Blu Bathworks BCZ615C User Manual

®
wall-mount vanities
Installation Guide
Series 600
BCZ615C
Series 900
Series 700
BCZ715C
BCZ915C
BCZ715C X2
BCZ115C
BCZ915C X2
2014-03
1 866 907 0122 blubathworks.com
®
Attention — Before Installation
Thank you for choosing from among Blu’s quality line of products. We recommend that you carefully read this installation guide to ensure your vanity’s proper operation and reliability for many years to come.
NOTE: Product is already optimized/preset for best drawer fitting - only minor adjustments may be needed Adhere to all local building and plumbing codes. The diagrams in this guide are not construction plans. They are visual aids.
Installation Requirements
Please read the instructions carefully so as to avoid any damage to the fixture.
1. To ensure this product is installed properly, you must read and follow these guidelines.
2. The owner/user of the product must keep this information for future reference.
3. Consult local building codes to make sure the installation complies with standards.
4. Remove the unit from its packaging. Before disposing of it, inspect the unit to make sure its in good shape. Should inspection reveal any damage or defect in the finish, contact your distributor. The warranty does not cover damages or defects in the finish once it has been installed. Blu Bathworks’ responsibility for shipping damages ceases upon delivery of the product in good order to the carrier. All complaints regarding damage due to transport must be made directly to the carrier.
5. Place the unit in the bathroom before you start working. Conserve all nuts and bolts.
6. To protect the unit during installation, we recommend that you lay a piece of cardboard on the bottom.
7. If the unit is covered with polyethylene protective film, do not remove until installation is complete to grant maximum protection. However, remove film where any two surfaces will be in permanent contact.
8. Verify that all dimensions on the plan are the same as the ones of the unit.
Installation Notes
Important! Install this product according to the installation guide.
Tools Required:
long phillips screwdriver tape measure level
Technical Support Assistance
If further assistance is required, please contact:
Product Support at 1.866.907.0122 (09:00 – 17:00hrs PST) or email technical@blubathworks.com
North America Blu Bathworks Inc. 188 Smithe Street,Vancouver, BC, Canada, V6B 6A9 T +1.604.299.0122 F +1.604.299.0125
2014-03
1 866 907 0122 blubathworks.com
1
®
FASTENING HOLES FOR HANGING SINK BASE
TROUS DE FIXATION BAS LAVABO SUSPENDU
FIXING HANGING VANITY UNIT (DEEP DRAWER)
MONTAGE BASE PORTE LAVABO SUSPENDUE (COFFRE)
3
4 5
Ø9mm Ø0,35in
Fastening holes for wall-mount vanity
Trous de fixation bas lavabo suspendu
1
Extraction drawers
Extraction tiroir
D1
... with undercounter washbasin
... avec lavabo encastrement par dessous
D2
21
2
D2
D1
ON VANITY UNIT H. 45
SUR BASE H. 45
PORTE-LAVABO
190 mm
7,48 in
35 mm 1,38 in
870 mm
(*)
34,25 in
(*) H. suggested including top - H. conseillée plan de toilette compris
Measurements in mm / inch - Dimensions en mm / inch
95 mm 3,74 in
95 mm 3,74 in
35 mm 1,38 in
2014-03
1 866 907 0122 blubathworks.com
2
®
FIXING HANGING VANITY UNIT (DEEP DRAWER)
MONTAGE BASE PORTE LAVABO SUSPENDUE (COFFRE)
Fixing wall-mount vanity unit
Montage base porte lavabo suspendue (coffre)
3
3
Ø9mm Ø0,35in
4 5
4
6 7
* ensure brackets are level before mounting vanity
Ø9mm Ø0,35in
5
76
Ø9mm
Ø0,35in
Insertion drawers
Insertion tiroir
D2
D1
2014-03
1 866 907 0122 blubathworks.com
3
Loading...
+ 9 hidden pages