AGFA M4F User Manual

Global Services North America Wilmington MA 01887
:ANAPURNA M4F
AGFA UV INKJET PRINTER
SITE PREPARATION GUIDE
Distribution:
Customer Sales Service Dealer
03/17/10 Revision 5.0
Questions? Contact 800-879-2432 and ask for an Anapurna Specialist
1
Global Services North America Wilmington MA 01887
Table of Contents
Purpose: ---------------------------------------------------------------------- -------------------------------------------------- ---- 3 Scope: ------------------------------------------------------------------------------------------------------------------------------- 3 Major Project Milestones:----------------------------------------------------------------------------------------------------- 3 Dock door and hallway access-----------------------------------------------------------------------------------------------4 System Dimensions and Weight Crated:--------------------------------------------------------------------------------- 4 System Dimensions and Weight Uncrated:----------------------------------------------------------------------------- 4 Forklift Requirements: ---------------------------------------------------------------------------------------------------------4 Foot print with connections:------------------------------------------------------------------------------------------------- 5
Site Requirements
Compressed Air Supply:------------------------------------------------------------------------------------------------------ 6 RIP Software and PC Platform: -------------------------------------------------------------------------------------------­Power Requirements: ---------------------------------------------------------------------------------------------------------- 8 Buck Boost Transformer wiring: ---------------- ---- -- ---- -- ---- -- ---- -- ---- -- ---- -- ---- -- ---- -- ---- -- ---- -- ---- -- --- 10,11 Site Readiness Checklist:--------------------------------------------------------------------------------------------------- 12 Customer Responsibilities: -------------------------------------------------------------------------------------------------13 General Information: --------------------------------------------------------------------------------------------------------- 14 Head Wipes Required: ------------------------------------------------------------------------------------------------------- 14 Environmental Requirements: ---------------------------------------------------------------------------------------------14
7
Questions? Contact 800-879-2432 and ask for an Anapurna Specialist
2
Global Services North America Wilmington MA 01887
Purpose
The purpose of this document is to assist the local service representative, who is responsible for configuring and installing the :Anapurna. This document will help to ensure the site will be ready and the customer is informed of their responsibilities. Please go through all the information provided in this document thoroughly with the customer. Have the customer sign the :Anapurna System Site Check List. You should write down any notes on the Note page of the Site Check List that may be necessary for a successful installation. Make a copy for the customer to keep on site, and one for you.
Scope
This document specifies the site requirements for the :Anapurna System and the preparations needed before the installation. It will be the intent of this document to inform the customer of what the requirements are for the :Anapurna System and inform them of their responsibilities. Together this will help in producing a successful installation.
General
The customer is responsible for the preparation of the site to fulfill the requirements of the :Anapurna System as outlined in this document.
4 Major Project Elements
Dock & building access
Compressed Air Supply
PC Platform & RIP Software
AC Power Requirements
Questions? Contact 800-879-2432 and ask for an Anapurna Specialist
3
Global Services North America Wilmington MA 01887
Dock & building access
System Dimensions and Weights
Dimensions Uncrated Dimensions Crated Weight:
H = 63 Inches (1600 mm) H = 71 Inches (1800 mm) Crated: 3087 lbs (1400 Kg) W = 141 Inches (3570 mm) W = 153 Inches (3800 mm) Uncrated:2165 lbs (980 Kg)
D = 57 Inches (1450 mm) D = 61 Inches (1550 mm)
Accessory Box Width Height Depth Weight
76”
(192 cm)
47 “ (119 cm)
52 “ (133 cm)
595 lbs (270 Kg)
Shipping and Delivery
No Truck Height Loading Dock: Due to the width of the Anapurna M4F (153 inches) it is important that
the freight vehicle delivering the crated engine have a lift gate. This will allow the forklift to pull the crate length-wise to the lift gate and together with the forklift supporting one end, the crate can be lowered to the ground.
With Truck Height Loading Dock: The load dock area must have enough vertical height and space for the forklift to be able to lift the printer off the pallet.
Forklift Requirements 4409 lbs or 2000 Kg or higher capacity to lift the printer crate.
The forklift blades should be at least 60 inches or 1500 mm in length. The distance between the fork lift blades should be 41 inches or 1050 mm apart. Floor Strength and Flatness
The floor must be level with a maximum incline or waviness of +/- 1.3 cm across the footprint. Never install the printer on carpet.

Doors and Hallway Access

The customer must provide free access through doors and hallways from the entrance to the Anapurna location so that the printer can be rolled to its position. It will be the customer’s responsibility to have the system moved to the location of where the Anapurna will be installed. An AGFA Service representative will be present to assist with moving the equipment. Once on its wheels the printer can be rolled to position, make sure to provide ramps as necessary to clear any thresholds.
Minimum Door Way Width: 58 (Inches) or 147.3 (CM) Uncrated ** 62 (Inches) or 157.5 (CM) Crated
to reduce the door way width requirement to 43.3 inches or 1100mm.
** Roll to Roll brackets come preinstalled, they can be removed
Minimum Door Way Height: 7.0 (feet) or 213 (CM) Uncrated
7.0 (feet) or 213 (CM) Crated
Questions? Contact 800-879-2432 and ask for an Anapurna Specialist
4
Global Services North America Wilmington MA 01887
Foot Print and Working Area:
Dock & building access
Power and Air Connection Points:
The power/air connection points are indicated in the diagram above with the letters A, B, and C
A – The power cable entry point lower chassis – near the rear left leveling foot. B – Electrical terminal block location inside the printer, where the power cable connects.
NOTE: The distance between point approximately 9 feet. Note: Add enough cable; wall outlet or electrical drop plus the 9 feet.
A and B or power cable length inside the printer is
C – Air line connection, outside rear right. A 6 mm OD tube is provided with the printer.
* Floor space required for standard tables shown above is: 16.4 feet/5m for Depth 18 feet/5.5 m for width. * The optional extension tables need a floor space of: 16.4 feet/5 m for depth and 28 feet /8.6m for width
Questions? Contact 800-879-2432 and ask for an Anapurna Specialist
5