BilJax Multi-Stage AS-2100 Assembly Instructions Manual

PRINTED IN USA
ASSEMBLY INSTRUCTIONS
P/N: LL-204-51
Assembly Instructions Include:
Step 1: Site Preparation Step 8: Bracing Step 2: Leg Assembly Step 9: Guard Rail Installation Step 3-7: Setting the Stage Step 10: Stairs
Step 1 Site Preparation
A. Determine the exact location where the stage will be erected. B. For outdoor stages, mudsills are required to distribute the weight
(125 PSF to 150 PSF) on the stage legs. This will prevent the legs from sinking and ease the leveling of the stage.
C. All base pads and mudsills should be placed only on a horizontal
surface.
Step 2 Leg Assembly
Attach an adjustable rubber base pad to each galvanized leg using a 2” snap pin.
The leg sockets on the stage sections fit 1-3/4” sq. stage legs. Use one of the following only:
a) 1-3/4” telescoping stage legs. Overlap telescoping section a minimum of
6” and secure with a 2” snap pin as shown at left. b) 1-3/4” non-telescoping stage legs. c) 1-1/2” sq. non-telescoping stage legs with a 1-3/4” sleeve. Overlap sleeve
a minimum of 6” and secure with a 2” snap pin as shown at left.
Step 3 Setting the Stage
A. Insert legs completely into all four corner sockets (and into
intermediate sockets, when required) of the first stage section.
B. See Table on Page 8 for rated loads of all stage configurations.
WARNING
Failure to properly install stage legs will result in serious injury or death.
C. Tighten the leg socket clip (image at right) at each corner socket
where a stage leg is installed.
TO INSTALL STAGE LEGS:
Pull and hold pin in the unlocked position.  Insert leg.
Release pin to lock leg in place.
IMPORTANT:
member. Leg must be FULLY INSERTED so that it touches the bottom of stage deck.
Pin is not a load-bearing
2
Step 3 Setting the Stage, Continued
A. Set first stage section in back left-hand corner of stage site.
Any corner may be used as a starting point when using 4’ x 4’ decks exclusively.
B. Align the stage section so that the connecting brackets
facing up are inside the starting area and the connecting brackets facing down are outside, as shown in the diagram.
As additional stage sections are added, always make sure that the up-facing connecting brackets face toward the stage site. Build stage in the direction(s) indicated by the arrows in
the diagrams below and at right.
NOTE: When using 4’ x 8’ stage sections, adjust the starting point to achieve desired stage position and shape. Up-facing connecting brackets should always face toward the stage site.
Step 4
A. Set the back row of stage sections first. B. Insert two legs into each additional stage section,
as shown, and attach to previous section by inserting the connecting brackets into the C­Channel of the adjacent stage section.
C. Additional stage sections should be attached so
that connecting brackets facing up are inside the starting area.
3
Loading...
+ 5 hidden pages