Additel ADT 949 Operating Manual

Warningsand cautions
Operate the pump in the rated pressure range of 40,000 psi (2,800 bar) and do not exceed the safety pressure of 44,000 psi (3,080 bar). When the system pressure is greater than 10,000 psi, you must close the pre-pressurization shut off valve(#7)and then pressurize the system with the high pressure handle. Always tighten the gauges using two wrenches . Close all valves and handles and tighten the ports when transporting the pump. Always keep the reservoir cover vent valve(#4)open during operation. Do not over tighten the valves, connectors and handles to avoid damage. Change media immediately if it is contaminated. Keep media level between 1/4 and 3/4 of the liquid reservoir filled. Keep the threads clean and lubricious, and remove any dirt on threads. Used by trained personnel only. Additel is not liable for any safety problems or damages caused by misuse or incorrect operation.
Specification
949
Hydraulic Ultra-High Pressure Test Pump User's Manual
[Version number:1410V04]
Please download the latest version from www.additel.com
Views and Hydraulic Schematic
1- Vent valve
6
2- Over-flow reservoir
1 32
9
Troubleshooting
4
5
8
3- Positional Autoclave F-250-C,
9/16"-18UNF female
4- Reservoir cover vent valve 5- Reservoir 6- Liquid drain valve 7- Pre-pressure shut off valve
(Isolates the calibration volume from the
7
pre-pressure side of the pump)
8- High-pressure and fine adjustment
handle
9- Pre-pressure handle
Pressure range:
12.5 psi ( 0.85 bar ) vacuum to 40,000 psi ( 2,800 bar ) positive pressure
Remark:.If local atmosphere pressure is 1 bar, the vacuum can reach to 0 85 bar;
If local atmosphere pressure is P, the vacuum can reach to bar.( P 85% )
Temperature:
Adjustment resolution:
Safety pressure: Pressure media:
Height: 10.43'' ( 265 mm )
Size:
(5 ~ 50)℃
0.015 psi ( 1 mbar )
< 44,000 psi (3,080 bar)
Diethylhexyl Sebacate
Base: 20.71'' ( 526 mm ) x 9.65'' ( 245 mm )
Weight:
35.5 lb ( 16 kg )
Hydraulic Schematic
5
1
9
8
7
Problem
Vent (#1) is not closed
It is difficult to generate
pressure with the
pre-pressure
handle (#9)
It is difficult to pressurize by
turning the high-pressure
handle handle (#8)
It is difficult to generate
high vacuum
Hard to pressurize
large-volume DUT
Pressure gauges do not
reach to zero
Hard to turn the
valves or handles
O-Rings for pressure connector
1611300220
Pre-pressure shut off valve (#7) is closed
Not enough media is in the reservoir.
Too much air is in the pump
Max pressure generation (could be as low as 5,000 psi, 350 bar) is achieved with the pre-pressure handle (#9)
The pre-pressure shut off valve (#7) is not closed completely
Reference gauge or devices under test (DUTs) are not connected tightly
The connector of the DUT is not matched to connector
Too much air is in the pump
#4 valve is not open
Because of the large volume of the DUT, it will take additional steps to fill the volume to pressurize the DUT
#4 valve is not open
Too much force was previously applied
Hard to turn pre-pressure handle (#9) at high pressure
Lack of lubrication on threads
P/N
Cause
Solution
Close vent valve (#1)
Open pre-pressure shut off valve (#7). Caution: the pre-pressure side of the pump should not be exposed to more than 10,000 psi (700 bar).
Fill more media, and keep media level between 1/4 and 3/4 of the liquid reservoir filled
Purge the air from the system (see Preparation section of the manual)
Close pre-pressure shut off valve and use high-pressure and handle (#8).
Close pre-pressurization shut off valve (#7)
Check finger-tight connectors, re-tight if necessary
Use proper adapter
Purge the air from the system (see Preparation section of the manual)
Open the #4 valve
Step 1: Turn pre-pressure handle (#9) all the way in clockwise, close pre-pressure shut off valve (#7),
open vent valve (#1). Step 2: Turn pre-pressure handle (#9) all the way counterclockwise, close vent valve (#1). Step 3: Open pre-pressure shut off valve (#7), pressurize the system. Step 4: Repeat step 1 to 3.
Open the #4 valve
Do not over tighten
This is normal. Close the pre-pressure shut off valve (#7) and use the high-pressure handle to adjust the pressure.
Lubricate the threads
Size
6.5X3 M20X1.5, 1/2BSP
Connector
Basic Operation
DIGITALPRESSURECALIBRATOR
Units
025
025
③open
b
bar
a
r
A
5
5
0
0
7
7
5
5
1
1
0
0
0
0
DIGITALPRESSURECALIBRATOR
Units
0 25 50 75 100
Note: ① Gauge positions are exchangeable. If only one device under test (DUT) is connected,
the third connector on pump should be closed with a plug.
② Connect the gauges on pump and tighten the connectors using two wrenches.
SW V mA COM 24V
64 96
Pressure GaugePressure Gauge
Bar
32
128
160
DIGITALPRESSURECALIBRATOR
Units
0 25 50 75 100
④a few turns
pressure transmitter
b
bar
a
r
A
32
64 96
Pressure Gauge
Bar
Purge process (cont.)
b
bar
a r
A
Connection
If air is still trapped in the pump, then repeat the purge process 2 or 3 more times until all the gas is removed from the system
Wait for gauge to vent to zero
Bubbles
Always keep valve(#4)
⑤Turn all the way in
dial gauge
C
open during operation
pressure switch
⑤open
③close
②open
SW V mA COM 24V
Zeroing
128
160
32
Always keep valve(#4)
open during operation
A
flexible hose
D
64 96
Pressure GaugePressure Gauge
Bar
128
160
②open
Vacuum displayed
on the gauge
DIGITALPRESSURECALIBR
ATOR
Units
02550751000255075100
③close
DIGITALPRESSURECALIBRATOR
Units
b
bar
a r
A
0255075100
①close
②Pre-pressurizing
Purge pocess
Connection
b
bar
a r
A
Always keep valve(#4)
④Turn all the way out
open during operation
Pressurizing process
Note: Skip step for dial gauge calibration
in a narrow pressure range
64 96
Pressure GaugePressure Gauge
Bar
32
128
160
64 96
Pressure GaugePressure Gauge
Bar
32
④high-pressure
Pressurizing
128
160
B
②open
E
③close
④open
②open
Depressurizing process
DIGITALPRESSURECALIBRATOR
Units
b
bar
a
r
A
0 25 50 75 100
64 96
Pressure GaugePressure Gauge
Bar
32
128
160
③Depressurizing
Back to atmosphere
DIGITALPRESSURECALIBRATOR
Units
b
bar
a
r
A
0 25 50 75 100
①back to atmosphere
0.6 0.4
Pressure Gauge
Bar
0.8
-1
32
①Depressurizing
0.2
0
0.8
64 96
Pressure GaugePressure Gauge
-1
0.6 0.4
Bar
Pressure Gauge
F
DIGITALPRESSURECALIBRATOR
Units
128
160
④open
②open
0 25 50 75 100
②close
Vacuum process
If it is difficult to generate vacuum pressure, then repeat the purging process to make sure all the gas is removed from the system
b
bar
a
r
A
③Fully turn
0.6 0.4
Pressure Gauge
Bar
0.8
0.2
0
-1
G H
DIGITALPRESSURECALIBRATOR
Units
b
bar
a
r
A
0255075100
0.6 0.4
Pressure Gauge
Bar
0.8
0.2
0
-1
①close
②Vacuum
①open
0.6 0.4
Pressure Gauge
Bar
0.8
-1
Vent
0.2
0
0.6 0.4
Pressure Gauge
Bar
0.8
0.2
0
-1
⑤Fully turn
Maintenance
I
Note: Please degas after filling media liquid,
in case hard to generate pressure.
Bar
0.2
0
① Open reservoir cover vent valve (#4)
Fill media Drain and Clean
②Fill media
A
③ Open reservoir cover
vent valve (#4)
④ Unscrew with hex wrench
⑤Remove the
reservoir(#5)
B
①Open drain valve (#6)
②Collect media using a container
Remark:
A Additel has made a concerted effort to provide complete and current information for the proper use of the equipment. The product specifications and other information contained this manual are
subject to change without notice.
B:: Above pictures are just for reference.
Additel Corporation, USA
www.additel.com
Loading...