Contents
Preliminary Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Silcon versus non-Silcon installation . . . . . . . . . . . . . . . . . . . 1
Inventory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Safety Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Pre-installation Procedures. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Lockout/Tagout the UPS . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Determine battery numbers . . . . . . . . . . . . . . . . . . . . . . . . 4
Determine fuse bus and midpoint bus connections (Silcon only) 4
Install the Wire Harnesses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
How to install the tab washers on non-embedded terminals . . . 6
How to install tab washers on embedded battery terminals . . . 7
Prepare the harness wires . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Install the battery and power fuses . . . . . . . . . . . . . . . . . . . 8
Connect the battery wires . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Additional Silcon Connection Procedures . . . . . . . . . . . . . . . . . 10
Attach harness to the fuse bus and midpoint bus (Silcon only) 10
Install the 3/4 A and 5 A fuses (Silcon only) . . . . . . . . . . . . . 10
Secure the Wire Harness . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Secure the battery wires . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Connect to the Battery Management System . . . . . . . . . . . . . . 12
Install the Battery Management System . . . . . . . . . . . . . . . . 12
String connection . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Battery Connector Pinouts. . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Battery Diagrams. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Warranty and Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Limited warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Warranty limitations . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Obtaining service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Life-Support Policy. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
General policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Examples of life-support devices . . . . . . . . . . . . . . . . . . . . 16
Wire Harness: Installation i
Preliminary Information
Overview
Silcon versus non-Silcon
installation
The Battery Management System for high voltage applications connects
to one of the following:
• A single APC Silcon UPS with pairs of strings.
• A single non-APC UPS with single strings.
The system provides battery management for nominal 2 V, 6 V, 8 V, or
12 V lead-acid batteries; or 1.2 V nickel-cadmium batteries. A system is
comprised of at least one AP9921X master unit and up to five
AP9921XS expansion units. Each unit supports up to 64 batteries.
For more information on the features and capabilities of the
Battery Management System, see the initial sections of the
User’s Guide, which is available on the Utility CD supplied
See also
Note
This manual covers the installation of two types of systems:
• An installation for an APC Silcon battery cabinet
• An installation using 5-, 50-, or 100-foot wire harnesses, to be cut
with the Battery Management System.
Do not turn on the power to the unit until the wire harnesses
are connected and the DIP switches are configured.
at installation to match your battery configuration
The majority of the procedures in this manual are used for both system
installations. Disregard Silcon-specific instructions (i.e., midpoint and
fuse bus connections) if you are installing a generic harness to fit your
battery cabinet or rack that is not for an APC Silcon UPS.
Wire Harness: Installation 1
Preliminary Information
Inventory
Item Quantity
Wire harness 1
Ring terminal assemblies 3
3/4 A fuse (0W2237) 2
5 A fuse ( 0W2015) 38
Tab w a s he r s 38
®
Male Faston
connectors 5
Female Faston connectors 37
4-inch wire tie
for 5-foot harness
for 50-foot harness
for 100-foot harness
20
80
80
8-inch wire tie
for 5-foot harness
for 50-foot harness
for 100-foot harness
20
40
80
2 Wire Harness: Installation
Safety Information
Electrical
Hazard
Warning
When installing the Battery Management System:
• Cover the batteries with an insulating blanket before installing the
harnesses.
• Wear safety glasses, rubber gloves, and rubber boots.
• Use double-insulated tools.
• Do not short-circuit the battery terminals; a short circuit could cause
the batteries to explode.
• Do not lay tools or metal parts on top of the batteries or near the
cable lugs.
• Remove watches, rings, and other metal objects.
• Use only cables supplied by APC unless otherwise indicated.
• For the UPS and switch gear, use Lockout/Tagout safety procedures
(which remove access to a device and physically label the device as
intentionally out of service) before working on the batteries.
Risk of electric shock: battery cabinets contain
potentially lethal voltages! Batteries are energized even
when AC power has been disconnected.
Only qualified personnel, trained in battery operation
and safety, may install the harnesses. Keep unauthorized
personnel away from the batteries.
Wire Harness: Installation 3
Pre-installation Procedures
Lockout/Tagout the UPS
Determine battery
numbers
Determine fuse bus and
midpoint bus
connections (Silcon only)
Before installing the wire harnesses, use lockout and tagout safety
procedures for the UPS or any attached equipment, such as high-voltage
power supplies. If possible, disconnect the main output lead from the
battery string to the load.
Voltage is present in the battery cabinet even after
disconnecting it from the main load. Use caution when
Electrical
Hazard
Before installing the harness wires, designate a battery number to each
battery in your system. Using a volt meter to check polarity, determine
the most positive battery in your string (Battery 1), and count to the most
negative (last) battery in your string.
Locate the 1/2-fuse bus connectors and 1/2-midpoint bus connectors on
the inside roof of the cabinet.
working with the batteries.
Fuse Bus
Midpoint Bus
• The positive fuse bus connectors and midpoint bus connectors are
on the right side of the cabinet.
• The negative fuse bus connectors and midpoint bus connectors are
on the left side of the cabinet.
4 Wire Harness: Installation