Installation and Quick Start
Guide
HP 8509A/B Lightwave
Polarization Analyzer
ABCDE
art No. 08509-90015
HP P
Printed in USA
October 1994

Notice.
The information contained in this document is sub ject to
change without notice.
Hewlett-Packard makes no warrantyofany kind with
regard to this material, including but not limited to,
the implied warranties of merchantability and tness
for a particular purpose. Hewlett-Packard shall not be
liable for errors contained herein or for incidental or
consequential damages in connection with the furnishing,
material.
this
of
use
erformance,
p
or
c
Copyright Hewlett-P
All Righ
ts Reserv
ackard Compan
ed. Reproduction, adaptation,
y 1992, 1994
or translation without prior written permission is
prohibited, except as
1400 F
ountaingroveP
allowed under the cop
arkway,San
ta Rosa, CA
yrightla
95403,
USA
ws.

Certification
arranty
W
Hewlett-Packard Company certies that this product
met its published specications at the time of shipment
from the factory. Hewlett-Packard further certies
that its calibration measurements are traceable to the
United States National Institute of Standards and
Technology, to the extent allowed by the Institute's
calibration facility, and to the calibration facilities of
other International Standards Organization members.
Hewlett-P
This
against
of
perio
either
defectiv
or
F
e
b
defects
ear
y
one
Hewlett-P
d,
repair
e.
arran
w
returned
Hewlett-P
Hewlett-P
harges
c
shall
to
pay
ard
k
ac
material
in
date of
from
ac
replace
or
service
y
t
service
a
to
Buy
ard.
ack
and
ard
k
ac
return
the
all shipping
instrumen
shipment.
Compan
ard
k
pro
repair,
or
facility
shall
er
Hewlett-P
duct
pro
charges,
t
w
and
ducts
this
designated b
prepa
ac
to
duties, and
orkmanship
During
its
at
will,
y
v
pro
h
whic
duct
pro
shipping
y
shall
ard
k
Buyer.
How
taxes
the
e
m
y
pa
for
to
ever,
p
a
arran
w
option,
e
b
ust
harges
c
shipping
y
Buyer
for
erio
ted
arran
w
is
duct
pro
products returned to Hewlett-Packard from another
country.
d
y
t
to
Hewlett-Packard warrants that its software and
rmware designated by Hewlett-Packard for use
programming
instrumen
an
with
instructions
Hewlett-P
of the
instrument, or softw
ac
when
ard
k
t
prop
do
will
es
execute
erly
not
its
installed on
that the
t
arran
w
are, or rm
instrumen
that
op
ware will be
uninterrupted or error-free.
t.
eration
iii

Limitation of Warranty
The foregoing warranty shall not apply to defects
resulting from improp er or inadequate maintenance
by Buyer, Buyer-supplied software or interfacing,
unauthorized modication or misuse, operation outside
of the environmental specications for the product, or
improper site preparation or maintenance.
NO OTHER WARRANTY IS EXPRESSED OR
IMPLIED. HEWLETT-PACKARD SPECIFICALLY
DISCLAIMS THE IMPLIED WARRANTIES OF
OR A
CHANT
MER
ARTICULAR
P
ABILITY
PURPOSE.
AND
FITNESS
F
Assistance
clusive
Ex
THE
BUYER'S
HEWLETT-P
OR
F
INCIDENT
WHETHER
ANY
Remedies
REMEDIES
SOLE
PR
AND
CKARD
A
ANY DIRECT,
OR
AL,
BASED
OTHER
LEGAL
VIDED
O
EX
SHALL
INDIRECT,
HEREIN
CLUSIVE
NOT
SPECIAL,
REMEDIES.
CONSEQUENTIAL
CONTRA
ON
THEOR
CT,
Y.
ARE
BE
D
TOR
LIABLE
GES,
AMA
OR
T,
Product maintenance agreements and other customer
assistance agreements are available for Hew lett-Packard
products.
For any assistance, contact your nearest Hew lett-Packard
e.
Sales
and
Service
Oc
iv

Safety Notes
The following safety notes are used throughout this
manual. Familiarize yourself with each of the notes and
its meaning before operating this instrument.
Caution
arning
W
Caution denotes a hazard. It calls attention to a
procedure that, if not correctly p erformed or adhered
to, would result in damage to or destruction of the
instrument. Do not proceed beyond a caution sign until
the indicated conditions are fully understood and met.
a
arning
W
procedure
could
to,
a
ond
bey
understood
fully
pro
The
duct
L
The
necessary
documen
\CE" The
ean
Europ
the
when
denotes
which,
result
arning note
w
instruction
is
the
for
tation.
CE mark
Comm
design
a
if
injury
in
and
mark
user
unit
as
w
calls
hazard.
not
It
correctly
loss
or
until the
of
indicated
met.
cumen
do
with
ed
refer
to
registered trademark
is a
(If
.
y
en.)
v
pro
tation
this
to
accompanied
attention
performed
life.
b
sym
the instructions
to
or
not
Do
conditions
b
sym
when
ol
a
y
b
adhered
proceed
ol.
it
of
ear,
y
are
is
in the
the
it
is
\ISM1-A" This is a symbol of an Industrial Scientic
and Medical Group 1 Class A pro duct.
\CSA" The CSA mark is a registered trademark of the
ciation.
Canadian
Standards
Asso
v

General Safety Considerations
Warning
arning
W
Caution
This is a Safety Class I product (provided with a
protective earthing ground incorporated in the power
cord). The mains plug shall only be inserted in a socket
outlet provided with a protective earth contact. Any
interruption of the protective conductor, inside or outside
the instrument, is likelytomake the instrument dangerous.
Intentional interruption is prohibited.
that
of
to
not
the
the
operator
No
qualified
eco
v
remo
Before
oltage
v
line
er
w
o
p
serviceable
personnel.
vers.
hing
switc
selector
supply
and
parts
prev
o
T
this instrumen
on
h
switc
correct
the
ent
is
inside.
set
fuse
Refer
electrical
mak
t,
the
to
installed.
is
servicing
shock, do
sure
e
oltage
v
vi

How to Use This Guide
This guide uses the following conventions:
Documentation
4
5
Button
NNNNNNNNNNNNNNNNNNNNNNNNNNNNN
Menu Item
Description
man
This
w
t
ligh
eration
op
incurred
erating
op
op
The
indicator. Users
fail
MS Windo
product.
Microsoft, MS, MS-DOS, and the Microsoft logo are
registered trademarks, and Windows is a trademark, of
Microsoft Corp oration.
ual
ve
a
during
eration
This represents a button or key that
may be selected in the HP 8509 user
interface on the Vectra Displa y.
This indicates a menu item in the
HP 8509 user interface main menuor
us.
men
pull-do
vides
pro
olarization
p
erication
v
shipmen
erly
prop
erication
v
eration
op
ws
wn
information
and
and
that
that
analyzer
ensure
to
t,
.
fully
a
is
should familiarize
con
and
installing
on
w
ho
damage
no
our
y
automated pass
themselves
tions
en
v
erform
p
to
analyzer
efore
b
our
y
as
w
is
with
using
an
or
this
vii


Contents
1. Introduction
2. Installation
T
Installation
Unpac
o
P
Stac
o
P
Op
3.
Op
Required
Preliminary
Adjust
Setup Y
needed
ols
o
and Insp
k
Requiremen
er
w
and
k
Up
er
w
eration
eration
the
er
w
o
P
our Source
.
erview
v
o
ect the
Connect
System
the
erication
V
erication
V
Equipmen
Steps
Laser
. .
.
ts
.
Fib
. .
the
.
er
. .
.
System
.
.
System
. .
.
for
. .
t
.
.
or
F
. .
.
.
.
.
.
.
8509A
HP
.
.
.
Maxim
. .
.
.
. .
.
.
.
.
.
.
.
.
.
.
.
.
.
um
.
.
. .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
.
.
.
.
Operation Verication . . . . . . . . . 3-6
Operation Verication for HP 8509B
(With Internal Optical Source) . . . 3-8
Required Equipment . . . . . . . . 3-8
Preliminary Steps . . . . . . . . . . . 3-9
erication
eration
Op
eration
Op
(Without In
V
erication
V
ternal Source)
Required Equipmen
Preliminary Steps
Setup Y
Adjust F
our Source
Maximum P
or
. .
8509B
HP
for
. . . . . 3-12
t . . . . . . . . 3-12
. . . . . . . . . . . 3-13
. . . . . . . . . . 3-14
ower .
. . . . . 3-15
.
.
.
.
.
.
Operation Verication . . . . . . . . . 3-16
2-1
. 2-1
2-3
.
2-4
.
2-6
.
2-8
.
3-2
.
3-2
.
3-3
.
3-4
.
3-5
.
3-10
.
Contents-1

4. If Things Go Wrong
Problems requiring additional resources . 4-1
The system app ears to be dead . . . . . 4-2
If the computer does not resp ond . . . . 4-3
If you get the \EEprom not formatted or
Box on?" error message . . . . . . 4-4
If operation verication fails . . . . . . 4-5
DOP measurement is out of specication 4-5
Power displayreads
To return for service . . . . . . . . . 4-7
underrange
. . . 4-6
Contents-2

Figures
1-1. HP 8509B System . . . . . . . . . 1-2
1-2. The HP 8509 User Interface Basic
Measurement Screen . . . . . . . 1-3
. 2-2
. .
.
.
.
.
.
.
.
.
t
. .
.
.
.
.
.
.
Screen .
.
w
.
w
. .
.
.
w
.
.
.
w
Screen
w.
.
.
.
.
.
.
.
.
. .
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
.
3-10
.
3-13
.
3-14
.
3-15
.
. 3-16
2-1.
2-2. V
2-3.
3-1.
3-2.
3-3.
3-4.
3-5.
3-6.
3-7.
3-8.
3-9.
3-10.
Needed
Items
oltage Selector
System
HP
HP
Optical
Op
Equipmen
Op
Equipmen
Optical
HP
Op
Connections
8509A
8509
Source
eration
eration
Source
8509
eration
Equipmen
Basic
V
t
Verication
t
Basic
V
Installation
for
. .
Measurement
Setup
erication
Setup
Setup
.
.
Setup
Measuremen
erication
.
.
.
Setup
t
Windo
Windo
.
.
Windo
.
.
Windo
Windo
2-5
2-7
3-3
3-4
3-5
3-6
3-9
Tables
.
.
.
.
uses
F
2-1.
Recommended
3-1.
3-2. Recommended P
3-3. Recommended P
4-1. Hewlett-P
ackard Sales and Service
Oces . . . .
.
.
. .
.
.
.
.
.
.
.
hcords
atc
P
atchcords .
atchcords
. .
. . . . . 3-8
. . . . . . 3-12
. . . . . . . . . 4-8
.
.
.
.
Contents-3
2-4
3-2


Introduction
For the quickest installation of your HP 8509 system,
use the
HP 8509A/B Instal lation Quick ReferenceCard
that came attached to the top cover of your lightwave
polarization
Chapter
analyzer.
Intro
1,
duction
1
1
Note
t
HP
is
Figure
8509
orking
w
Figure
sho
in
Chapter
Pro
1-1
ws the
terface.
2,
vides
Chapter 3,
erform
P
our system
y
properly
the
.
ws
sho
measuremen
basic
Installation
detailed
Operation
eration
op
erify that
to v
ypical HP
t
a
installation
erication
V
erication
v
8509B system.
screen
t
instructions.
after
instrumen
your
the
of
installing
Chapter 4, If Things Go Wrong
If you encounter obstacles or diculties, check this
section for possible solutions.
MS
an
user
8509
HP
The
ou
ws
con
Y
en
v
application.
Windo
product. Refer to
terface
in
should
tions
the Microsoft Windo
is
familiarize
op
and
eration
for information on using MS Windo
Windo
yourself
b
ws.
ws
with
using this
efore
ws
User's Guide
1-2
user
Introduction
1-1

1
1-2
Figure 1-1. HP 8509B System
Introduction

1
Figure
1-2. The
HP 8509
User Interface
Basic Measurement
Introduction
Screen
1-3

Installation
2
2
The lightwave p olarization analyzer system is
precongured at the factory and installation requires
minimal time to complete.
ools
T
Installation
needed
erview
v
o
ols
to
ecial
sp
No
8509 system.
HP
the
secure
to
used
e
b
cables.
installation
The
system,
them
correctly
on.
After installation
erformed
p
is
prop
erly
to
.
required
are
A small
monitor
the
consists
connecting
is complete,
that
erify
v
for the
at-blade
and
unpacking
of
them,
op
the
basic installation
screwdriv
analyzer
the
then turning
and
eration
system
v
is
terconnect
in
pieces
erication
erating
op
of
er
ma
the
of
y
Installation
2-1

2
2-2
Installation
Figure
2-1. Items
Needed for
Installation

Unpack and Inspect the System
1. Unpack the lightwave polarization analyzer system
from its shipping containers. Inspect it thoroughly to
ensure that it was not damaged during shipment. If
anycontainer or piece of the system is damaged or
incomplete, save the packing materials and notify
both the carrier and Hewlett-Packard.
2. Refer to Figure 2-1. Gather the items shown, and put
all other hardware, do cumentation, and software aside
w.
no
for
v
a
w
t
ligh
Note
The
8509B
HP
panel
t
fron
OPTICAL
The
.
con
INPUT
olarization
p
e
HP
tains
analyzer
line
a
diers
8509A
only
connector.
po
in
wer
in
app
switc
Figure
earance.
h
2-1
and
is
Its
an
2
an
Installation
2-3

2
Power Requirements
Available ac Voltage Voltage Range Fuse Type
The power requirements include line frequency in the
range of 47 to 66 Hz, and 200 VA maximum. Other
power requirements for the lightwave p olarization
analyzer are listed in Table 2-1.
Table 2-1. Fuses
100
120
220
240
Note
V
V
V
V
On
line-v
o
p
on
If
to
to
90
to
108
to
198
to
216
the
oltage
er
w
the
need
ou
y
Figure
110
132
242
250
ligh
source
rear
2-2
rms
V
rms
V
Vrms
e
v
a
w
t
selector
used.
panel of
hange
c
to
and
2.00
2.00
1.00
1.00
olarization
p
the
to
line
The
the p
the
small at-blade
use a
olarization
switc
A
A
A
A
analyzer,
oltage
v
oltage
v
(HP
F
(HP
F
(HP
F
(HP p.n.
F
corresp
setting
h
rms
V
2110-0002)
p.n.
2110-0002)
p.n.
2110-0001)
p.n.
2110-0001)
the
set
onding
selector is
analyzer.
or the
screwdriver
the
to
cated
lo
fuse, refer
to
pry open the line mo dule cover door.
2-4
Installation

2
Figure
2-2.
oltage
V
Selector
Installation
2-5

2
Stack and Connect the System
1. Set the lightwave polarization analyzer on your work
Note
Do
ligh
2.
surface. Place the p ersonal computer next to the
lighwave p olarization analyzer, place the monitor on
top of the personal computer. Place the keyboard in
front of the computer and place the mouse to the side
of the system. Refer to Figure 1-1 for an example of
how to stackyour system.
k
stac
NOT
olarization analyzer.
ep
v
a
w
t
Connect the
Connect
a.
ersonal
p
computer
the
system as
t
ligh
the
computer
w
sho
e
v
a
using
monitor
or
in
wn
olarization
p
the
on
Figure
analyzer
dedicated
2-3
.
terface
in
to
the
the
of
top
cable.
2-3
to
for
b. Connect
ersonal
p
the
cations
lo
ten
Tigh
c.
screwdriv
monitor,
the
computer.
orts.
p
of
connections
er.
eyb
k
Refer
with a
mouse
and
oard,
Figure
to
small at-blade
2-6
Installation

2
Figure 2-3.
System Connections
Installation
2-7

2
Power Up the System
8509B
HP
1. Connect the three power cords (one eachfromthe
computer, the monitor and the analyzer) to the line
voltage.
2. Press the front-panel power switches on the analyzer,
computer,and monitor.
3. After the computer is turned on, Microsoft Windows
and the HP 8509 software are automatically loaded.
Screen
mec
is
message
executed.
eing
t
hanical
in
After
should
should
It
will hear
ou
Y
olarizer
p
erformed.
p
w
o
p
the
out
ab
app
lo
initialized;
is
Y
displa
er
45
on
ear
similar
ok
a series
will
ou
while
y
seconds
the
of
then
notice
Basic
the
computer
Figure
to
as
ks
clic
the
green
a
this pro
Measuremen
displa
1-2
in
the
zeroing
zeroing
cedure
.
y
.
ternal
routine
b
is
2-8
HP
Installation
8509A
co
runs
ver
your
When
zeroing
the
When
OPTICAL
the
the
ou
y
w
soft
routine.
instructed
are
INPUT
are
initialized,
has
p
to
ort.
blo
Use a
automatically
it
external
k
c
connector cap,
laser,
nger, or a piece of dark pap er. Do not allowanything
to touch the b er end.
When you are instructed to clear the external laser,
uncover the OPTICAL INPUT port and proceed.
4.
erform
P
ligh
ensure
to
w
is w
no
orking
prop
erication
the op
e
v
a
w
t
eration
olarization
p
v
analyzer
the
erly
.

3
Operation Verification
The correct operation verication depends on your
instrument and options. Use the table belowto
determine the correct operation verication to use for
our
y
del
Mo
8509A
HP
8509B
HP
ternal
in
with
source
particular
instrumen
anel
P
t
ron
F
3
t.
o
T
Go
3-2
age
P
3-8
age
P
8509B/
HP
(Option
210, 220)
without
internal
source
Operation
age
P
erification
V
3-12
3-1

Operation Verification for HP 8509A
Perform the operation verication when you rst receive
and install your lightwave polarization analyzer, and
thereafter on a regular basis. It veries that your
3
analyzer is working prop erly.
Required Equipment
The following items are needed to perform the operation
verication:
Optical source of known wavelength (between 1200
olarization.
olarized
p
routing
er optic
um
n
atchcords
P
er
p
the
Refer
er.
b
HP
source
tfrom
ligh
olarizer.)
p
to
hcord
atc
P
art Num
P
e
b
and 1600
(HP
used.
our
y
bulk
A
High-qualit
able
T
Connector
nm) with
recommends
can
This
or
3-1
T
T
able
ype
through
er
b
single mo
y
recommended
for
3-1.
Connector
source
known
highly
a
that
ed
hiev
ac
e
b
bulk
a
olarizer.
p
optic
patc
de
Recommended
Option
degree of
y
b
or b
hcord.
part
Numb
HMS-10HP 011 08703-80003
FC/PC 012 1005-0136
DIN 47256 013 1005-0144
ST 014 1005-0135
Biconic 015 1005-0134
ber
3-2
Operation
erification
V

Preliminary Steps
1. Turn on the lightwave polarization analyzer and allow
it to warm up for at least one hour.
2.
Zero the analyzer by selecting
NNNNNNNNNNNNNN
Zero
. When you are instructed to blo ck external
NNNNNNNNNNNNNNNNNNNN
System
and then
laser, cover the OPTICAL INPUT port. Use a
connector cap, your nger, or a piece of dark paper.
Do not allowanything to touch the ber end.
3
Note
3. Proceed by selecting
4OK5
, and then when instructed
to clear external laser, uncover the OPTICAL INPUT
and
ort
p
the zeroing
After
read
will
et
y
not
is
connected
w
po
Clean
3-1
er
Figure
a
4.
isoprop
e
Car
Connect the
5.
select
Underrange
detecting
a
the
,
measuremen
all
yl
hapter
c
4
routine is
source
underrange
optical
alcohol
in
equipment
.
5
OK
This just
.
optical
y
an
OPTICAL
the
to
t.
connectors
Q-tips.
and
our
User's/R
y
as
nished,
means
o
p
message
and
Refer
eferenc
wn
sho
the
er.
w
INPUT,
will
adapters
to
in
er
w
o
p
the
that
Once
e replaced
b
using
the
Guide
e
Figure
displa
receiv
ou
y
in
as
Conne
.
3-1
ha
.
y
e
v
with
ctor
er
Figure 3-1. HP 8509A Equipment Setup
erification
Operation
V
3-3

Adjust the Laser Fiber For Maximum Power
1. Adjust the laser ber in front of the polarizer (see
Figure 3-1) by grasping the middle of the ber
3
and slowly moving it to several positions to obtain
maximum power into the receiver. Observe the power
display (see Figure 3-2) while moving the ber to
monitor power.
2. When maximum power is achieved, stabilize the ber
by taping it to the work surface or by using some
other
reliable
metho
d.
3-4
Operation
erification
V
Figure
3-2.
HP
8509
Measurement Screen
Basic

Setup Your Source
Note
1. Select
45
. The optical source setup windowwill
appear on the display. (See Figure 3-3).
N
N
the
NN
NN
(to
N
N
N
N
Source
nm
1
oard.
eyb
k
ard
k
ac
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
Source
N
N
NN
NN
N
N
N
N
N
N
N
N
N
N
8168A/HP-IB
HP
accuracy)
N
NN
NN
N
N
N
N
Input
2.
optical
ou
y
If
8168A
HP
down
drop
mouse
are
p
Figure
the
source
using
,
men
oin
a
w
select
ter.
3-3.
elength
v
using
Hewlett-P
a
the
and
u
Optical
N
N
Optical
select
Setup
source
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
w
Windo
our
y
of
as
h
suc
N
N
N
N
N
N
Selection
NN
NN
N
N
N
N
N
N
N
N
N
N
N
N
N
NN
NN
N
N
N
N
N
N
N
with
N
N
N
the
N
N
N
y
3
our
3. Select
4
5
with your mouse pointer.
Done
Operation
erification
V
3-5

Operation Verification
The operation verication pro cedure is a fully automatic
pass/fail indicator of your systems p erformance.
3
1. Make sure that the optical cable connecting the
polarizer to the lightwave polarization analyzer's
OPTICAL INPUT is stable. This can be
accomplished by taping the cable to the work surface
if necessary.
2.
Select
select
NNNNNNNNNNNNNNNNNNNN
System
N
N
N
N
N
N
N
from
N
N
N
N
N
N
N
NN
NN
NN
NN
N
N
N
N
N
N
NN
NN
NN
NN
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
windo
main
the
Operation Verification
then
,
y
displa
w
N
NN
NN
N
N
.
3-6
Operation
erification
V
Figure 3-4. Operation Verification Window

3. Select
nished, the message
passed
and the Max, Min, and Mean DOP values will b e
displayed.
4
5
. When the verication pro cedure is
Start
Operation Verification
will be displayed in the message window,
4. The op eration verication is now complete. You may
select
4
5
to clear the window and begin your
Done
measurement.
3
Operation
erification
V
3-7

Operation Verification for HP 8509B
(With Internal Optical Source)
The operation verication is designed to be performed
when you rst receive and install your lightwave
3
polarization analyzer and thereafter on a regular basis.
If performed successfully, it will giveyou a high degree of
condence that your analyzer is working properly.
Required
Note
Equipment
The actual wavelength of your internal source is
probably
1550
and
setup windo
measuremen
of
alue
v
follo
The
erication:
v
High-qualit
able
T
Connector
dieren
nm
wand
t
our
y
wing
for
3-2
able
T
ype
T
from
t
in
used
the w
screen
ternal
in
items
single mo
y
recommended
the
Recommended
3-2.
Connector
this
will
source
are
nominal
the
pro
elength
av
reect
needed
patc
de
Option
cedure. The
to
v
displa
actual
the
nearest
the
erform the
p
to
hcord.
part
Patchcords
er
Numb
optical source
the
in
y
measured
nm.
op
to
Refer
er.
b
um
n
atc
P
basic
eration
hcord
nm
1310
of
alues
HP Part Number
HMS-10HP 011 08703-80003
FC/PC 012 1005-0136
47256
DIN
013 1005-0144
ST 014 1005-0135
3-8
Operation
erification
V
Biconic 015 1005-0134

Preliminary Steps
Note
1. Turn on the lightwave polarization analyzer and allow
it to warm up for at least one hour.
2. Clean all optical connectors and adapters using
isopropyl alcohol and cotton swabs. Refer to the
Connector Care
Guide
.
chapter in the
User's/Reference
3. Connect the equipment as shown in Figure 3-5 .
4.
Zero the analyzer by selecting
then
and
,
y
displa
w
windo
green
the
when
zero
analyzer
ou will
Y
er
w
o
p
message
notice a
displa
disapp
y
while
ears
the
NNNNNNNNNNNNNNNNNNNN
System
NNNNNNNNNNNNNN
.
Zero
message
is
zeroing
will
zeroing.
routine
from the main
the
in
ear
app
zero
The
nished.
is
3
Figure 3-5. Equipment Setup
Operation
erification
V
3-9

Operation Verification
The operation verication pro cedure is a fully automatic
pass/fail indicator of your system's performance.
3
1. Make sure that the optical cable connecting the
polarizer to the lightwave polarization analyzer's
OPTICAL INPUT is stable. This can be
accomplished by taping the cable to the work surface
if necessary.
2.
Select
select
NNNNNNNNNNNNNNNNNNNN
System
N
N
N
N
N
N
N
from
N
N
N
N
N
N
N
NN
NN
NN
NN
N
N
N
N
N
N
NN
NN
NN
NN
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
windo
main
the
Operation Verification
then
,
y
displa
w
N
NN
NN
N
N
.
3-10
Operation
erification
V
Figure 3-6. Operation Verification Window

3. Select
nished, the message
passed
the Max, Min, and Mean DOP values and polarizer
angles (not shown in gure) will be displayed.
4
5
. When the verication pro cedure is
Start
Operation Verification
will be displayed in the message window, and
Note
4. The op eration verication is now complete. You may
select
4
5
to clear the window and begin your
Done
measurement.
If your instrument has more than one source, p erform
this procedure on each source.
3
Operation
erification
V
3-11

Operation Verification for HP 8509B (Without Internal Source)
The operation verication is designed to be performed
when you rst receive and install your HP 8509B/Option
210, 220 lightwave polarization analyzer and thereafter
3
on a regular basis. If performed successfully, it will give
you a high degree of condence that your analyzer is
working properly.
Required Equipment
The following items are needed to perform the operation
verication:
Optical
follo
et
b
et
b
High-qualit
able
T
Connector
wing
een
w
een
w
3-3
T
T
source
ranges.
1280
1470
single mo
y
recommended
for
3-3.
able
ype
Connector
w
wn
kno
of
1340 nm
and
1580
and
patc
de
Recommended
Option
elength
v
a
nm.
part
hcords.
Numb
in
Refer
er.
b
um
n
atchcords
P
er
HP
to
hcord
atc
P
art Num
P
t
the
of
one
HMS-10HP 011 08703-80003
FC/PC 012 1005-0136
DIN 47256 013 1005-0144
ST 014 1005-0135
Biconic 015 1005-0134
w
ber
o
3-12
Operation
erification
V

Preliminary Steps
1. Turn on the lightwave polarization analyzer and allow
it to warm up for at least one hour.
2. Clean all optical connectors and adapters using
isopropyl alcohol and Q-tips. Refer to the \Connector
Care" chapter in the
User's/ReferenceGuide
.
3. Ensure that the optical cable connecting the
external source to the lightwave polarization
analyzer's OPTICAL INPUT is stable. This can b e
accomplished by taping the cable to the work surface
the
N
.Y
in
.
equipment
analyzer
ou will
P
the
by
notice
er
ow
as sho
selecting
green
the
y
displa
wn
N
N
N
N
System
while
b
N
N
N
N
N
N
zero
elo
N
N
N
N
the
NN
N
N
w.
NN
and
message
analyzer
then
will
is
necessary
if
Connect the
4.
5.
Zero
N
N
N
N
N
N
N
N
N
N
N
N
Zero
ear
app
N
zeroing.
3
Figure 3-7. Equipment Setup
erification
Operation
V
3-13

Setup Your Source
3
1. Select
45
. The optical source setup window will
appear on the display. (See Figure 3-8 ).
Select
2.
N
NN
N
Optical
Input
3.
accuracy
Select
4.
disapp
Optical
our
NN
N
N
N
N
N
N
N
Source
w
of
3-8.
source
N
N
N
N
N
N
N
N
N
N
elength
v
a
1
6
The
.
5
yp
t
N
N
N
N
N
N
N
N
N
N
N
N
Selection
nm)
optical
Figure
y
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
the
4
Done
ear.
e
N
N
N
N
N
N
NN
N
of
using
Source
from
N
N
N
N
N
N
N
N
our
y
the
source
N
N
N
N
N
N
the
N
men
optical
eyb
k
Setup
u.
oard.
setup
Windo
source
windo
(to
w
w
an
will
3-14
Operation
erification
V

Adjust For Maximum Power
1. Adjust the two large External Source Polarization
knobs to obtain maximum p ower into the receiver.
Observethepower display while turning the knobs to
monitor power.
3
Figure 3-9. HP 8509 Basic Measurement Screen
erification
Operation
V
3-15

Operation Verification
The operation verication pro cedure is a fully automatic
pass/fail indicator of your system's performance.
3
1. Make sure that the optical cable connecting the
polarizer to the lightwave polarization analyzer's
OPTICAL INPUT is stable. This can be
accomplished by taping the cable to the work surface
if necessary.
2.
Select
select
NNNNNNNNNNNNNNNNNNNN
System
N
N
N
N
N
N
N
from
N
N
N
N
N
N
N
NN
NN
NN
NN
N
N
N
N
N
N
NN
NN
NN
NN
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
N
windo
main
the
Operation Verification
then
,
y
displa
w
N
NN
NN
N
N
.
3-16
Operation
erification
V
Figure 3-10. Operation Verification Window

3. Select
nished, the message
passed
the Max, Min, and Mean DOP values and polarizer
angles (not shown in gure) will be displayed.
4
5
. When the verication pro cedure is
Start
Operation Verification
will be displayed in the message window, and
4. The op eration verication is now complete. You may
select
4
5
to clear the window and begin your
Done
measurement.
3
Operation
erification
V
3-17


If Things Go Wrong
This chapter will help correct problems that maybe
encountered while performing the installation and
operation verication. The problem or symptom is
listed
brief description
information
hec
c
the
problem.
at
klist
hec
c
the
of
klist
each
of
top
or explanation
regarding
that
items
ossible solutions
of p
page. Most
problem.
the
cause
could
problems ha
to pro
ollo
F
the
will
additional
vide
wing
problems.
to
help
ve
a
is
Using
correct
4
4
a
the
Problems requiring
additional resources
Problems
analyzer
tact
Con
are
that
require
will
Hewlett-P
a
ternal
in
ac
to
additional
sales or
kard
hnical
tec
service oce
information.
olarization
p
e
v
a
w
t
ligh
the
cannot solveyour problem with the information in this
chapter. Sales and service oce locations are listed on
the last page of this chapter. Instructions for returning
your instrument to Hewlett-Packard are provided at the
hapter.
c
this
of
end
Wrong
Things
If
Go
ou
y
if
4-1

The system appears to be dead
When the computer, monitor and lightwave p olarization
analyzer are initially turned on, the following
observations can be made:
1. The computer's fan and disk drive will make a certain
amount of noise when the computer is turned on.
2. The monitor has an indicator light on the power
button that should light up when the monitor is
4
turned on.
3. If
in
these
If
conditions:
Chec
connected
Chec
the
oltage for
v
Chapter
Chec
analyzer
is lo cated inside the power-cord receptacle housing
on the rear panel of the analyzer. See Table 2-1
in Chapter 2 for replacementpartnumbers. See
Figure 2-2 in Chapter 2 for exact location of fuse.
the
ternal
things
k
k
HP
k
ligh
source,
that
the
8509
2
the
to
olarization
p
e
v
a
w
t
LED
an
ccur,
o
not
do
computer, monitor
the
o
p
ac
the
to
oltage
v
line
ensure
to
source.
er
w
o
the p
instructions
for
on
fuse
line
ensure
that it
will
hec
c
source.
er
w
selector
it
that
on
ligh
the
is not
lit
the
on
follo
has
the
analyzer
e
b
k
and
on
h
switc
Figure
ep
av
the
the
olarization
set to
is
See
setting
w
t
damaged. The
least
at
fron
wing
analyzer
rear
the
correct
in
2-2
switc
one
t panel.
are
of
h.
fuse
all
4-2
Things
If
Go
Wrong

If the computer does not respond
The mouse and keyboard cable connectors look the same
and therefore may accidentally be interchanged on the
back of the computer. If this happens, the computer will
not respond to the mouse or the keyboard, and you may
hear lots of b eeping when trying to use one or the other.
If you haveany of these problems check the following:
Make sure that the mouse and keyboard are plugged
correct
the
to
in
icons
There
mouse and
the
of
are
correct
mouse
keyb
so
and
c
k
et.
k
eyb
ets
k
c
so
on the
oard
(See
oard
bac
the
on
computer rear
connectors
Figure
orts.)
p
2-3
k
to
the
of
panel and
y
help
exact
for
computer.
determine
ou
cation
lo
4
on the
e
Mak
plugged
eing
b
sure
in
made.
that
all
the
the mouse
and
y
a
w
and
that
k
eyb
a
go
oard
o
cables
connection
d
are
is
Things
If
Go
Wrong
4-3

If you get the \EEprom not formatted or Box on?" error
message
When you start up the software, the program expects
the lightwave p olarization analyzer to be turned on
connected to the computer via the dedicated interface
cable. This error message occurs when it appears to the
computer that the lightwave p olarization analyzer is not
connected or turned on.
and
4
If you see the error message, check the following
conditions:
oltage
ac
that
switc
o
p
Ensure
selector
the
turned on.
oltage
v
the
Ensure
that
connected
computer.
the
and
on the
connectors.
the
is
h
er source,
w
(See
selector
the
oth
b
to
v
a
w
t
ligh
erly
prop
and that
Figure
2-2
switc
dedicated
the ligh
sure
Be
olarization
p
e
set,
line
for
h.)
terface
in
v
a
w
t
nger
to
analyzer
connected
is
it
that
h
switc
instructions
cable
olarization
p
e
ten
tigh
has
is
een
b
setting
on
prop
analyzer
the
v
to
erly
screws
4-4
Things
If
Go
Wrong

If operation verification fails
DOP measurement is out of specification
If you are able to detect power after connecting an
optical source to the lightwave polarization analyzer's
OPTICAL INPUT (Look at the power display in the
upper left corner of the measurement screen), but the
DOP measurement is out of specication, there is a go od
chance that dirty or improp erly seated connectors are at
fault.
If y
out
ou are
of
detecting p
ecication,
sp
c
w
o
hec
er
4
are
measuremen
our
y
but
wing:
follo
the
k
ts
1.
2.
3.
Ensure
alcohol
detailed
or
F
b
um
n
HP
the
Ensure
seated
If the
apply
connectors
the
and
refer
ers,
8509A/B
that
nger
and
eration
op
calibration
a
abs
cotton
sw
instructions,
\Connector
the
to
User's/R
the optical
tened.
tigh
erication
v
for
are
clean.
to
and
Use
clean optical
cleaning
Care"
e
enc
efer
connections are
fails,
still
particular
the
isoprop
Guide
p
source
yl
connectors.
supply
hapter
c
.
erly
prop
erform
and
wavelength you are using to make the measurements.
Refer to \Calibration" in the \The System Menu"
section of the
HP 8509 User's/ReferenceGuide
4. If the operation verication still fails, contact
this
in
page
last
the
to
Refer
ard.
for
ack
lo
cations
Hewlett-P
of
ac
kard
Sales
Hewlett-P
section
Service oces.
part
in
and
.
and
Things
If
Go
Wrong
4-5

Power display reads
4
underrange
If, after connecting power to the OPTICAL INPUT the
power displayreads
underrange
, the problem maybe
more severe.
Check the following:
If you are using an external source, ensure that the
source is turned on.
If you have a lightwave polarization analyzer with one
internal source, be sure that the front panel indicator
source
w.
w.)
our
y
setup
setup
or
you
the
(Select
it
If
t
ligh
analyzer with
another
to
windo
windo
ou
y
if
should
repair.
for
4
still
v
a
w
w.
determine that
return
LED is
optical
the
optical
the
on,
come
analyzer
ha
ou
y
If
ternal
in
source
op
to
45
still
are
of
one
a
w
light
on. If
source
source
you
for
a
e
v
sources,
via the
en
not
our
y
olarization
p
e
v
isn't,
it
setup
setup
should return
repair.
v
a
w
t
ligh
switc
try
optical
optical
the
detecting
sources
is dead,
turning
try
windo
windo
olarization
p
e
hing
source
source
er,
w
o
p
analyzer
on
to
5
does
olarization
p
e
internal
(Select
If
w.)
y
via
op
not
y
our
en
t
ou
o
w
4-6
Things
If
Go
Wrong

To return for service
The original shipping containers and materials, or
the equivalent, must be used when repackaging the
components of the HP 8509 lightwave p olarization
analyzer system. Packaging materials identical to the
original factory packaging can be purchased through any
Hewlett-Packard oce.
Caution
Instrument damage can result from using packaging
materials other than the original shipping materials
aging
k
pac
as
ellets
p
yrene
or
do
pro
of
in
use st
adequately
not
from
it
t
en
cedure
information:
required.
problem;
the
termitten
num
shifting
to
t.
er
b
cushion
prepare
state
tec
of
the
in
the
the
if
hnical
the
carton.
instrument
problem
tact
con
or equiv
alent.
materials.
instrumen
follo
the
Use
shipmen
for
Gather
1.
yp
T
a.
Description
b.
constan
c. Name
erson.
p
Return
d.
Never
They
prev
or
t
wing
t:
following
the
service
of
e
t
and phone
address.
e. Full serial numb er of returned instrument.
f. List of any accessories returned with the
instrument.
4
is
Things
If
Go
Wrong
4-7

2. Pack the instrument in the original shipping materials
(or the equivalent).
3. Seal the carton with strong nylon adhesivetape.
4. Mark the carton \FRAGILE, HANDLE WITH
CARE."
5. Retain copies of all shipping papers.
6. Ship to the nearest Hewlett-Packard Sales or Service
oce.
4
OPERA
Northern
ard
k
ac
elyn
View,
ard
k
ac
ark
P
30339
GA
Sales
Co.
CA
Co.
Place
able
T
Headquarters
ard
k
Hewlett-P
19320
Cup
(800)
ac
Pruneridge
ertino,
752-0900
CA
Colorado
ard
k
verness
In
649-5000
oo
ac
d,
Place, East
CO
Hewlett-P
24
Englew
(303)
4-1.
Compan
Aven
95014,
Co.
80112
Hewlett-P
FIELD
US
California,
y Hewlett-P
301
ue
Moun
USA
(415)
Georgia
Hewlett-P
2000
tlan
A
(404)
ackard
Ev
E.
tain
694-2000
South
ta,
955-1500
New Jersey Texas
Hewlett-Packard Co. Hewlett-Packard Co.
150 Green Pond Road 930 E. Campbell Rd.
Rockaway, NJ 07866 Richardson, TX 75081
(201)627-6400 (214) 231-6101
and
TIONS
94041
Service
California,
Hewlett-P
South
1421
ullerton,
F
999-6700
(714)
Illinois
Hewlett-P
ollview
T
5201
Meado
Rolling
255-9800
(708)
Offices
Southern
Co.
ard
k
ac
Manhattan
92631
CA
ard Co.
k
ac
Driv
ws,
e
IL
Av
60008
e.
4-8
Things
If
Go
Wrong

Table 4-1. Hewlett-Packard Sales and Service Offices (continued)
EUROPEAN FIELD OPERATIONS
Headquarters France Germany
Hewlett-Packard S.A. Hewlett-Packard France Hewlett-Packard GmbH
150, Route du Nant-d'Avril 1Avenue Du Canada Hewlett-Packard Strasse
1217 Meyrin 2/Geneva Zone D'Activite De Courtaboeuf 6380 Bad Homburg v.d.H
Switzerland F-91947 Les Ulis Cedex Germany
(41 22) 780.8111 France (49 6172) 16-0
(33 1) 69 82 60 60
Great Britain
Hewlett-Packard Ltd
Eskdale Road, Winnersh Triangle
5DZ
okingham,
W
Berkshire
RF11
England
696622
734)
(44
4
Headquarters
ard
k
Hewlett-P
3495
alo
P
(415)
ac
Creek
Deer
California
Alto,
857-5027
Company
Rd.
94304-1316
INTER
Australia
Hewlett-P
31-41
kburn,
Blac
3)
(61
CON
ac
Joseph
FIELD
ard
k
Street
Victoria
OPERA
Australia
3130
895-2895 Kirkland,
Ltd.
TIONS
Canada
Hewlett-
17500
rans-
T
ac
P
South
Canada
Queb
Canada
697-4232
(514)
China
China Hewlett-P
Huan
San
Bei
38
Sh
uang
u
Sh
u
Y
ack
X1
ard
Road
Co.
Japan Singap
Ltd.
ard
k
oga
ok
Y
1-27-15
Kanaga
a-Hewlett-P
w
e,
ab
Y
229, Japan
wa
ac
Sagamihara 1150
ore
Hewlett-P
Depot
Singapore
ac
0410
Hai Dian District (81 427) 59-1311 (65) 273-7388
Beijing, China
(86 1) 256-6888
Taiwan
Hewlett-Packard Taiwan
an
aiw
T
712-0404
Building
North Road
Flo
8th
F
337
aipei,
T
(886 2)
or, H-P
Hsing
u
ard
k
Service
High
ec
ard
k
Road
(Canada)
Road
y
a
w
2X8
H9J
Singap
Ltd.
(Pte.) Ltd
ore
Things
If
Go
Wrong
4-9