APC SYA8K8P Owners Manual

Page 1
.Symmetra
Rail Installation Guide
Overview
Illustrations are representative. Your equipment, may be different from the models shown in this guide.
®
APC
and Symmetra® are registered trademarks of American Power Conversion Corporation. All other trademarks are the property of their respective owners.
Installation
Install Clip Nuts
1. Mark clip nut locations in the front rack posts.
a. Count up from the bottom u-space or designated
u-space location in the rack.
b. Refer to the table for clip nut locations.
c. Install clip nuts in the marked locations in
the rack.
Install Rails
©
2004 by American Power
A
B
C
®
LX UPS
UPS 8 kVA
15, 24, 38
UPS 16 kVA
15, 24, 33, 42, 48, 56
B
A
6
6
C
1. Mark rail hole locations in all four rack posts.
a. Refer to the table for rail hole locations.
b. Count up from the bottom u-space or designated
u-space location in the rack
2. Slide and adjust the rails to the depth of the inside of the rack.
3. Use the countersunk screws to attach the rails in the marked locations in the rack.
D
UPS 8 kVA
E
F
UPS 16 kVA
Front: 1, 3, 4, 5
Rear: 2, 3, 4, 5
G
F
D
1
1
16
F
E
G
990-1712 01/2004
Page 2
.Symmetra
®
LX Extended Run Cabinet
Rail Installation Guide
Overview
Illustrations are representative. Your equipment, may be different from the models shown in this guide.
®
APC
and Symmetra® are registered trademarks of American Power Conversion Corporation. All other trademarks are the property of their respective owners.
©
2004 by American Power
A
Installation
Install Clip Nuts
1. Mark clip nut locations in the front rack posts.
a. Count up from the from the first u-space
location above the UPS.
b. Refer to the table for clip nut locations.
c. Install clip nuts in the marked locations in
the rack.
Install Rails
1. Mark rail hole locations in all four rack posts.
a. Refer to the table for rail hole locations.
b. Count up from the first u-space location above
the UPS.
2. Slide and adjust the rails to the depth of the inside of the rack.
3. Use the countersunk screws to attach the rails in the marked locations in the rack.
A
B
C
D
E
F
G
3 Battery Frame
13
9 Battery Frame
15, 24, 33
B
3 Battery Frame
9 Battery Frame
Front: 1, 3, 4, 5
Rear: 2, 3, 4, 5
F
3
3
C
1
D
1
F
E
16
G
990-1712 01/2004