User manual
8G.52.80.00/03.15 Changes reserved.
iC-Range
iS-Range
iR-Range
User manual ATAG iC, iS and iR-Range
2
Contents
1. Introduction ....................................................................................3
2. Safety .............................................................................................5
3. Boiler description ............................................................................6
4. Display and functions .....................................................................7
4.1 DHW and Heating program ....................................................8
4.2 Eco function DHW (iC-Range only) .......................................9
4.3 Requesting current boiler data (info mode) ............................9
4.4 The Reset button .................................................................10
4.5 Frost protection ....................................................................10
5. Filling the heating system .............................................................11
6. Decommissioning the boiler .........................................................13
7. Error codes ...................................................................................14
8. Maintenance .................................................................................14
9. Warranty .......................................................................................14
Important!
It is in your own interest that we should know that you have an ATAG
boiler. Please ll out the warranty card completely and send it back to us.
Then we can be fully at your service.
User manual ATAG iC, iS and iR-Range
3
1 Introduction
These operating instructions describe the functioning and the operating of the
ATAG i-Range boilers. This manual is for the end user. For installation and
servicing there is an installation & servicing instructions manual for the installer.
Read this manual fully before operating the boiler. In case of doubt or errors
contact your installer.
ATAG Heating Technology Ltd reserves the right to change the specications and
dimensions without prior notice.
Work on the boiler must be carried out by a competent person, (Ref: Gas Safe
Register) using correctly calibrated instruments with current test certication.
When replacing parts use only ATAG Service parts.
Contact details for ATAG Heating Technology Ltd can be found on the back page
of this manual.
User manual ATAG iC, iS and iR-Range
4
The Benchmark Scheme
ATAG Heating Technology Ltd is a licensed member of the Benchmark Scheme
which aims to improve the standards of installation and commissioning of
domestic heating and hot water systems in the UK and to encourage regular
servicing to optimise safety, efciency and performance.
Benchmark is managed and promoted by the Heating and Hotwater Industry
Council. For more information visit www.centralheating.co.uk
Please ensure that the installer has fully completed the Benchmark Checklist on
the inside back pages of the installation instructions supplied with the product and
that you have signed it to say that you have received a full and clear explanation
of its operation. The installer is legally required to complete a commissioning
checklist as a means of complying with the appropriate Building Regulations
(England and Wales).
All installations must be notied to Local Area Building Control either directly
or through a Competent Persons Scheme. A Building Regulations Compliance
Certicate will then be issued to the customer who should, on receipt, write the
Notication Number on the Benchmark Checklist.
This product should be serviced regularly to optimise its safety, efciency and
performance. The service engineer should complete the relevant Service Record
on the Benchmark Checklist after each service.
The Benchmark Checklist may be required in the event of any warranty work
and as supporting documentation relating to home improvements in the optional
documents section of the Home Information Pack.
User manual ATAG iC, iS and iR-Range
5
2 Safety
Work on the installation should only be carried out by qualied personnel with
calibrated equipment. When replacing parts, only ATAG Service components may
be used.
If you smell gas:
- No naked ames! No smoking!
- Do not switch lights on or off or use other electrical switches.
- Do not use the phone
- Close the gas mains
- Open windows and doors
- Warn the occupants and leave the building
- Only call the gas company or installer once you are outside the building.
Corrosion protection
Do not use sprays, chlorine-containing cleaning products, solvents, paints etc.
in the vicinity of the device or its air supply. These substances have an adverse
impact on the device and can lead to corrosion that may result in failures.
Checking the heating water
Always use potable water for lling the installation.
Adding chemical agents such as frost and corrosion inhibitors are only to be
added by your installer.
If in doubt, check with your installer or ATAG Heating Technology Ltd.