Airbagit Street Scraper User Manual

C
g
nitoetf
A
U
T
O
T
O
BYWLA
AD799
1
AB289
1
SN789
1
LACSA
E
)
ATO
Z
UCA
S
)
K
R
F
N
R
F
g
aerAsiT
t
t
O
DAKOTA
s
Chevy 1500 Chevy S10 Dodge Dakota Ford Ranger Mitsi Nissan Isuzu Mazda
STREETSCRAPER INSTALL
DO NOT CUT FRAME BEFORE INSTALLATION Support support vehicle with jack stands under the frame. Remove Leafsprings, Spring hangers, and Shocks Lower Cross Member Install Lower Cross Member on axle Step Notches Slide notches over the frame rails as shown in picture. Drill bolt holes Using notches as a template, drill all holes. Use a 1/2hp strong electric drill. Install airbags Tighten securely. If they are loose at the bottom, they will “rock” and bend the studs. Attach Links to the differential and the front cross-member
100% BOLT-ON
add $85 & we will assemble
Monster 1-piece C-Bridges are pre-drilled and slip right over the factory
frame. The only cutting you will do in the complete rear install is to
remove the original frame after bolting in place
The Front Cross Member is bolted in Position
FRONT OF TRUCK
OTHER SIDE
FRONT OF TRU
After Bolting
Cut This Area Out
TIONS AVAILABLE
ALWAYS BEING MADE)
1982 BLAZER 1997 DAKOTA 1994 DODGE RAM 1987 NISSAN PICKUP
EASE CALL)
FRONT OF TRUCK
General Street Scraper
Instructions
1. Remove truck bed
2. Chalk front tires to ensure truck does not roll.
3. Jack rear of truck up at FRAME RAIL and secure with jack stands. Duplicate on both sides.
4. Secure rear-end with jack stands also.
5. Remove wheels, shocks and coils. When finished rear of truck should be suspended by 4 jack stands with wheels removed.
6. Remove factory trailing arm cross member and trailing arms.
7. Using FRAME SECTION as guide, place FRAME SECTION next to outside of truck frame rail to check for clearances of rivets, tabs, and brackets etc. that will
impede the FRAME SECTION from sliding onto frame rail.
8. Remove and/or relocate any rivets, tabs, brackets etc.
9. Slide FRAME SECTION over frame rail into place, it will be a tight fit and usually will need help with a mallet to knock onto frame rail.
10. Repeat steps 4 through 9 on opposite side.
11. With FRAME SECTION in place mount REAR CROSS MEMBER to top rear of notch next to upper bag placement. Loosely bolt REAR CROSSMEMBER in
place to allow movement.
12. Using holes in FRAME SECTIONS as guides, drill mounting holes in factory frame.
13. Loosely bolt FRONT CROSSMEMBER to front side of FRAME SECTIONS to allow movement.
14. Bolt FRAME SECTIONS to factory frame rail.
15. Remove factory diff cover. Gear oil will drain and should be captured in a drain pan for future reference.
16. Mount DIFFERENTIAL BRACKET with link mount provisions towards front with 2 factory differential gaskets. One between the DIFFERENTIAL BRACKET
and the rear-end & one between the DIFFERENTIAL BRACKET and the
differential cover.
17. Measure amount of gear oil captured from rear-end. Use this measurement to refill the rear-end with the same amount. Use manufacturer recommended weight
of gear oil.
18. Mount UPPER LINK BARS from FRONT CROSSMEMBER to DIFFERENTIAL BRACKET with heims positioned to the rear.
19. Mount AXLE BRACKETS on bottom side of rear end to factory trailing arm pads with shock mounts to the rear.
20. Mount LOWER LINK BARS with heims to rear.
21. Tighten all mounting bolts for frame sections and cross members.
22. Mount LOWER BOTTOM BAG BRACKET & UPPER LOWER BAG BRACKET together on rear end sandwiching the rear end.
Loading...
+ 3 hidden pages