
2006-03
INTERNATIONAL, INC.
159 PARIS AVENUE • NORTHVALE, NJ 07647 • PHONE 201-768-2400
PROCEDURE FOR ADDING A COMMUNICATIONS BOARD TO
ECS TEMPERATURE CONTROLLER
Parts Needed:
a. Control Box Assembly ECS, P/N: 69012-[ ]
b. Temperature Indicating Controller, P/N: 64008
c. Communications Board, P/N: 64009-[ ]
Procedure:
1. Turn off power to Control Box Assembly ECS (P/N 69012-[ ])
2. Slide out Temperature Indicating Controller (P/N: 64008) from Control Box Assembly
by gently pushing the indicated latching ears to the side (See Figure 1)
LATCHING
EARS
Figure 1
3. Slide Communications Board (P/N 64009-[ ]) into Temperature Indicating Controller
slot (COMMS 1). See Figure 2. Make sure to push Communications Board all the
way in to ensure it is firmly seated in its slot.
COMMUNICATIONS
BOARD
Figure 2
1
May 30, 2006

4. Place Temperature Indicating Controller back into Control Box Assembly and power
up unit. The following screen will appear. (See Figure 3)
Page
Button
Scroll
Button
Figure 3
Up/Down
Arrow Keys
5. The Controller will report a hardware error as indicated on Figure 3. Press the ▲(up)
arrow key located on the right side of the Temperature Controller until “8” appears
on the lower half of the screen.
6. Press the page button located on the left side of the Temperature Indicating
Controller until “Exit” appears on the top half of the screen.
7. Press the ▲ / ▼ (up/down) arrow key to choose “yes”.
8. Wait a moment as the screen updates. The hardware error will no longer be
displayed.
9. This completes installation of the Communications Board.
10. Next, turn off power and proceed to the wiring instructions provided in the next
section.
2

MODBUS COMMUNICATIONS WIRING CONNECTIONS
Following installation of the Communications Board, wiring connections must be made
on the rear of the 2408 Controller to permit Modbus control by an Energy Management
System (EMS), Building Automation System (BAS), or Computer being used with the
Controller. To access the 2408 Controller wiring terminals and make the required wiring
connections, proceed as follows:
1. With the Control Box door open, loosen the captive screw at the top of the recessed
panel shown in Figure 4.
CAPTIVE SCREW
(LOOSEN TO OPEN)
PT.NO.
2408
OP 1
OP 2
F
SET
SP2
REM
AUTO
RUN
MAN HOLD
TEMP CONTROLLER
B-PLUS
OVER TEMP SWITCH
TM
WATER HEATER
PT.NO.
Figure 4
2. Swing down the recessed panel to access the wiring terminal connections on the
rear of the 2408 Controller sleeve (Figure 5).
3. Refer to Table 1 and connect the appropriate wire leads to Temperature Controller
terminals listed.
CAUTION
DO NOT route Modbus communication wiring in the same
conduit as power wiring. Attempting to do so may result in
excessive noise on the signal lines. Also, ensure that the
RS232 or RS485 signal lead connections do not exceed the
following lengths:
• RS232 Wiring: 50 Feet Maximum
• RS485 Wiring: 4,000 Feet Maximum
3

NOTE
AERCO recommends that shielded, twisted-pair cable be
used for communication wiring. Examples of suitable wiring
are : Belden 9841, 8761, 3105A, or equivalent.
Figure 5
Table 1. Modbus Communication Signal Connections
COMPUTER CONTROL CABLE
2408 TEMP. CONTROLLER
SIGNAL
NAME
GROUND HD GROUND 5 7 GROUND
RECEIVE HE TRANSMIT 3 2 A+
TRANSMIT HF RECEIVE 2 3 B-
PIN NO.
RS232/9-PIN RS232/25-PIN RS485
SIGNAL
NAME
PIN NO.
PIN NO.
PIN NO.
4. After the appropriate wire leads have been connected, close and secure the swingdown panel and close the Control Box door. This completes the installation of the
Communications Board.
5. For additional information and documentation on the 2408 Controller, refer to the
Eurotherm Website at the following address:
www.eurotherm.com/products/controllers/2400_doc.htm
4