting a
Plug the power cable into the AC connector of the power supply.
nylon cable tie through the hole in the handle and around the cable.
Step 3Plug the AC power supply cable into the AC power source.
Step 4Repeat Step 1 through Step 3 for the second power supply, if required.
Step 5Turn on the power switch on the router.
This completes the steps for reconnecting AC-Input power to a Cisco UBR7225VXR router. Proceed to
the “Powering Up the Router” section on page 7-45
AC-input receptacle
4
Captive installation screw
5
270538
Reconnecting DC-Input Power to the Cisco 7200 VXR Router
To reconnect DC-input power to a Cisco 7200 VXR router, complete the following steps.
NoteThe color coding of the DC-input power supply leads depends on the color coding of the DC power
source at your site. Typically, green or green and yellow are used for ground. Make certain that the lead
color coding you choose for the DC-input power supply matches the lead color coding used at the DC
power source.
Network Processing Engine and Network Services Engine Installation and Configuration
7-38
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Installing the NPE-G1 or NPE-G2
Warning
Before completing any of the following steps, and to prevent short-circuit or shock hazards, ensure
that power is removed from the DC circuit. To ensure that all power is OFF, locate the circuit breaker
on the panel board that services the DC circuit, switch the circuit breaker to the OFF position, and
Warning
tape the switch handle of the circuit breaker in the OFF position.
When installing the unit, the ground connection must always be made first and disconnected last.
Statement 322
Statement 42
Step 1At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2Ensure that no current is running through the –V and +V leads. To ensure that all power is off, locate the
circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the off
position, and tape the switch handle of the circuit breaker in the off position.
Figure 7-27Connecting DC-Input Power to a Cisco 7200 VXR Router
1
Step 3
66432
2
3
4
1Power switch3Cable tie
2Ground lead service loop4DC power leads
If necessary, use a wire stripper to strip approximately 0.55 inch (14 mm) from the –V, +V, and ground
leads. (See Figure 7-28.)
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-39
Installing the NPE-G1 or NPE-G2
Figure 7-28Stripping the DC-Input Lines
10.55 in. (14 mm)
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
1
57019
Step 4
For the Cisco 7200 VXR routers, insert the stripped end of the ground lead all the way into the ground
lead receptacle on the DC-input power supply and tighten the receptacle screw using a 3/16-inch
flat-blade screwdriver.
Step 5Insert the stripped end of the +V lead all the way into the +V lead receptacle and tighten the receptacle
screw using the same 3/16-inch flat-blade screwdriver. Repeat this step for the –V lead.
NoteMake sure that the entire stripped end of each lead is inserted all the way into its receptacle. If any
exposed wire at the stripped end of a lead is visible after inserting the lead into its receptacle, remove
the lead from the receptacle, use the wire stripper to cut the stripped end of the lead, and repeat through
Step 5.
Step 6After tightening the receptacle screws for the ground, +V, and –V DC-input leads, secure the leads to the
power supply faceplate.
Use the cable tie you saved earlier in this procedure to secure the three leads.
NoteWhen securing the ground, +V, and –V DC-input leads to the power supply faceplate, leave a
small service loop in the ground lead to ensure that it is the last lead to disconnect from the power
supply if a great deal of strain is placed on all three leads. (See Figure 7-27.)
Step 7Restore current to the –V and +V leads.
NoteFor the Cisco 7200 VXR routers:
– Each DC-input power supply operating at 24 VDC requires a minimum of 19A service.
– Each DC-input power supply operating at 48 VDC requires a minimum of 13A service.
– Each DC-input power supply operating at 60 VDC requires a minimum of 8A service.
This product relies on the building’s installation for short-circuit (overcurrent) protection.
Ensure that a listed and certified fuse or circuit breaker, 35A minimum 60 VDC, is used on all
current-carrying conductors. Site wiring and circuit breakers need to be sized to accommodate
the maximum values for safety reasons.
Step 8Repeat Step 1 through Step 7 if a second power supply is installed.
Network Processing Engine and Network Services Engine Installation and Configuration
7-40
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
This completes the steps for reconnecting DC-input power to a Cisco 7200 VXR router. Proceed to the
“Powering Up the Router” section on page 7-45.
Reconnecting DC-Input Power to a Cisco uBR7246VXR Router
To reconnect DC-input power to a Cisco uBR7246VXR router, complete the following steps.
NoteThe color coding of the DC-input power supply leads depends on the color coding of the DC power
source at your site. Typically, green or green and yellow are used for ground. Make certain that the lead
color coding you choose for the DC-input power supply matches the lead color coding used at the DC
power source.
Installing the NPE-G1 or NPE-G2
Warning
Warning
Step 1At the rear of the router, check that the power switch on the power supply is in the off (O) position.
Step 2Ensure that no current is running through the –V and +V leads. To ensure that all power is off, locate the
Before completing any of the following procedures, and to prevent short-circuit or shock hazards,
ensure that power is removed from the DC circuit. To ensure that all power is OFF, locate the circuit
breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF position,
and tape the switch handle of the circuit breaker in the OFF position.
When installing the unit, the ground connection must always be made first and disconnected last.
Statement 42
Statement 322
circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the off
position, and tape the switch handle of the circuit breaker in the off position.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-41
Installing the NPE-G1 or NPE-G2
Figure 7-29Connecting DC-Input Power to a Cisco uBR7246VXR Router
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
1
2
3
4
7
8
5
6
1Power switch6–V lead
2Power receptacle7M4 studs
3Captive installation screw8+V lead
4M5 grounding receptacles9Handle
5M5 grounding lug
9
66407
Step 3SIf necessary, use a wire stripper to strip approximately 0.55 inch (14 mm) from the –V, +V, and ground
leads.
NoteThe ground lead for the Cisco uBR7200 series DC-input power supply consists of a two-hole grounding
lug that connects to an M5 grounding receptacle; you do not need to strip this ground lead.
Figure 7-30Stripping the DC-Input Lines
1
57019
10.55 in. (14 mm)
Network Processing Engine and Network Services Engine Installation and Configuration
7-42
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 4Connect the two-hole grounding lug on the grounding lead to the M5 grounding receptacles with the M5
nuts. Tighten the nuts using an 8-mm wrench or nut driver (or adjustable wrench). (See Figure 7-31.)
Step 5Insert the stripped end of the +V lead all the way into the +V lead receptacle and tighten the receptacle
screw using the 3/16-inch flat-blade screwdriver. Repeat this step for the –V lead.
NoteMake sure that the entire stripped end of each lead is inserted all the way into its receptacle. If any
exposed wire at the stripped end of a lead is visible after inserting the lead into its receptacle, remove
the lead from the receptacle, use the wire stripper to cut the stripped end of the lead, and repeat through
Step 5.
Step 6After tightening the receptacle screw or nuts for the ground, +V, and –V DC-input leads, secure the leads
to the power supply faceplate.
Step 7Run the +V and –V leads between the two strain-relief studs on the power supply faceplate.
NoteA service loop is not required in the lead attached to the grounding lug because this lead is
separate from the +V and –V leads and is secured by two M5 nuts to the M5 receptacles.
Installing the NPE-G1 or NPE-G2
Step 8Replace the strain-relief cover over the +V and –V leads and secure the cover to the strain-relief studs
with the two M4 nuts using the 7-mm wrench or nut driver (or adjustable wrench).
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-43
Installing the NPE-G1 or NPE-G2
Figure 7-31Replacing the Strain-Relief Cover on a Cisco uBR7246VXR Series DC-Input Power
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Supply
1
2
3
4
5
6
7
1Power switch6–V lead
2Power receptacle7+V lead
3Captive installation screw8Strain-relief cover
4M5 grounding receptacles9M4 nuts
5M5 grounding lug
8
66409
9
Step 9
Restore current to the –V and +V leads.
NoteFor the Cisco uBR7200 series routers, each DC-input power supply rating is 14A, 700 volt
ampere (VA).
This product relies on the building’s installation for short-circuit (overcurrent) protection.
Ensure that a listed and certified fuse or circuit breaker, 35A minimum 60 VDC, is used on all
current-carrying conductors. Site wiring and circuit breakers need to be sized to accommodate
the maximum values for safety reasons.
Step 10Repeat Step 1 through Step 9 if a second power supply is installed.
This completes the steps for reconnecting DC-input power to a Cisco uBR7246VXR router. Proceed to
the following section, “Powering Up the Router.”
Network Processing Engine and Network Services Engine Installation and Configuration
7-44
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Powering Up the Router
To power up a Cisco 7200 VXR router, Cisco uBR7246VXR router, or Cisco uBR7225VXR router that
has an installed power supply, complete the following steps:
Step 1Check for the following:
–
Each port adapter is inserted in its slot, and its respective port adapter lever is in the locked
position.
–
The network processing engine and the I/O controller or I/O controller blank panel are inserted
in their respective slots, and the captive installation screws are tightened.
–
All network interface cables are connected to the port adapters or I/O controller or NPE-G1 or
NPE-G2 interfaces.
–
Each cable interface line card is inserted in its slot, and its respective captive installation screws
are tightened (Cisco uBR7246VXR router only).
–
(Optional) A CompactFlash Disk is installed in the CompactFlash Disk slot in the NPE-G1 or
NPE-G2. If you also have an I/O controller installed, you can optionally install a PC Card or
Flash Disk in one of the I/O controller’s PC Card slots.
Installing the NPE-G1 or NPE-G2
NoteA Flash Disk can be installed in either slot 0 or slot 1 of the I/O controller. A
CompactFlash Disk can be installed only in the CompactFlash Disk slot in the NPE-G1
or NPE-G2.
–
(Optional) A USB Flash memory module or USB eToken Pro key is inserted into a USB port on
the NPE-G2.
–
Each AC-input power cable is connected and secured with the cable-retention clip, except for
uBR7224VXR routers(AC-input power supplies only).
–
For a Cisco 7200 VXR router, each DC lead is connected and secured to the power supply
faceplate with a cable tie.
–
For a Cisco uBR7246VXR router, each DC lead is connected with M4 nuts for the grounding
receptacle and the strain-relief cover over the +V and –V leads (DC-input power supplies only).
–
Each DC lead is connected and secured to the power source (DC-input power supplies only).
–
Ensure that the tape (that you applied earlier) is removed from the circuit breaker switch handle,
and power is restored by moving the circuit breaker handle to the on (|) position (DC-input
power supplies only).
–
The console terminal is turned on.
CautionWhen the power switch on a Cisco uBR7200 series power supply is turned to the off (O) position, the
power supply enters a reset cycle for 90 seconds. Wait at least 90 seconds before turning the power
switch back to the on (|) position. If you do not wait the full 90 seconds, the power supply does not
restart.
Step 2At the rear of the router, place the power switch on the power supply in the on (|) position. Repeat this
step if a second power supply is installed in the router. The green OK LED on the power supply turns on.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-45
Enabling the Second Processor on the NPE-G1
NoteWhen powering on the router, wait a minimum of 30 seconds before powering it off again.
Step 3Listen for the fans; you should immediately hear them operating.
Step 4During the boot process, observe the system LEDs. The LEDs on most of the port adapters go on and off
in an irregular sequence. Some may go on, go off, and go on again for a short time. On the NPE-G1 or
NPE-G2 and the I/O controller, the POWER OK LED goes on immediately.
Step 5Observe the initialization process. When the system boot is complete (a few seconds), the NPE-G1 or
NPE-G2 begins to initialize the port adapters and the I/O controller. During this initialization, the LEDs
on each port adapter behave differently (most flash on and off). The enabled LED on each port adapter
and Cisco uBR7200 series cable interface line card goes on when initialization is completed, and the
console screen displays a script and system banner similar to the following:
Cisco Internetwork Operating System Software
IOS (tm) 7200 Software (C7200-J-M), 11.3(2)T
Copyright (c) 1986-1998 by cisco Systems, Inc.
Compiled Sun 22-Feb-98 06:00 by Biff
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
This completes the procedures for connecting input power and powering up the router. This also
completes the procedure for installing the NPE-G1 or NPE-G2 in a Cisco 7200 VXR router,
Cisco uBR7246VXR router, or Cisco uBR7225VXR.
Enabling the Second Processor on the NPE-G1
The Cisco 7200VXR NPE-G1 includes a dual-CPU-core BCM1250 processor. All Cisco IOS images for
the Cisco 7200VXR NPE-G1 use CPU-core 0. CPU-core 1 allows acceleration of specific feature sets via
separately purchased special software. As of Cisco IOS Release 12.3(14)YM, multi-processor forwarding
(MPF) accelerates the following broadband features: L2TP Access Concentrator (LAC), L2TP Network
Server (LNS), and PPP Terminated Aggregation (PTA). Port adapters are not supported in the
multi-processor forwarding (MPF) path on processor 1.
Only the following port adapters are supported in the punt path (Processor 0 processing Cisco IOS) on
Cisco IOS Release 12.3(14)YM and later releases of Cisco IOS Release 12.3YM:
• PA-A3-OC3 (SMI/SML/MM)
• PA- A3 -T 3
• PA- A3 -E 3
• PA-A6-OC3 (SMI/SML/MM)
• PA- A6 -T 3
• PA- A6 -E 3
• PA-FE-TX
• PA- 2F E- TX
• PA- 2F E- FX
You may have purchased the enabling software when you purchased a new chassis or you may have
purchased the software as an upgrade.
If you are purchasing the software as an upgrade, you must:
Network Processing Engine and Network Services Engine Installation and Configuration
7-46
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
• Upgrade the ROMmon. (The minimum ROMmon version is 12.3-4r.T3.)
• Install the enabling software.
Instructions for upgrading ROMmon are in the “Using the upgrade rom-monitor file Command” section
on page 7-64.
The minimum software release for the Broadband L2TP Access Concentrator (LAC), L2TP Network
Server (LNS), and PPP Terminated Aggregation (PTA) is Cisco IOS Release 12.3(14)YM.
Also see the MPF for Broadband LAC, LNS, and PTA document for minimum memory requirements and
configuration information.
NoteBefore enabling the second processor, you must have IP routing turned on.
Processor 1 is enabled by default after you install the enabling software. To have all packets forwarded
by processor 0, use the no ip mpf command. To enable processor 1, use the ip mpf command.
Save the running configuration to NVRAM. See the “Copying the Saved Configuration to NVRAM”
section on page 7-52. If you do not save the configuration settings that you created in the router using
configuration mode and the setup facility, your configuration will be lost the next time you reload the
router.
Enabling the Second Processor on the NPE-G1
Error Messages
The following error messages are displayed if a feature is configured that is not supported in the MPF
path:
Router# %MPF-4-IGNOREDFEATURES: Interface Gi0/3: Input "PBR" configurations are not MPF
supported and are IGNORED. %SYS-5-CONFIG_I: Configured from console by console
Router# (config-if)# %MPF-4-IGNOREDFEATURES: Interface Gi0/3: Input "PBR" configurations
are not MPF supported and are IGNORED.
%MPF-4-IGNOREDFEATURES: Interface Gi0/3: Output "NetFlow" configurations
are not MPF supported and are IGNORED.
Using show Commands Associated with the mpf Command
There are a variety of show commands associated with the mpf command. They are listed below along
with sample output. Use these commands to verify the mpf installation.
• Using the show interface stats Command, page 7-48
• Using the show ip interface Command, page 7-48
• Using the show mpf cpu Command, page 7-49
• Using the show mpf cpu history Command, page 7-49
• Using the show mpf interface Command, page 7-50
• Using the show mpf ip exact-route Command, page 7-51
• Using the show mpf punt Command, page 7-51
• Using the show version Command, page 7-51
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-47
Enabling the Second Processor on the NPE-G1
Using the show interface stats Command
Use the show interface stats command for information about the interface.
Router#show interface stats
GigabitEthernet0/1
Switching path Pkts In Chars In Pkts Out Chars Out
Processor 33090 6424353 86353 8645650
Route cache 2 116 0 0
Multi-Processor Fwding 1004 158632 5004 790632
Total 34096 6583101 91357 9436282
Using the show ip interface Command
Use the show ip interface command to get information about the specific interface port.
Router# show ip interface g0/3
GigabitEthernet0/3 is up, line protocol is up
Internet address is 155.1.1.1/16
Broadcast address is 255.255.255.255
Address determined by setup command
MTU is 1500 bytes
Helper address is not set
Directed broadcast forwarding is disabled
Outgoing access list is not set
Inbound access list is not set
Proxy ARP is enabled
Local Proxy ARP is disabled
Security level is default
Split horizon is enabled
ICMP redirects are always sent
ICMP unreachables are always sent
ICMP mask replies are never sent
IP fast switching is enabled
IP fast switching on the same interface is disabled
IP Flow switching is disabled
IP CEF switching is enabled
IP Feature Fast switching turbo vector
IP VPN Flow CEF switching turbo vector
IP multicast fast switching is enabled
IP multicast distributed fast switching is disabled
IP route-cache flags are Fast, CEF
Router Discovery is disabled
IP output packet accounting is disabled
IP access violation accounting is disabled
TCP/IP header compression is disabled
RTP/IP header compression is disabled
Policy routing is enabled, using route map PBR
Network address translation is disabled
BGP Policy Mapping is disabled
IP Multi-Processor Forwarding is enabled
IP Input features, "PBR",
are not supported by MPF and are IGNORED
IP Output features, "NetFlow",
are not supported by MPF and are IGNORED
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Network Processing Engine and Network Services Engine Installation and Configuration
7-48
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Using the show mpf cpu Command
Use the show mpf cpu command to display the average second CPU utilization in the last five seconds, one
minute, and five minutes.
hostname: show mpf cpu
CPU utilization for five seconds: 33%; one minute: 25%; five minutes: 30%
Using the show mpf cpu history Command
Use the show mpf cpu history command to graph output of the second CPU utilization for the last 60
seconds, 60 minutes, and 72 hours.
Router# show mpf cpu history
slns 12:12:40 AM Saturday Nov 18 2000 UTC
3333333333333333333333333333333333333333333333333333333333
3333333333333333333333333333333333333333333333333333333333
100
90
80
70
60
50
40
30 ***************************
20 ***************************
10 ***************************
Network Processing Engine and Network Services Engine Installation and Configuration
7-49
Enabling the Second Processor on the NPE-G1
CPU% per hour (last 72 hours)
* = maximum CPU% # = average CPU%
Using the show mpf interface Command
Using the show mpf interface command without arguments shows the interface information for all
Gigabit Ethernet interfaces and subinterfaces. This command is supported only for physical interfaces.
There is no support for the virtual access interface.
Router# show mpf interface
Name Index State Counter Count
Gi0/1 0 up RX packets 1004
Gi0/1 1 up
Gi0/1.100 100 up RX packets 1004
Gi0/1.101 101 up
Gi0/1.102 102 up
Gi0/1.105 105 up
Gi0/1.106 106up
Gi0/1.107 107 up
Gi0/1.200 200 up
Gi0/1.201 201 upRX punts 29
Gi0/1.202 202up
Gi0/1.206 206 up
Gi0/1.2002 602 up RX punts 26114
Gi0/1.2004 604up
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Using the show mpf interface GigabitEthernet 0/1 Command
The following example displays the interface information for GigabitEthernet 1/0, subinterface number
100. However, all Gigabit Ethernet interface and subinterface information is displayed because MPF
does not recognize the subinterface number, unless it is a VLAN number.
Router# show mpf interface GigabitEthernet 0/1.100
Name Index State Counter Count
Gi0/1 0 up RX packets 1004
RX bytes 158632
TX packets 5004
TX bytes 790632
RX punts 32996
TX punts 86062
Gi0/1 1 up
Gi0/1.100 100 up RX packets 1004
RX bytes 158632
TX packets 5004
TX bytes 790632
RX punts 25
Gi0/1.101 101 up
Gi0/1.102 102 up
Gi0/1.105 105 up
Gi0/1.106 106 up
Gi0/1.107 107 up
Gi0/1.200 200 up
Network Processing Engine and Network Services Engine Installation and Configuration
7-50
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Gi0/1.201 201 up RX punts 29
Gi0/1.202 202 up
Gi0/1.206 206 up
Gi0/1.2002 602 up RX punts 26142
Gi0/1.2004 604 up
Using the show mpf interface GigabitEthernet 0/1 100 Command
The following example displays the interface information for VLAN number 100 on the GigabitEthernet
0/1 interface, including up state, receiving packet count, receiving bytes count, transmitting packet
count, transmitting bytes count, and receiving punts count.
Router# show mpf interface GigabitEthernet 0/1 100
Name Index StateCounter Packets Bytes
Gi0/1.100 100 up RX total 963 151050
RX punt 5 475
TX total 956 150449
IP Multi-Processor Forwarding is enabled
Enabling the Second Processor on the NPE-G1
Using the show mpf ip exact-route Command
Use the show mpf ip exact-route command to show which routing decision is made for a given IP
address pair.
hostname: show mpf ip exact-route[vrf vrf_name] src-ip-addr dst-ip-addr
1.1.1.1 -> 192.168.255.255 :Gi2/0/0 (next hop 10.1.255.10)
Using the show mpf punt Command
Use the show mpf punt command to display the per-box punt reason and punt packet counts.
Router# show mpf punt
Type Message Count
l2tp unknown session errors 7
l2tp L2TP control 6
ipv4/verify adjacency punt 1
ethernet unknown ethernet type 542
ppp punts due to unknown protocol 333
arp ARP request 6
Using the show version Command
Following is output from the show version command with the second processor enabled. Note that the
show version output provides “SB-1 CPU” when processor 1 is enabled.
Router# show version
Cisco IOS Software, 7200 Software (C7200-I12S-M), Version 12.3(BSNOP4_NIGHTLY.050202)
UBUILDIT Image, CISCO DEVELOPMENT TEST VERSION
Copyright (c) 1986-2005 by Cisco Systems, Inc.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-51
Copying the Saved Configuration to NVRAM
Compiled Wed 02-Feb-05 04:57 by
ROM: System Bootstrap, Version 12.3(4r)T3, RELEASE SOFTWARE (fc1)
BOOTLDR: Cisco IOS Software, 7200 Software (C7200-KBOOT-M),
12.3(20040712:050512) [REL-v123_7_xi_throttle.ios-weekly 115]
Lac1 uptime is 16 hours, 22 minutes
System returned to ROM by reload at 18:12:49 UTC Mon Feb 7 2005
System image file is
"tftp://223.255.254.254/auto/tftpboot-users/biff/c7200-i12s-mz.2005-02-02.BSNOP4_NIGH"
Last reload reason: Reload command
Cisco 7206VXR (NPE-G1) processor (revision 0xFF) with 983040K/65536K bytes of memory.
Processor board ID 31650243
SB-1 CPU at 700MHz, Implementation 1025, Rev 0.2, 512KB L2 Cache
6 slot VXR midplane, Version 2.7
Last reset from power-on
CPU 1 Multi-Processor Forwarding, Tue Feb 1 00:48:42 PST 2005 [rtang 100]
PCI bus mb1 (Slots 1, 3 and 5) has a capacity of 600 bandwidth points.
Current configuration on bus mb1 has a total of 400 bandwidth points.
This configuration is within the PCI bus capacity and is supported.
PCI bus mb2 (Slots 2, 4 and 6) has a capacity of 600 bandwidth points.
Current configuration on bus mb2 has a total of 700 bandwidth points.
The set of PA-2FE, PA-POS-2OC3, and I/O-2FE qualify for "half
bandwidth points" consideration, when full bandwidth point counting
results in oversubscription, under the condition that only one of the
two ports is used. With this adjustment, current configuration on bus
mb2 has a total of 700 bandwidth points.
This configuration has oversubscripted the PCI bus and is not a
supported configuration.
Please refer to the following document "Cisco 7200 Series Port
Adaptor Hardware Configuration Guidelines" on CCO <www.cisco.com>,
for c7200 bandwidth points oversubscription/usage guidelines.
WARNING: PCI bus mb2 Exceeds 600 bandwidth points
1 Ethernet interface
2 FastEthernet interfaces
5 Gigabit Ethernet interfaces
1 ATM interface
509K bytes of NVRAM.
62976K bytes of ATA PCMCIA card at slot 2 (Sector size 512 bytes).
16384K bytes of Flash internal SIMM (Sector size 256K).
Configuration register is 0x2
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Copying the Saved Configuration to NVRAM
After installing and cabling the NPE-G1 or NPE-G2 and powering on the router, copy the configuration
file to the NVRAM on the NPE-G1 or NPE-G2, using one of the following procedures:
• If you have kept the previous I/O controller installed in the router, use the procedure given in the
“Copying the Saved Configuration File from a Flash Disk or PC Card” section on page 7-53 to copy
the saved configuration to the NVRAM on the NPE-G1 or NPE-G2.
• If you have removed the previously installed I/O controller from the router, and you were able to
copy the file to a CompactFlash Disk, use the procedure given in the “Copying the Saved
Configuration File from the CompactFlash Disk” section on page 7-53 to copy the saved
configuration file to the NVRAM on the NPE-G1 or NPE-G2.
• If you have removed the previously installed I/O controller from the router, and you have not been
able to copy the file to a CompactFlash Disk, use the procedure given in the “Downloading the Saved
Configuration from the TFTP Server” section on page 7-54 to copy the saved configuration file to
the NVRAM on the NPE-G1 or NPE-G2.
Network Processing Engine and Network Services Engine Installation and Configuration
7-52
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Copying the Saved Configuration to NVRAM
Copying the Saved Configuration File from a Flash Disk or PC Card
To copy the saved configuration file from the Flash Disk or PC Card, follow these steps:
Step 1Make sure you are at the privileged level of the EXEC command interpreter (check the system prompt
for a pound sign [#]). If the system prompt does not have a pound sign (#), enter enable, and then your
password.
Step 2Insert the Flash Disk or PC Card containing the saved configuration file into the first PC Card slot in
the I/O controller.
Step 3Enter the copy disk0:filename running or copy slot0:filename running command.
Router# copy disk0:filenamerunning
or
Router# copy slot0:filenamerunning
Step 4Enter the write command:
Router# write
You have finished copying and writing the saved configuration file to NVRAM.
Copying the Saved Configuration File from the CompactFlash Disk
If you have been able to copy the configuration file to the CompactFlash Disk, use the following steps
to copy the configuration to the NVRAM on the NPE-G1 or NPE-G2:
Step 1Make sure you are at the privileged level of the EXEC command interpreter (check the system prompt
for a pound sign [#]). If the system prompt does not have a pound sign (#), enter enable, and then your
password.
Step 2Insert the CompactFlash Disk containing the saved configuration file into the CompactFlash Disk slot
on the NPE-G1 or NPE-G2.
Step 3Enter the copy disk2:filename command.
Router# copy disk2:filename running
Step 4Enter the write command:
Router#: write
You have finished copying and writing the saved configuration file to NVRAM.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-53
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Copying the Saved Configuration to NVRAM
Downloading the Saved Configuration from the TFTP Server
After you install the NPE-G1 or NPE-G2 in the router and verify a successful router boot, you must
retrieve the router configuration from the TFTP server and copy it to NVRAM. Use the copy tftp
running-config command to copy the saved configuration from the TFTP file server. The system
prompts you for a hostname and address, the name of the configuration file stored on the host, and
confirmation to reboot using the remote file.
After the NPE-G1 or NPE-G2 is installed, save the router configuration file to NVRAM (the default is
the NPE-G1 or NPE-G2 NVRAM) using the copy system:running-config nvram:startup-config
command as follows:
You will want to configure the NPE-G1or NPE-G2 interfaces after retrieving the router configuration
and copying it to NVRAM.
Before retrieving the router configuration file from the TFTP server, check the following:
• A console terminal is connected to the console port on the NPE-G1 or NPE-G2, or a Telnet session
is established to the router.
• The router is connected to a network supporting a file server (remote host).
• The remote host supports the TFTP application.
• You have the name or address of the remote host.
Before configuring the new interfaces on the NPE-G1 or NPE-G2, be prepared with the following
information:
• Protocols and encapsulations you plan to use on the new interface
• Protocol-specific information, such as IP addresses if you will configure the interface for IP routing
For complete descriptions of interface commands and the configuration options available for Cisco 7200
VXR-related interfaces, refer to the documentation resources listed in the “Related Documentation”
section on page iii.
To retrieve the saved router configuration from the remote host, complete the following steps:
Step 1Make sure you are at the privileged level of the EXEC command interpreter (check the system prompt
for a pound sign [#]). If the system prompt does not have a pound sign (#), enter enable, and then your
password.
NoteUntil you retrieve the saved configuration, the router runs from the default configuration in
NVRAM. Therefore, any passwords that were previously configured on the system are not valid
until you retrieve the configuration.
Step 2Use the ping command to check the connection between the router and the remote host (the remote file
server to which you copied the configuration file).
Step 3At the system prompt, enter the copy tftp running-config command and press Return to enter
configuration mode. Specify that you will configure the system from a network device (instead of from
the console terminal, which is the default).
Router# copy tftp running-config
Network Processing Engine and Network Services Engine Installation and Configuration
7-54
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 4The system prompts you to select a host or network configuration file. The default is host; press Return
to accept the default.
Host or network configuration file [host]?
Step 5The system prompts you for the IP address of the host. Enter the IP address or name of the remote host.
IP address of remote host [255.255.255.255]? 10.1.1.1
Step 6The system prompts you for the name of the configuration file. When the system copies the file to the
server, the default is to use the name of the router with the suffix -confg (router-co nfg in the following
example). If you specified a different filename when you copied the configuration, enter that filename;
otherwise, press Return
Name of configuration file [router-confg]?
Step 7Before the system reboots with the new configuration, it displays the instructions you entered for
to accept the default.
confirmation. If the instructions are not correct, enter n (no), and then press Return to cancel the
process. To accept the instructions, press Return, or y and then Return.
Configure using router-confg from 10.1.1.1? [confirm]
Booting router-confg from 10.1.1.1: ! ! [OK - 874/16000 bytes]
While the router retrieves and boots from the configuration on the remote host, the console display
indicates whether or not the operation was successful. A series of exclamation points (!!!!) and [OK] (as
shown in the preceding example) indicates that the operation was successful. A series of periods (. . .)
and [timed out] or [failed] indicates a failure (which would probably be due to a network fault or an
incorrect server name, address, or filename). The following is an example of a failed attempt to boot from
a remote server:
Booting Router-confg ..... [timed out]
Copying the Saved Configuration to NVRAM
• If the display indicates that the process was successful, proceed to the next step.
• If the display indicates that the process failed, verify the name or address of the remote server and
the filename, and repeat the preceding steps. If you are unable to retrieve the configuration, contact
your network administrator or see the “Obtaining Documentation and Submitting a Service
Request” section on page iv for instructions on contacting Cisco technical assistance.
Step 8Enter the show running-config command to display the currently running configuration on the
terminal. Review the display and ensure that the configuration information is complete and correct. If it
is not, verify the filename and repeat the preceding steps to retrieve the correct file, or use the
configure command to add or modify the existing configuration. (Refer to the appropriate software
documentation for descriptions of the configuration options available for the system and individual
interfaces and specific configuration instructions.)
Step 9When you have verified that the currently running configuration is correct, enter the
copy running-config startup-config command to save the retrieved configuration in NVRAM.
Otherwise, the new configuration will be lost when you restart the system.
This completes the procedure for downloading the saved router configuration from the remote host.
Proceed to the “Configuring the Native Gigabit Ethernet Interfaces” section on page 7-56.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-55
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Auxiliary and Console Port Information
Auxiliary and Console Port Information
If the NPE-G1 or NPE-G2 and an I/O controller are both installed in the same system, the console and
auxiliary ports on the I/O controller are used and the console and auxiliary ports on the NPE-G1 or
NPE-G2 are disabled by Cisco IOS.
Both the NPE-G1 or NPE-G2 and the I/O controller console ports are available from the ROM monitor
(ROMmon); however, once the system has completed loading the Cisco IOS image, the console port on
the NPE-G1 or NPE-G2 is disabled if an I/O controller is also installed in the router.
If the NPE-G1 or NPE-G2 is used without an I/O controller, the console and auxiliary ports on the
NPE-G1 or NPE-G2 are available both during and after loading the Cisco IOS image.
Configuring an Auxiliary Port to Receive Console Port Messages
If you choose to have console port messages routed to the auxiliary port, use the Cisco IOS command
terminal monitor on the auxiliary port on which you desire to receive console messages.
Router# terminal monitor
Configuring the Native Gigabit Ethernet Interfaces
The NPE-G1 and NPE-G2 report both the RJ-45 and GBIC or SFP GE interface ports as GigabitEthernet
0/1, GigabitEthernet 0/2, and GigabitEthernet 0/3. Each interface has two ports with two different media
types, GBIC or SFP, or RJ-45 (default). You can use only one port for each interface, and before
configuring either port type, you must first use the media-type interface command to select the media
type, GBIC (gbic) for NPE-G1 or SFP (sfp) for NPE-G2, or RJ-45 (rj45) port.
NoteThe Gigabit Ethernet interfaces on the NPE-G1 and NPE-G2 do not support the Inter-Switch Link (ISL)
VLAN encapsulation protocol. We recommend that customers use the IEEE 802.1Q VLAN
encapsulation protocol as an alternative. Where an application requires the use of ISL, this can be
provided by the Fast Ethernet or Gigabit Ethernet port adapters or I/O controllers.
NoteThe RJ-45 port is the default media.
Changing the Media Type of the Native Gigabit Ethernet GBIC, SFP,
or RJ-45 Ports
To be able to use a particular media port, use Cisco IOS to select the media type. This is done by using
the media-type interface command:
media-type { gbic | sfp | rj45 }
Example:
interface GigabitEthernet 0/1
media-type rj45
end
Network Processing Engine and Network Services Engine Installation and Configuration
7-56
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Configuring the Native Gigabit Ethernet Interfaces
Configuring the Interface Transmission and Speed Modes
Step 1After changing the media type, configure the speed and transmission modes to appropriately match the
new interface characteristics. Changing the speed and duplex of an NPE-G1 or NPE-G2 Gigabit Ethernet
interface is done using the speed and duplex interface commands.
NoteThese commands are only applicable when using the RJ-45 media.
speed { 10 | 100 | 1000 | auto }
duplex { full | half | auto }
The following speed/duplex settings are supported:
Media Type Speed Duplex
------------------------------------------------------RJ45 10, 100, 1000, auto full, half, auto
GBIC(1) 1000, auto(2) full, half, auto
a. If you are using the no negotiation auto command, the speed and duplex should be set to a value
other than auto for correct operation.
b. The only available speed in the no autonegotiation mode is 1000 Mbps; there is no difference
whether 1000 or auto is selected.
When using the GBIC media, there is also the additional negotiation auto command that is used to
enable the IEEE 802.1z Gigabit Ethernet (1000 Mbps) autonegotiation protocol.
Step 2To turn the autonegotiation feature off (it is on by default), issue the interface command no negotiation
auto. This is useful for connecting to other Gigabit Ethernet equipment that does not support 802.1z
autonegotiation.
NoteThe autonegotiation feature is not supported when using the rj-45 media type and will be ignored if
implementation is attempted.
If you change from the GBIC or SFP to the rj-45 media type, you must set speed and duplex after you
have executed the media-type command to ensure the interface will operate in the correct mode.
The media-type GBIC or media-type SFP mode will always default to 1000 Mbps. Both full-duplex
and half-duplex operations are supported in this mode.
Sample Configuration for the Gigabit Ethernet Interfaces
The following shows a typical configuration for the three Gigabit Ethernet interfaces on the NPE-G1.
The same configuration would be typical for the NPE-G2 also, although the second interface would be
configured for the SFP media type. In this example, the first interface is configured for the GBIC media
type, the second interface is configured for the RJ-45 media type, and the third interface is not used.
interface GigabitEthernet0/1
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-57
Configuring the Native Gigabit Ethernet Interfaces
ip address 10.198.75.35 255.255.255.240
load-interval 30
no keepalive
duplex full
speed 1000
media-type gbic
no negotiation auto
no cdp enable
no shutdown
!
interface GigabitEthernet0/2
ip address 10.179.16.2 255.255.255.240
duplex auto
speed auto
media-type rj45
no cdp enable
no shutdown
!
interface GigabitEthernet0/3
no ip address
shutdown
duplex auto
speed auto
media-type rj45
no negotiation auto
no cdp enable
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
NoteAt the very minimum, an interface must be configured with the ip address, media-type, and speed
commands before it can be enabled using the no shutdown command. Other interface commands might
be needed, depending on the nature of the connected network.
Debugging
Cisco IOS provides two commands to provide information on your interfaces: show interface
GigabitEthernet 0/X (where X is 1, 2, or 3) and show controllers GigabitEthernet 0/0.
The output of the show interface command is useful for determining the current operating mode of the
interface (speed/duplex/media-type) and the current interface statistics.
The output of the show controllers command displays more information specific to the I/O controller
interface. For example, it shows the detected link status, speed, and duplex, and also determines the
current status of autonegotiation and the link partners’ abilities (if it is an autonegotiation-capable
interface).
The show controllers command also displays the current operating state of the driver and the Ethernet
controller hardware. The show controllers command is a very powerful debugging aid, especially for
Cisco engineers should you need help in debugging a problem. If you have any problems with your
Gigabit Ethernet interfaces, you will need to provide the show controllers command output to Cisco for
analysis.
Resetting the Interface
Should you have a problem with your interface and wish to try and reset it, use the command:
clear interface GigabitEthernet 0/X (where X is 1, 2, or 3)
Network Processing Engine and Network Services Engine Installation and Configuration
7-58
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Using show Commands to Check the Installation
Clearing Counters
Interface counters may be cleared (reset) by using the command:
clear counters GigabitEthernet 0/X (where X is 1, 2, or 3)
This will not reset the interface.
Using show Commands to Check the Installation
Use show commands to identify the hardware installed in your router, to verify the operation status, to
view interface configuration settings, and to troubleshoot your router configuration. The interfaces on
the NPE-G1 and NPE-G2 are identified by their chassis slot number and interface port number
(slot/port). The interfaces on your I/O controller are also identified by chassis slot number and interface
port number (slot/port). The chassis slot number for the I/O controller is always slot 0. Table 7-1 lists
the NPE-G1, NPE-G2, the I/O controller models, their corresponding interfaces, and the interface
addressing syntax for each interface.
Table 7-1Identifying Interface Addresses on the NPE-G1, NPE-G2, and Various I/O Controllers
Fast Ethernet/Ethernet (port 1)Chassis slot—always 0
fastethernet 0/1
Interface port—1
C7200-I/O-FE
2
Fast Ethernet (MII or RJ-45)Chassis slot—always 0
fastethernet 0/0
Interface port—0
C7200-I/ONo interface ports——
C7200-I/O-FE-MII
3
Fast Ethernet (MII)Chassis slot—always 0
fastethernet0/0
Interface port—0
1. Both optical and copper ports report the same syntax. For example, Gigabit Ethernet RJ-45 port 0/2 reports GigabitEthernet 0/2, as does Gigabit Ethernet
GBIC port 0/2. You can use only one port per interface, depending on the port selected using the media-type command.
2. The Product Number C7200-I/O-FE does not specify MII because both an MII and an RJ-45 receptacle are included.
3. The I/O controller with the Product Number C7200-I/O-FE-MII has a single MII Fast Ethernet receptacle only. Although still supported by Cisco, this
I/O controller with a single MII receptacle is no longer an orderable product as of May 1998.
The remainder of this section provides examples of show commands that pertain to the NPE-G1 and
NPE-G2. The output from the show commands is from the NPE-G1 or the NPE-G2.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-59
Using show Commands to Check the Installation
To determine the hardware configuration of your NPE-G1 or NPE-G2, use the show version command.
The following example shows an NPE-G2 installed in a Cisco 7206VXR router:
Router# show version
Cisco IOS Software, 7200 Software (C7200-JS-M), Version 12.4(PC_D.051028) UBUILDIT Image,
Copyright (c) 1986-2005 by Cisco Systems, Inc.
Compiled Fri 28-Oct-05 00:30 by biff
(display text omitted)
Cisco 7206VXR (NPE-G2) processor (revision A) with 917504K/131072K bytes of memory.
Processor board ID 32428149
MPC7448 CPU at 1660Mhz, Implementation 0, Rev 2.0
6 slot VXR midplane, Version 2.8
(display text omitted)
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Network Processing Engine and Network Services Engine Installation and Configuration
7-60
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Use the show controllers command to display initialization block information, transmit ring, receive
ring, and errors for the interface controllers. The following example provides information about the
interfaces on the I/O controller C7200-I/O-2FE/E and the NPE-G1 installed in a Cisco 7206VXR router:
Router# show controllers
Interface FastEthernet0/0 (idb 0x62EC78B8)
Hardware is i82543 (Livengood) A1
network link is up
Config is Auto Speed, Full Duplex
loopback type is none
10/100 PHY is enabled (MII mode)
(display text omitted)
Interface FastEthernet0/1 (idb 0x62EBA1A4)
Hardware is i82543 (Livengood) A1
network link is up
Config is Auto Speed, Auto Duplex
loopback type is none
10/100 PHY is enabled (MII mode)
(display text omitted)
Using show Commands to Check the Installation
Interface GigabitEthernet0/1 (idb 0x62E3A4AC)
Hardware is BCM-12500 Internal MAC
Network connection mode is AUTO
MAC Registers:
(display text omitted)
Interface GigabitEthernet0/2 (idb 0x62E4F968)
Hardware is BCM-12500 Internal MAC
Network connection mode is AUTO
Physical Interface - RJ45
(display text omitted)
Interface GigabitEthernet0/3 (idb 0x62E6581C)
Hardware is BCM-12500 Internal MAC
Network connection mode is AUTO
Use the show interface or show interface slot/port command to display status information:
Router# show interface g0/1
GigabitEthernet0/1 is administratively down, line protocol is down
Hardware is BCM-12500 Internal MAC, address is (display text omitted)
rxload 1/255
Encapsulation ARPA, loopback not set
Unknown duplex, Unknown Speed, link type is autonegotiation, media type is unknown 0
output flow-control is unsupported, input flow-control is unsupported
ARP type:ARPA, ARP Timeout 04:00:00
Last input never, output never, output hang never
Last clearing of "show interface" counters 21:18:23
Queueing strategy:fifo
Output queue 0/40, 0 drops; input queue 0/75, 0 drops
5 minute input rate 0 bits/sec, 0 packets/sec
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-61
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Upgrading the Cisco IOS Image and the Boot Helper (Boot Loader) Image
Upgrading the Cisco IOS Image and the Boot Helper (Boot
Loader) Image
Should you ever upgrade the Cisco IOS image on your Cisco 7200 VXR router with an NPE-G1 or
NPE-G2, you need to ensure that you also upgrade your boot helper (boot loader) image.
The boot helper (boot loader) image resides in flash memory on the NPE-G1 and NPE-G2 and contains
a subset of the Cisco IOS software. This image is used to boot your router from the network or to load
Cisco IOS images onto the router. This image is also used if the system cannot find a valid system image.
Your boot helper (boot loader) image should correspond to the Cisco IOS release that is running on your
router.
• The NPE-G1 requires the c7200-kboot boot helper image.
• The NPE-G2 requires the c7200p-kboot-mz helper image.
• The Cisco uBR7200-NPE-G1 requires the ubr7200-kboot-mz boot helper image.
• The Cisco uBR7200-NPE-G2 requires the ubr7200p-kboot-mz boot helper image.
To upgrade your boot helper (boot loader) image, obtain the most current boot helper image through
Cisco.com and copy the new boot helper image to flash memory on your router. For information on how
to access Cisco.com, see the “Obtaining Documentation and Submitting a Service Request” section on
page -iv. Follow the Software Center link under Service and Support. You need to get a login code
from a Cisco representative to retrieve files from the Software Center.
To obtain a boot helper (boot loader) image from Cisco.com and upgrade your boot flash memory, do
the following:
Step 1Download the boot helper (boot loader) image from Cisco.com to a Trivial File Transfer Protocol
(TFTP) server.
Step 2Reformat the flash memory on your router as follows:
router# format bootflash:
Format operation may take a while. Continue? [confirm]
Format operation will destroy all data in "bootflash:". Continue? [confirm]
Formatting sector ...
Format of bootflash:complete
NoteReformatting flash memory erases the current flash memory contents.
Network Processing Engine and Network Services Engine Installation and Configuration
7-62
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Step 3Copy the boot helper image from the TFTP server to flash memory as follows:
router# copy tftp bootflash:
Address or name of remote host []? biff
Source filename []? c7200-boot-mz.120-5.S
Destination filename [c7200-boot-mz.120-5.S]?
Accessing tftp://biff/c7200-boot-mz.120-5.S...
Loading c7200-boot-mz.120-5.S from 192.168.254.254 (via
Ethernet4/0):!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
[OK - 3132516/6264832 bytes]
3132516 bytes copied in 28.488 secs (111875 bytes/sec)
This completes the procedure for upgrading your boot helper (boot loader) image. For more detailed
instructions on loading and maintaining system images and microcode, including boot helper images,
refer to the Configuration Fundamentals Configuration Guide, which is available on Cisco.com.
Upgrading ROMmon on the NPE-G1 or NPE-G2
Upgrading ROMmon on the NPE-G1 or NPE-G2
Upgrading the rewriteable ROM monitor (ROMmon) allows you to download a new ROMmon image
instead of having to replace hardware (NPE-G1 or NPE-G2) to get a new image.
NoteROMmon can be upgraded on the NPE-G1 or NPE-G2, but cannot be upgraded on any other network
processor engine for the Cisco 7200 series routers.
There are two ROMmon images: one ReadOnly image (the original image that shipped with your
system) that is always available if you have the following:
• NPE-G1 hardware EPROM version 4.0 with NPE-G1 ROMmon version 12.3(4r)T1 or later
• NPE-G2 hardware
You can choose to configure the system to point to the second ROMmon image, the upgradeable
ROMmon image. At bootup, the system starts with the ReadOnly image and then, if configured, jumps
to the upgradeable image. If the upgradeable ROMmon image fails to boot, the router will mark this
ROMmon image as invalid and revert to the ReadOnly image.
The first time a new ROMmon image is executed, you must allow the system to boot ROMmon before
doing any additional resets or power cycling. If the ROMmon-executing process is interrupted, the stem
interprets this as a bootup failure of the new ROMmon image. The router reverts to the ReadOnly image.
NoteThe ROMmon upgrade image is marked as invalid if it fails to boot. Do not reset the router when it is
performing an initial bootup.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-63
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Upgrading ROMmon on the NPE-G1 or NPE-G2
Using the show rom-monitor Command and ROMmon CLI showmon Commands
Use the show rom-monitor command if you are in Cisco IOS, or the ROMmon CLI showmon command
if you are in ROMmon, to determine which ROMmon images are available. See the following examples
for information shown in the output of the show rom-monitor or ROMmon CLI showmon commands:
• If you are in Cisco IOS, use the show rom-monitor command:
Router> show rom-monitor
ReadOnly ROMMON version:
System Bootstrap, Version 12.2(20031011:151758)
Copyright (c) 1994-2003 by cisco Systems, Inc.
Upgrade ROMMON version:
System Bootstrap, Version 12.2(20031011:151758)
Copyright (c) 1994-2003 by cisco Systems, Inc.
Currently running ROMMON from Upgrade region
ROMMON from Upgrade region is selected for next boot
• If you are in ROMmon, use the ROMmon CLI showmon command:
rommon 1 > showmon
ReadOnly ROMMON version is:
System Bootstrap, Version 12.2(20031011:151758) [biff]
Copyright (c) 1994-2003 by cisco Systems, Inc.
Upgrade ROMMON version is:
System Bootstrap, Version 12.2(20031011:151758) [biff]
Copyright (c) 1994-2003 by cisco Systems, Inc.
Upgrade ROMMON currently running
Upgrade ROMMON is selected for next boot
rommon 2 >
Using the upgrade rom-monitor file Command
Use the upgrade rom-monitor file file_id command to program the ROMmon.
See the following example of the upgrade rom-monitor file command:
This command will reload the router. Continue? [yes/no]:yes
ROMMON image upgrade in progress.
Erasing boot flash eeeeeeeeeeeeeeeeee
Programming boot flash ppppp
Now Reloading via hard watchdog timeout
Unexpected exception, CP
System Bootstrap, Version 12.2(20031011:151758) [biff]
Copyright (c) 1994-2003 by cisco Systems, Inc.
Network Processing Engine and Network Services Engine Installation and Configuration
7-64
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Running new upgrade for first time
System Bootstrap, Version 12.2(20031011:151758) [biff]
Copyright (c) 1994-2003 by cisco Systems, Inc.
ROM:Rebooted by watchdog hard reset
C7200 platform with 1048576 Kbytes of main memory
Upgrade ROMMON initialized
rommon 1 >
NoteIt is advisable to load a known good Cisco IOS image after a ROMmon upgrade.
Changing Preferences to Choose the Other ROMmon Image
To use the other ROMmon image, use one of the following commands to make the change depending on
whether you are in Cisco IOS or in ROMmon:
• In Cisco IOS, use the upgrade rom-monitor preferencecommand to change to the other ROMmon
Router: upgrade rom-monitor preference readonly
You are about to mark ReadOnly region of ROMMON for the highest boot preference.
Proceed? [confirm]
Done! Router must be reloaded for this to take effect.
• In ROMmon, use the ROMmon CLI rommon-pref command to change to the other ROMmon
image:
rommon-pref [readonly | upgrade]
Example:
rommon 2 > rommon-pref readonly
Troubleshooting the Upgrade
This section contains sample error messages that appear if an upgrade fails, or if an upgrade is
successful, but the upgrade image is corrupted.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-65
Troubleshooting the Upgrade
ROMmon Upgrade Error Messages
One if these error message appears when the upgrade has failed or if the upgrade image is corrupted:
• ROMmon image is not compatible with the ReadOnly image:
System Bootstrap, Version 12.2(20031011:151758) [biff-npeg2-fur 135], DEVELOPMENT
SOFTWARE
Copyright (c) 1994-2003 by cisco Systems, Inc.
Upgrade ROMMON corrupted.
Falling to ReadOnly ROMMON
ROM:Rebooted by watchdog hard reset
C7200 platform with 1048576 Kbytes of main memory
Readonly ROMMON initialized
Network Processing Engine and Network Services Engine Installation and Configuration
7-66
OL-4448-12
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Upgrading FPGA on the NPE-G2
A field-programmable gate array (FPGA) device exists on the NPE-G2. FPGA devices do not exist on
other Cisco 7200 series routers network processing engines. FPGA devices are a type of
field-programmable device (FPD) that support separate software upgrades. Whenever a Cisco image is
released that supports the FPD feature, a companion FPD image package is also released for that
Cisco IOS software release. The FPD image package is available from Cisco.com and is accessible from
the Cisco Software Center page where you go to download your Cisco IOS software image.
NoteFor Cisco IOS Release 12.4(4)XD, only a manual FPD upgrade of the NPE-G2 is supported.
For FPGA upgrade information and procedures, see the Field-Programmable Device Upgrades
document at:
For troubleshooting information, see the “Troubleshooting the NPE-G1 or NPE-G2” section on
page 10-2.
Fiber Optic Cleaning Information
We strongly recommend cleaning all optical fiber connections before reconnecting optical cables to
equipment. For information about cleaning optical connectors, see the Inspection and Cleaning
Procedures for Fiber-Optic Connections document and the Compressed Air Cleaning Issues for
Fiber-Optic Connections document.
OL-4448-12
Network Processing Engine and Network Services Engine Installation and Configuration
7-67
Fiber Optic Cleaning Information
Chapter 7 NPE-G1 and NPE-G2 Installation and Configuration Information
Network Processing Engine and Network Services Engine Installation and Configuration
7-68
OL-4448-12
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.