Model 2020 Splitguide Installation
Overall Top view showing both marbleholders
mounted to the 8-page right angle folder.
To install the transfer table and ejector roller, mount
the assembly in the exit end of the parallel folder
section using the posts that the hangon delivery
stacker mount onto. In and out adjustments are
provided for repeat installation using the adjustment
screws. The brass-tipped locking knob at each end
is used to secure in place.
The transfer table is driven by friction using a
collar that mounts on the lower slittershaft to drive
the adjoining drive roller on the transfer table. This
is located at both ends of the assembly to provide
drive.
Baumfolder Corporation 1660 Campbell Rd., P.O. Box 728 Sidney, OH USA 45365-0728
Phone: 937-492-1281 or 800-543-6107 Fax: 937-492-7280
email: BAUM@bright.net
Install pullout wheels on ejector roller and transfer
table to guide sheet into respective marbleholders.
Note holddown assembly for crosscarrier.
Remove existing marbleholder upper support and
install shorter marbleholder assembly onto same
bar. A lower square support bar must be mounted
between two of the crosscarrier rollers using the
existing holes found in the frames. This bar enables
proper support of the end of the shorter
marbleholder.