American Standard BERWICK T430.50X User Manual

Installation
Instructions
BERWICK™/ BOULEVARD
BATH AND SHOWER TRIM KIT
Thank you for selecting American-Standard...the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--please read these instructions carefully before you begin.
Recommened Tools
Phillips Screwdriver
Plumbers' Putty or Caulking
Teflon Tape
Flat Blade Screwdriver
Certified to comply with ANSI A112.18.1
M 9 68602 REV. 1.4
Adjustable Wrench
Channel Locks
ROUGHING-IN DIMENSIONS
To assure proper positioning in relation to wall, note roughing-in dimensions.
1-5/8" TO 3-1/4" (41 TO 83mm)
1/2" (12mm) NPT
1/2" (13mm) COPPER
5" (127mm) REF.
74" (1880mm)
FOR HEAD
CLEARANCE
TOP OF T UB RI M
FINISHED WALL
12" (305mm) REF.
18" (457mm)
OPTIONAL
1-1/2" REF.
BOTTOM OF TUB
2-1/4" (57mm)
(38mm)
4-7/8" REF.
(124mm)
1-5/8" TO 3-1/4" (41 TO 83mm)
OPTIONAL TO FINISHED
FLOOR USUALLY
BETWEEN 65'' AND 80''
(1651 AND 2032mm)
7-1/4"
(184mm)
4"
(102mm)
(86mm)
3-3/8"
(86mm)
OUTLETS
1/2" NPT
(13mm)
SHR. 1/2" (13mm) NOM.
COPPER SWEAT
SWEAT INLETS
TUB 1/2" (13mm) NOM.
COPPER SWEAT
INLETS 1/2" NPT
(13mm)
3-3/8"
THREADED INLETS
INLETS
4-1/16"
(103mm)
SHR. 1/2" (13mm) NOM.
COPPER SWEAT
TUB 1/2" (13mm) NOM.
COPPER SWEAT
OUTLETS
1/2" NPT
(13mm)
3-3/8"
(86mm)
THREADED INLETS (STOPS)
INLETS 1/2" (13mm) NOM. COPPER SWEAT
2"
(51mm)
4-1/16"
(103mm)
SWEAT INLETS (STOPS)
5-7/8"
(149mm)
5-7/8"
(149mm)
4-1/16"
(103mm)
INLETS 1/2" (13mm) NOM. COPPER SWEAT
INLETS 1/2" NPT (13mm)
INSTALL VALVE TRIM
1
Figure 1. Remove plaster guard from valve. Push CAP (1) over VALVE CARTRIDGE (2) until seated against stop.
Figure 2. Push ESCUTCHEON HOLDER (3) onto CAP (1) and attach to valve body with LONG SCREWS (4). Mount ESCUTCHEON SUPPORT (5) to ESCUTCHEON HOLDER (3) with 4 SHORT SCREWS (6).
Figure 3. Install ESCUTCHEON (7) onto CAP (1) and push flush against finished wall. Escutcheon (7) will snap fit onto ESCUTCHEON SUPPORT (5).
1
4
5
PLSTER GUARD
Figure 1.
1
2
7
3
Figure 2.
6
INSTALL TRIM
2
Note: Apply sealant or Teflon Tape to shower arm.
Remove PIPE PLUG and CAP (1, 2) from shower pipe and tub filler pipe.
Install SHOWER ESCUTCHEON (3) onto SHOWER ARM (4). Apply sealant or Teflon tape to threads on both ends of SHOWER ARM (4) and thread longer leg of SHOWER ARM (4) into shower elbow. Thread SHOWER HEAD (5) onto SHOWER ARM (4).
Install TUB SPOUT (6). Tighten with HEX WRENCH supplied.
Important: Do not overtighten Set Screw.
CAUTION: Protect finish on SHOWER HEAD and TUB SPOUT when installing.
3
O-RING
1
5
Figure 3.
INSTALL HANDLE
3
Hold ADAPTER (1) onto VALVE STEM (2) and install ADAPTER SCREW (3) through ADAPTER (1) into VALVE STEM (2).Tighten ADAPTER SCREW (3) to secure ADAPTER (1) to VALVE STEM (2).
Install HANDLE BASE (4) onto ADAPTER (1). Insert SET SCREW (5) into HANDLE BASE (4). Align HANDLE BASE (4) and tighten with HEX WRENCH (6) supplied.
1-1/2"
4
5
3
4
1
APPLY SEALANT OR TEFLON TAPE TO THREADS
2
2
1
5
6
6
HEX WRENCH
M 9 68602 REV. 1.4
Loading...
+ 2 hidden pages