Zehnder Pumpen FPS-KE Operation Manual

Pumping station
Operation Manual
FPS-KE /
2
Table of contents:
Page
Declaration of conformity ............................................................................... 3
1. General .......................................................................................................... 4
1.1 Scope ..................................................................................................... 4
1.2 Enquiries and orders ............................................................................... 4
1.3 Technical data ........................................................................................ 4
1.4 Range of application ............................................................................... 5
1.5 Scope of supply ...................................................................................... 5
2. Safety ............................................................................................................ 5
2.1 Marking of the notes contained in the operation manual ......................... 5
2.2 Personnel development and training ....................................................... 6
2.3 Dangers in case of non-observance of the safety notes .......................... 6
2.4 Safety-conscious way of working ............................................................ 6
2.5 Safety notes for the operator/user ........................................................... 6
2.6 Safety notes concerning maintenance, inspection, and
assembly works ...................................................................................... 7
2.7 Unauthorised modification of the machine and fabrication of spare parts 7
2.8 Unauthorised modes of operation ........................................................... 7
3. Transport and temporary storage ................................................................... 7
3.1 Transport ................................................................................................ 7
3.2 Temporary storage/conservation ............................................................. 7
4. Description ..................................................................................................... 7
4.1 General ................................................................................................... 7
4.2 Assembly and mode of operation ............................................................ 8
5. Installation ...................................................................................................... 8
5.1 Excavation of the trench ......................................................................... 8
5.2 Insertion of the shaft ............................................................................... 8
5.3 Connection of the shaft ........................................................................... 8
5.4 Filling of the trench .................................................................................. 9
6. Commissioning ............................................................................................ 10
7. Maintenance and repair ............................................................................... 10
8. Malfunctions; causes and elimination ........................................................... 10
9. Guarantee .................................................................................................... 10
10. Technical modifications ................................................................................ 10
Appendix:A main dimensions ........................................................................ 11
Appendix:B installation suggestion for manhole cover class D ...................... 12
3
Declaration of conformity
- for the purpose of the EC low voltage directive 73/23/EWG, Appendix III B
- for the purpose of the EMC directive 92/31/EWG and 93/68/EWG
------------------------------------------------------------------------------------------------------------------­We, the ZEHNDER Pumpen GmbH
Zwönitzer Straße 19 08344 Grünhain-Beierfeld,
herewith declare that the prefabricated pump stations of the type FPS-K (A) conform to the following relevant
regulations:
- EC low voltage directive as amended 93/68/EWG, Appendix I
- EMC directive 92/31/EWG and 93/68/EWG
Applied harmonized standards, particularly:
- EN 292 part 1
- EN 292 part 2
- Draft EN 292 part 2 A1
- EN 60 335-1
- EN 60 335-2-41
- EN 55014/4.93
- EN 55104/95
Applied national technical standards and specifications, particularly:
- DIN EN 292 part 1
- DIN EN 292 part 2
- draft DIN EN 292 part 2 A1
- DIN VDE 0700 part 1
- DIN VDE 0700 part 41
- draft DIN EN 809
Grünhain, 12 January 2004
Matthias Kotte
Product Development
General technical approval Z-42.1.333
4
1. General
1.1 Scope This operating manual is valid for the prefabricated pump station FPS-K (A). If the instructions of the operation manual – especially the safety instructions - are not
observed, or in case of unauthorized modifications of the plant or the installation of non­original spare parts, the guarantee expires automatically. The manufacturer assumes no liability for damages resulting from such behaviour!
Manufacturer: ZEHNDER GmbH
Pumpen und Anlagenbau Zwönitzer Straße 19 08344 Grünhain-Beierfeld
Manufactured sizes: FPS-K (A) shaft fittings for individual or twin plants.
Pumps with a discharge coupling of 2’’ and an output of up to approx. 4 kW can be used.
State of the operation manual: July 2008
1.2 Enquiries and orders
In case of enquiries or orders, address yourself to your specialist retailer.
1.3 Technical data
Clear width: 1000 mm External diameter approx.: 1100 mm
Shaft heights:
Base body height
Height with attachment
piece and BEGU-
manhole cover
class A
Height with attachment
piece and BEGU-
manhole cover
class B
Height with attachment
piece and BEGU-
manhole cover
class D
H2
1600
1730-1960
1775-2005
1810-2040
H3
2100
2230-2460
2275-2505
2310-2540
H5
3100
3230-3460
3275-3505
3310-3540
Opening of the manhole cover: 625 mm Weight: 60 kg - 90 kg (without mounting parts) Inlet: adapted for PVC-KG DN 150 Inlet depth: 675 mm (centre pipe) from bottom edge of shaft bottom Pressure connection: PE HD DN 50 da= 63 mm Depth of pressure connection: 675 mm (centre pipe) from bottom edge of shaft bottom Operating volume: approx. 400 l Ventilation/ductwork for cables: 2 x PVC-KG DN 100 Depth of connection: 1175 mm (centre pipe) from bottom edge of shaft bottom Maximum media temperature: 60°C
The shaft is secured against uplift up to a groundwater level of 1.2m from the bottom edge of the shaft!
Materials
Shaft: Polyethylene Coupling system: Cast iron GG 20 Gate valve: Brass Pressure pipe: Polyethylene Check valve: GG 25
Loading...
+ 9 hidden pages