INSTALLATION
OUTDOOR SPLIT-SYSTEM
INSTRUCTION
TABLE OF CONTENTS
GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . 2
INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
REFERENCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2
CHECK ELECTRICAL POWER SUPPLY . . . . . . . . . 2
SELECTING EQUIPMENT LOCATION . . . . . . . . . . 2
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . 4
OUTDOOR UNIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
INDOOR UNITS . . . . . . . . . . . . . . . . . . . . . . . . . . . .4
REFRIGERANT LINE (SWEAT FIT) . . . . . . . . . . . . .4
INSULATION OF VAPOR LINE . . . . . . . . . . . . . . . . 4
RE-ASSEMBLING, BRAZING AND CLEANING OF
JOINT CONNECTIONS . . . . . . . . . . . . . . . . . . . . . .5
REFRIGERANT LINE SUPPORT . . . . . . . . . . . . . . . 5
CHARGING AND LEAK TESTING . . . . . . . . . . . . . . 5
TOTAL LINE LENGTH . . . . . . . . . . . . . . . . . . . . . . .5
ORIFICE SELECTION (ON SWEAT FIT COILS) . . . 5
REFRIGERANT VALVE OPERATION . . . . . . . . . . . 6
OIL TRAPPING . . . . . . . . . . . . . . . . . . . . . . . . . . . . .6
SYSTEM CHARGE . . . . . . . . . . . . . . . . . . . . . . . 8
MEASUREMENT METHOD . . . . . . . . . . . . . . . . . . . 8
SUPERHEAT CHARGING METHOD . . . . . . . . . . . . 8
CHECKOUT PROCEDURE . . . . . . . . . . . . . . . . . . 10
SYSTEM OPERATION CHECKOUT . . . . . . . . . . . 10
AIR CONDITIONER
MODELS: 10, 12, 13 AND 14 SEER
1 PHASE - 1.5 TO 5 TONS
CAUTION:READ ALL SAFETY GUIDES BEFORE YOU START TO INSTALL YOUR UNIT.
SAVE THIS MANUAL
035-13606-003 Rev. A (202)
Page 2
035-13606-003 Rev. A (202)
GENERAL INFORMATION
These outdoor units are designed to be connected to a matching UPG indoor coil with sweat connection lines. These units are factory charged with refrigerant for a matching indoor coil plus 15 feet of field supplied line. The outside unit is designed to be placed alongside or at the back of the home, remote from the indoor coil. The outdoor unit has been factory run-tested and all components of the system are ready for easy, immediate installation.
INSPECTION
Check the unit thoroughly for shipping damage, Unusually rough handling during shipment may loosen fan motors, com­pressors, or other components. Be sure that the unit is ready to operate before installing it. If there is damage, file a claim with the shipper. See Form 50.15-NM for more information.
REFERENCE
Use this instruction in conjunction with the instructions for the appropriate indoor unit, air moving system and accessories.
Installer should pay particular attention to the words NOTE, CAUTION and WARNING.
NOTES are intended to clarify or make the installation easier.
CAUTIONS identify procedures which, if not followed care-
fully, could result in personal injury, property damage or equipment damage.
WARNINGS are given to alert the installer that severe per­sonal injury, death or equipment damage may result if instal­lation procedures are not followed properly.
LIMITATIONS
The unit should be installed in accordance with all national and local codes and regulations which govern the installation of this type of equipment. In lieu of local codes, the equip­ment should be installed in accordance with National Electric Code, and in accordance with the recommendations made by the National Board of Fire Underwriters.
Limitations for the indoor unit, coil and appropriate accesso­ries must also be observed.
The outdoor unit must not be installed with any duct work in the air stream. The outdoor fan is the propeller type and is not designed to operate against any additional external static pressure.
The maximum and minimum conditions for operation must be observed to assure a system that will give maximum perfor­mance with minimum service.
The manufacturer is not responsible for the per­formance of a mismatched system. The outdoor unit must be installed with a compatible indoor unit as designated in the specification data or in the Directory of Certified Unitary Heat Pumps published by the Air Conditioning and Refrigera­tion Institute. Using unmatched components may not only affect the performance of the system, but may also void the warranty of the equipment.
Do not install any coil in a furnace which is to be operated during the heating season without attaching the refrigerant lines to the coil. Allowing the coil charge to enter the refrigerant lines pre­vents excessive refrigerant pressure build-up and possible coil damage.
Table 1: APPLICATION LIMITATIONS
Ambient Air Temperature
on Outdoor Coil
Min. °DB Max. °DB Min. Max.
50 120 57 72
Air Temperature on
Indoor Coil
CHECK ELECTRICAL POWER SUPPLY
The electrical power should be checked to determine if ade­quate power is available, and near constant voltage can be maintained. If there is any question concerning the power supply, contact the local power company for corrections; oth­erwise, unsatisfactory performance may result.
SELECTING EQUIPMENT LOCATION
Several important factors must be considered before select­ing the site for the outdoor unit:
Distance to indoor coil
Proximity to the structure
Proximity to vents and exhaust systems
Ability to service
Sound transmission
Air circulation
Wind direction
Relationship between structure, sun, and unit
Distance from power source
Water drainage
Local codes
Locate the outdoor unit near enough to the indoor coil vicinity to eliminate lengthy refrigerant line runs. Do not locate the outdoor unit so it discharges air under eaves or gutters. Rain or snow melt-off should not be able to run off a roof and down upon the unit. Be sure vents are not located upwind from the outdoor unit.
2 Unitary Products Group
Page 3
035-13606-003 Rev. A (202)
A minimum clearance of 18 inches is required for service at the control panel and compressor compartments access. A 10 inch clearance is required for the air inlet to the outdoor coil around the perimeter of the unit. The air discharge of the unit requires a 60 inch clearance between the top of the unit and any obstruction. See Figure 1.
The length of the refrigerant tubing, between the outdoor unit and indoor coil, should be as short as possible to avoid capacity and efficiency loss. Excessive spacing of the out­door unit from the home can lead to the refrigerant lines being restricted by trampling or by being punctured by lawn mowers. Locate the outdoor unit away from bedroom win­dows or other rooms where sound might be objectionable.
Adverse effects of prevailing winds, blowing snow or sleet onto the outdoor coil can be eliminated by placing the outdoor unit where the wind does not blow across the unit. Trees, shrubs, corners of buildings and fences standing off from the coil can reduce capacity loss due to wind chill effect.
MINIMUM 24” SERVICE ACCESS 60” OVERHEAD CLEARANCE
CLEARANCE ON ONE SIDE
Provide ample clearance from shrubs to allow adequate air to pass across the outdoor coil without leaves or branches being pulled into the coil.
Consideration should be given to the distance and routing of electrical service that would have to be run to connect the outdoor unit.
The unit must be located outdoors and must not be con­nected to duct work. It is recommended the outdoor unit be mounted upon a solid base that will not shift or settle. Top of base should be two inches above grade. Thought should be given to water drainage away from the outdoor unit. Drain holes in the base pan must be kept clear.
THERMOSTAT
WEATHERPROOF DISCONNECT SWITCH
TO FURNACE OR AIR HANDLER TERMINAL BLOCK
NEC CLASS 1 WIRING
NEC CLASS 2 WIRING
10” CLEARANCE COIL AREA
NOTE: ALL OUTDOOR WIRING MUST BE WEATHERPROOF.
CONTROL ACCESS PANEL
FIGURE 1 : TYPICAL RESIDENTIAL OUTDOOR UNIT LOCATION
TO INDOOR COIL
SEAL OPENING(S) WITH PERMAGUM OR EQUIVALENT
Unitary Products Group 3
Page 4
035-13606-003 Rev. A (202)
INSTALLATION
OUTDOOR UNIT
After the site has been selected, a solid base pad that will not shift or settle should be provided. The base pad should not come in contact with the foundation or side of the structure because sound may be transmitted to the residence. The pad should be located far enough away from the structure so the outdoor unit is not closer than its minimum distances. See Figure 1. Set the outdoor unit upon the pad with care to avoid damage..
Do not remove the protective caps or plugs from the unit refrigerant connections until the refriger­ant lines are run and ready for final connection. If this procedure is not observed, dirt and other par­ticles will get into the system and plug various ori­fices and small tubes.
INDOOR UNITS
Install the indoor coil in the furnace or air handler according to the installation instructions packed with each component.
REFRIGERANT LINE (SWEAT FIT)
The following steps are very important when setting up a refrigeration system and need to be followed completely to insure that a strong, flexible and leak tight system is obtained.
The installation of the copper refrigerant tubing must be done with care to obtain reliable, trouble-free operation.
1. Selection of proper refrigerant tubing grade and size.
2. Refrigerant line routing, cutting and fitting.
3. Insulating the vapor line.
4. Connecting the refrigerant lines to the indoor coil and outdoor unit.
5. Proper preparation of joint connections.
6. Reassembling, cleaning and brazing the joint connec­tions.
7. Pressure leak test all joints.
8. Evacuate refrigerant lines and indoor coil.
9. Charging refrigeration system (If the line length is other than 15 feet). See Table 2.
Table 2: REFRIGERANT LINE CHARGE
Use only ACR grade copper tubing and keep ends sealed until joints are made.
The correct diameters of the refrigerant lines are listed in the Tabular Data Sheet.
For best performance, select routing of refrigerant lines for minimum distance and fewest number of bends.
Determine the path that the refrigerant lines will follow.
Starting at either the indoor coil or the outdoor unit refrigerant line connections, carefully measure, cut, de-burr and fit cop­per refrigerant lines along the path previously determined.
NOTE: If it is necessary for bends to be formed in the vapor
line, the radius should not be less than 12 inches.
Cut ends of the copper tubing square.
Remove all burrs from tubing with a reamer, file or de-burring tool.
When the indoor coil is above the outdoor unit, the vapor line should be sloped toward the outdoor unit with a fall of at least 1/4 inch per 5 feet.
When the outdoor unit is above the indoor coil the horizontal runs should be sloped toward the outdoor unit as described above.
INSULATION OF VAPOR LINE
Insulate vapor line with 3/8" (or that required by local code) closed cell insulation.
Slide tubing insulation onto the vapor line so that it is covered completely from the indoor coil to the outdoor unit. Be sure that the tubing is capped before sliding on insulation.
It is not necessary to insulate the liquid line, unless it is sub­ject to excess heat in an uninsulated area.
NOTE: In areas of extreme temperatures and humidity,
additional insulation may be required to prevent excessive condensation and loss of capacity.
Do not insulate liquid line and vapor line together. Liquid line should not be in contact with the vapor line. See Figure 2.
Tape
Liquid Line
Incorrect
LIQUID OD VAPOR OD R-22 CHARGE, OZ/FT
3/8" 5/8" 0.66
3/8" 3/4" 0.68
3/8" 7/8" 0.70
3/8" 1-1/8" 0.76
Correct
Insulated Vapor Line
Sheet Metal Hanger
FIGURE 2 : INSULATION OF VAPOR LINE
4 Unitary Products Group
Page 5
035-13606-003 Rev. A (202)
RE-ASSEMBLING, BRAZING AND CLEANING OF JOINT CONNECTIONS
When using hard solder, an inert gas such as dry nitrogen must be introduced and permitted to flow through tubing during brazing to displace air and prevent oxidation.
Remove the Schrader Valve cores from the service valves. Remove the plugs from the service valve field tubing connec­tions. Clean the joints to be brazed.
NOTE: Do not overheat the connection to be brazed as this
can cause improper flow of solder, resulting in a weak and leaking joint. Never apply heat directly to face of fitting. Do not heat solder by direct contact with flame of the torch.
When brazing copper tubing it is very important to preheat the entire joint before applying the solder. This is done by sweeping the flame steadily and evenly around the fitting, to bring both fitting and tubing up to equal temperature before applying the solder.
Reassemble groups of tubing and fittings, brazing several joints instead of one joint at a time. This reduces the chance for error in the alignment of the assembly. Replace Schrader Valve cores. DO NOT OPEN SERVICE VALVES AT THIS TIME.
Clean joint connection immediately after brazing with wet rag.
When recovering refrigerant from a system, with a burnout, follow a safe procedure due to possible contamination.
Avoid getting the refrigerant in the eyes or on the skin.
Contaminated refrigerant must be recovered and returned to the local refrigeration supply house for proper disposition.
TOTAL LINE LENGTH
Units should be installed only with approved system combina­tion (indoor/outdoor) as specified in the Technical Guide.
For systems with total line length exceeding 50 feet, see APPLICATION DATA and work sheet "General Piping Rec­ommendations and Refrigerant Line Length" for vapor and liquid line sizing, calibration of liquid line pressure loss or gain, determination of vapor line velocity, elevation limita­tions, orifice connections, system charging, traps, etc.
Systems with liquid line pressure loss or gain greater than 11 psi must be provided with corrected orifice size as noted in .APPLICATION DATA.
ORIFICE SELECTION (ON SWEAT FIT COILS)
NOTE:
liquid line connection prior to the connection of the refrigerant lines.
The proper orifice must be installed in the indoor coil
REFRIGERANT LINE SUPPORT
Refrigerant lines should be supported in a way that no dips or sags occur. We recommend four feet between supports. If refrigerant lines are to be attached to the home structure, care should be taken to eliminate the transmission of vibra­tions. Attach the refrigerant lines to the indoor coil first. Remove plugs from the indoor coil, then clean joints to be brazed. Braze refrigerant lines to the indoor coil. Attach refrig­erant lines to the outdoor unit.
CHARGING AND LEAK TESTING
On systems with or without service valves the refrigerant should be recovered or recycled in accordance with EPA reg­ulations. In some cases this may require putting piercing valves on both the high and low sides of the system.
DO NOT vent refrigerant to the outdoors.
Coil is under 30 to 35 psig (inert gas) pressure. Each coil has an orifice installed in the fitting
between the liquid line connection and distributor. The orifice is identified on a label next to the liq­uid line connection.
The orifice shipped with the outdoor unit is based on the “most sold” combination, but it may be changed, depending on the capacity and efficiency of the outdoor unit, elevation differences, and/or long total line lengths. An additional ori­fice(s) is shipped with most outdoor units for the most com­monly required replacement combinations. Other sizes must be ordered from Source 1 Parts if required.
See the appropriate Tabular Data Sheet for the correct orifice size and charge adder. If the orifice size matches, nothing fur­ther is required and the refrigerant lines may be connected per the outdoor unit instruction. However, if another orifice should be used, see the coil instruction for details to change the orifice in the coil.
Unitary Products Group 5
Page 6
035-13606-003 Rev. A (202)
REFRIGERANT VALVE OPERATION
All outdoor units are shipped with the service valves in the closed position. After installation of the refrigerant and proper evacuation, make sure that all valves are in the open position and that the caps are securely tightened before turning ON the electrical power to the outdoor unit.
All models in this series have brass service valves. These valves are not back seating. Opening or closing valve does not close service port. Service ports have Schrader valves for gauge connections. Use back-up wrench on valve body when removing cap to open or close the valve. To open, insert hex wrench into stem and back out counter clockwise until stem
just touches retaining ring.
If the valve stem is backed out beyond the retain­ing ring, system pressure could force the stem out of the valve body and possibly cause per­sonal injury. In the event that the retaining ring is missing do not attempt to open the valve.
Some units may have factory installed 1-1/8" ball valves. To open the valve, remove the brass valve stem cap, located on the side of the valve, with an adjustable wrench. Next, turn the valve stem 1/4 turn CCW (away from unit).
All caps must be replaced to prevent leaks.
Replace valve cap finger tight, then tighten an additional 1/6 of a turn with a wrench, using a back-up wrench on the valve body.
OIL TRAPPING
When the outdoor unit is above the indoor coil oil trapping is necessary. Please refer to APPLICATION DATA, 690.01­AD1V (1296) and worksheet 690.01-AD1.1V (791) “General Piping Recommendations and Refrigerant Line length".
Check the system for correct charge after all components of the system have been installed, connected and wired cor­rectly.
Connect service gauges to low pressure port and discharge service ports.
Allow unit to operate until system pressures and tempera­tures have stabilized, making sure that the pressure and tem­perature align with unit service data. If not, check system charge and adjust if necessary.
ELECTRICAL WIRING
To prevent electrical shock, open remote discon­nect so electrical supply to outdoor unit is shut off. Contactor does not open both sides of the 208/230 volt electrical circuit.
POWER SUPPLY
All wiring must comply with N.E.C. and local codes. See rat­ing plate and product data sheet for volts, frequency, phase, maximum fuse size and minimum branch circuit ampacity.
Refer to the wiring diagram inside the unit control box cover before connecting to power supply.
1. The 208/230 volt single phase line voltage service wiring for the outdoor unit must include a disconnect switch located within sight of the outdoor unit.
2. Use the correct size fuse or circuit breaker as listed on the unit rating plate and data sheet. If using nonmetallic­sheathed cable (NM or NM-B) ampacities shall be that of 60° C conductors per N.E.C 336-26.
3. Wiring connections. - Two are provided in the control box:
a. One for low voltage wiring.
b. One entrance for high voltage L1 and L2.
The adjustable High Voltage Conduit Plate is factory installed for 1/2" conduit connections. For 3/4" conduit, remove the screw holding the plate in place and adjust the location of the holes. For 1" conduit, remove the conduit plate and discard. Re-install screw to maintain the integrity of the unit structure, regardless of the conduit being used. See Figures 9, 10 & 11.
4. Power connection to the unit is facilitated by screw termi­nals, L1 and L2 on the outdoor unit contactor. See Fig­ures 9, 10 & 11.
5. Ground the outdoor unit using the ground lug provided. Unless the outdoor unit is grounded through proper wir­ing to the service entrance ground, a suitable separate ground should be provided at the outdoor unit.
6. Use copper conductors only.
Casing or cabinet must be permanently grounded in accordance with National Electric Code or other applicable local codes.
6 Unitary Products Group
Page 7
035-13606-003 Rev. A (202)
LOW VOLTAGE
Control wiring may vary depending upon the type of thermo­stat and furnace being connected.
Low voltage wiring diagrams can be found with the furnace or air conditioning blower package installation instructions.
Pig-tail connector wires (2 blue or 1 blue, 1 brown) are pro­vided from the low voltage pull-in coil on the contactor to a section of the control box (See Figure 12). A “Fingered” bush­ing is provided in the low voltage knockout hole. If 1/2" con­duit is used for the low voltage wiring, the bushing is to be removed.
START RELAY
(Not on all Models)
DUAL RUN/FAN CAPACITOR
START CAPACITOR
(Not on all Models)
1. Route the low voltage cable through the fingered bush­ing in the low voltage junction box. See Figures 9, 10 &
11.
2. Using wire nuts, connect the low voltage wiring within the low voltage box.
3. A minimum of 19 AWG wire must be used in connecting the low voltage control wiring between the outdoor unit, air handler thermostat, and outdoor thermostat. For longer low voltage control wiring lengths, consult the N.E.C.
Connect thermostat and control package wiring as shown in Figure 12 and per the instructions packed with those pieces.
CONTACTOR
FAN MOTOR PLUG
LOW VOLTAGE BOX
GROUND LUG
REVERSIBLE HIGH VOLTAGE CONDUIT PLATE
FIGURE 3 : Typical Condensing Unit Control Box (Start Components Shown)
LOW VOLTAGE BOX
“FINGERED” BUSHING
GROUND LUG
ADJUSTABLE HIGH VOLTAGE CONDUIT PLATE
“FINGERED” BUSHING
START RELAY
CONTACTOR
DUAL RUN/FAN CAPACITOR
FAN MOTOR PLUG
FIGURE 4 : Typical Condensing Unit Control Box (Start Components Shown)
Unitary Products Group 7
Page 8
035-13606-003 Rev. A (202)
E
ALL FIELD WIRING TO BE IN ACCORDANCE WITH ELECTRIC CODE (NEC) AND/OR LOCAL CODES
POWER WIRING
208/230-1-60
230-1-50
CONTACTOR TERMINALS
24 VOLT CONTROL WIRING MINIMUM 18 GA. WIRE (NEC CLASS 2)
POWER WIRING CONTROL WIRING FACTORY WIRING
FURNACE OR AIR HANDLER TERMINAL BLOCK
CYRGW
*
TERMINAL W IS ONLY REQUIRED ON SYSTEMS WITH HEAT.
GND.
LUG
COIL
CONDENSING UNIT
ALL OUTDOOR WIRING MUST BE WEATHERPROOF. USE COPPER CONDUCTORS ONLY.
FIGURE 5 : TYPICAL FIELD WIRING
SYSTEM CHARGE
The factory charge in the outdoor unit includes enough charge for the unit and a most sold matched evaporator. Some indoor coil matches may require some additional charge. See Tabular Data sheet provided in unit literature packet.
Sweat connect units also include sufficient charge for 15 feet of lines. Pre-charged line lengths are factory charged with the correct amount of refrigerant required. Table 2 lists the refrig­erant line charges.
The “TOTAL SYSTEM CHARGE” must be permanently stamped on the unit data plate.
Total system charge is determined as follows:
1. Determine outdoor unit charge from tabular data sheet.
2. Determine indoor coil adjustment from tabular data sheet.
3. Calculate the line charge using Table 2 factors. Calculate over 15 feet of sweat lines for sweat connect units.
NOTE: For sweat connect lines, the line charge over 15 feet
should be included on the data plate and must be added to the system.
4. Total system charge = item 1 + item 2 + item 3.
5. Permanently stamp the unit data plate with the total amount of refrigerant in the system.
Use one of the following charging methods whenever addi­tional refrigerant is required for the system charge.
YRGW
ROOM THERMOSTAT
*
Refrigerant charging should only be carried out by a qualified air conditioning contractor.
MEASUREMENT METHOD
If a calibrated charging cylinder or accurate weighing device is available, add refrigerant accordingly.
Compressor damage will occur if system is improperly charged. On new system installations charge system per R-22 charge information label and follow guidelines in this instruction.
Check flare caps on service ports to be sure they are leak tight. DO NOT OVER TIGHTEN (between 40 and 60 inch - lbs. maximum).
SUPERHEAT CHARGING METHOD
NOTE:
and repair.
1. Operate system until temperatures and pressures stabi-
2. Measure and record indoor wet bulb (WB) temperature
Use this method only during system maintenace
lize (minimum of 10 minutes).
using a sling psychrometer and the outdoor dry bulb (DB) temperature using a thermometer.
8 Unitary Products Group
Page 9
Table 3: SUPERHEAT VALUE
035-13606-003 Rev. A (202)
INDOOR WB
1
°F
50 9 7
52 12 10 6
54 14 12 10 7
56 17 15 14 10 6
58 20 18 16 13 9 5
60 23 21 19 16 12 8 6
62 26 24 22 19 16 12 8 5
64 29 27 24 21 18 15 11 9 6
66 32 31 30 24 23 18 15 11 9 6
68 35 33 30 27 24 21 19 16 14 12 9 6
70 35 33 30 28 25 22 20 18 15 13 11 8
72 35 33 30 28 26 24 20 20 17 15 14
74 34 31 30 27 25 23 22 20 18
76 35 33 31 29 27 26 25 23
1.
Evaporator Entering Air °F
55 60 65 70 75 80 85 90 95 100 105 110 115
OUTDOOR DB°F
Table 4: TEMPERATURE AND PRESSURE
SUCTION
PRESSURE
PSIG
(Service Port)
61.5 3537394143454749515355575961636567 69
64.2 3739414345474951535557596163656769 71
67.1 3941434547495153555759616365676971 73
70.0 4143454749515355575961636567697173 75
73.0 4345474951535557596163636769717375 77
76.0 4547495153555759616365676971737577 79
79.2 4749515355575961636567697173757779 81
82.4 4951535557596163656769717375777981 83
1.
Saturation Temperature
1
246810121416182022242628303234
0
SUCTION SERVICE VALVE SUPERHEAT
Table 5: R-22 SATURATION PROPERTIES
TEMP.°FPRESSURE
PSIG
45 76.02 60 101.62 75 132.22 90 168.40 105 210.75
46 77.58 61 103.49 76 134.45 91 171.02 106 213.81
47 79.17 62 105.39 77 136.71 92 173.67 107 216.90
48 80.77 63 107.32 78 138.99 93 176.35 108 220.02
49 82.39 64 109.26 79 141.30 94 179.06 109 223.17
50 84.03 65 111.23 80 143.63 95 181.80 110 226.35
51 85.69 66 113.22 81 145.99 96 184,56 111 229.56
52 87.38 67 115.24 82 148.37 97 187.36 112 232.80
53 89.08 68 117.28 83 150.78 98 190.18 113 236.08
54 90.81 69 119.34 84 153.22 99 193.03 114 239.38
55 92.56 70 121.43 85 155.68 100 195.91 115 242.72
56 94.32 71 123.54 86 158.17 101 198.82 116 246.10
57 96.11 72 125.67 87 160.69 102 201.76 117 249.50
58 97.93 73 127.83 88 163.23 103 204.72 118 252.94
59 99.76 74 130.01 89 165.80 104 207.72 119 256.41
Unitary Products Group 9
TEMP.°FPRESSURE
PSIG
TEMP.°FPRESSURE
PSIG
TEMP.°FPRESSURE
PSIG
TEMP.°FPRESSURE
PSIG
Page 10
035-13606-003 Rev. A (202)
3. Measure and record the suction pressure at the suction service valve port.
4. Using Table 4, note the superheat value corresponding to the intersection of the indoor wet bulb and the outdoor dry bulb.
5. With the superheat value obtained in step 4 and the suc­tion pressure value from step 3, find the intersection of the values in Table 5. This is the required suction tube temperature at the suction service valve.
6. To bring the tube temperature in line with the required value from Table 5, add refrigerant to the service port to cause the tube temperature to fall and reclaim refrigerant to cause the temperature to rise.
CHECKOUT PROCEDURE
Use the following list to see that nothing was over looked:
1. Have all braze joints on refrigerant lines been leak checked? (Sweat Fit Units)
2. Line set fittings leak checked? (Quick Connect Units)
3. Have base valves been opened? (Sweat Fit Units only)
4. Have all refrigerant lines been secured and isolated properly?
5. Is the indoor coil drain hooked up and draining freely? Pour water in drain pan.
6. Is air filter installed and clean?
7. Is the blower motor speed set correctly?
IMPORTANT - Installer should place unit data sheet and
installation instructions in customer packet and give to home owner after installation is complete.
SYSTEM OPERATION CHECKOUT
1. With thermostat set to the OFF position, close discon­nect switch or switches to complete circuits to condens­ing unit and furnace. Set thermostat to call for cooling.
2. After the system starts, check the voltage and amperage at the condensing unit contactor.
3. If voltage is not within 10% of rated voltage, or amperage greatly exceeds nameplate amperage, shut down the system and contact the local power company for correc­tions; otherwise unsatisfactory performance may result.
4. With the system in operation, check the condensing unit for unusual noise and undue vibration.
5. Allow the system to operate until it is balanced or stabi­lized (approximately 30 minutes), before making further checks.
6. Remove manifold gages hoses, and install cap on Schrader valves.
10 Unitary Products Group
Page 11
SERVICE RECORDS
035-13606-003 Rev. A (202)
Unitary Products Group 11
Page 12