Xantech s-62, s-66, s-64 Installation Instructions Manual

INSTALLATION INSTRUCTIONS
S-62, S-64, S-66
SMARTSPEAKER
TM
INTRODUCTION
DESCRIPTION
R-61 Rough-in Kit
• The Rough-in Kit consists of a pair of molded rectangular frames, flat perforated “wings” and thread­cutting screws.
• The Rough-in Kit is mounted to the wooden studs during construction and is installed before the plasterboard. It is not used in existing construction.
F63 Bezel/Grille
• The molded plastic bezel mounts directly to the wall or ceiling, with or without the Rough-in Kit. It is held in place by four “dogs” which slip through the rectangular wall cutout and rotate into clamping position as they are tightened.
• The bezel can be painted to match the mounting surface after it is installed.
• The perforated metal grille should be painted, if desired, before installation.
• The grille should be carefully installed after the speaker/baffle assembly has been mounted. Care should be taken so that the edges of the grille do not scratch the finished surfaces of the bezel. The grille should be painted, if desired, before installation.
Speakers & Volume Controls
1
S-62, S-64 and S-66 Speaker Systems
• Each system, consisting of a woofer, a tweeter and a matching crossover network, is mounted on a baffle panel.
• The baffle panels for all three systems are sized to mount in the F-63 Bezel. Since the sizes are iden­tical and the system is installed only after the con­struction and painting is finished, the choice of which system to use can be left until the end of the job.
• The speaker/baffle assembly fastens to the bezel with four thread-cutting screws (supplied).
Dinky Link
The 480 Dinky Link Infrared Receiver is a miniature
IR receiver. The 480 makes it possible to extend the functional range of infrared remote controllers to rooms other than those which house the controlled equipment.
• Xantech manufactures a complete line of Infrared Receivers, Keypads, Emitters, Audio Video & Speaker Switchers, Zone Controllers and a Multi­Channel Audio Amplifier.
Fig. 1a
Fig. 1b
INSTALLATION
New Construction
• After framing but before plasterboard is applied, assemble the Rough-in Kit.
• Figure 1a illustrates the usual arrangement for mounting the speaker system vertically between studs located on 16-inch centers. Figures 1b and 1c show alternate arrangements for horizontal and ceiling mounting.
• Fasten the Rough-in Kit to the studs with four drywall screws (supplied). The frame should project out of the wall so that it will line the hole to be cut in the drywall.
• Figure 2a illustrates a correctly mounted Rough-in Kit mounted between studs on 16-inch centers.
• Figures 2b and 2c show alternate arrangements while Figure 2d shows a typical ceiling installation.
• Figure 3 illustrates an exploded, cutaway view of a typical installation. (a) is the stud-mounted Rough­in Kit, (b) is the plasterboard with the mounting hole cut, (c) is the bezel with the four mounting “dogs”, (d) is the baffle panel and speaker components and (e) is the optional Dinky Link Infrared Receiver.
• Figure 4 shows the action of the rotating mounting “dogs”.
Fig. 1c
Amplifier
Preampli
2
f
SPEAKERS
Loading...
+ 2 hidden pages