Baumfolder BAUM20 Split Guide installation

Model 2020 Splitguide Installation
Overall Top view showing both marbleholders mounted to the 8-page right angle folder.
The transfer table is driven by friction using a collar that mounts on the lower slittershaft to drive the adjoining drive roller on the transfer table. This is located at both ends of the assembly to provide drive.
Baumfolder Corporation 1660 Campbell Rd., P.O. Box 728 Sidney, OH USA 45365-0728
Phone: 937-492-1281 or 800-543-6107 Fax: 937-492-7280
email: BAUM@bright.net
Install pullout wheels on ejector roller and transfer table to guide sheet into respective marbleholders. Note holddown assembly for crosscarrier.
Remove existing marbleholder upper support and install shorter marbleholder assembly onto same bar. A lower square support bar must be mounted between two of the crosscarrier rollers using the existing holes found in the frames. This bar enables proper support of the end of the shorter marbleholder.
Baumfolder Corporation 1660 Campbell Rd., P.O. Box 728 Sidney, OH USA 45365-0728
Phone: 937-492-1281 or 800-543-6107 Fax: 937-492-7280
email: BAUM@bright.net