![](/html/b7/b7ff/b7ffaa412a7938c4c18b082100ceed1dde72c30e3297be073aaa0d687c3e7829/bg1.png)
767
Spezialnähmaschine
Aufstellanleitung
Installation instructions
Instructions d’installation
Instrucciones de instalación
Instruções de montagem
Istruzioni per il montaggio
Postfach 17 03 51, D-33703 Bielefeld • Potsdamer Straße 190, D-33719 Bielefeld
T elefon +49 (0) 5 21 / 9 25- 00 • Telefax +49 (0) 5 21 / 9 25 24 35 • www.duerkopp-adler.com
D
GB
F
E
P
I
Ausg./Edition: 04/2005 Printed in Federal Republic of Germany Teile-Nr.: 0791 767742
![](/html/b7/b7ff/b7ffaa412a7938c4c18b082100ceed1dde72c30e3297be073aaa0d687c3e7829/bg3.png)
Contents page:
Part 2: Cl. 767 Installation instructions
1. Items delivered ................................. 3
2. Setting up
2.1 Erecting the upper part ............................. 5
2.2 Transport..................................... 5
2.3 V-belttension .................................. 5
2.4 Reelstand.................................... 7
2.5 Workingheight.................................. 7
2.6 Kneelever.................................... 7
3. Electrical connection
3.1 Ratedvoltage .................................. 8
3.2 Checkingdirectionofmotorrotation..................... 8
3.3 Checkingpositioning.............................. 9
4. Pneumatic connection ............................ 10
5. Filling with oil
5.1 Regulation of hook lubrication ........................ 12
5.2 Lubricating wicks and felt ........................... 13
6. Sewing test ................................... 14
GB
![](/html/b7/b7ff/b7ffaa412a7938c4c18b082100ceed1dde72c30e3297be073aaa0d687c3e7829/bg5.png)
1. Items supplied
Which items are supplied depends on your order. Please check that all the required
components are present before beginning setting-up work.
–
Basic machine with one or two needles, with or without thread clipper and with or
without edge cutter.
–
frame, drive, reel stand, maintenance unit
–
knee lever, lamp
–
optional equipment
–
pack of minor components
GB
3