Before you start...
Proper installation is your responsibility.
Make sure you have everyihing
necessary for correct installation.
The clearances specified are for
combustible walls and materials that
30” min. base
cabinet
is required. If
Grounded electrical supply is reqwed
cabinet has a drawer, a 3-l/2” depth
See ‘Electrical requirements-. Panel 8.
clearance from the countertop to the
top of the drawer (or other obstructton)
in base cabinet is required.
I
have a density of 20 or more pounds
per cubic foot. No evaluation of
clearances has been made for
installotlons adjacent to materials that
are less than 20 pounds per cubic foot
or10 plastic tiles and sheeting
Check location where
cookfop will
be installed. The location should be
away from strong draft areas, such as
windows, doors and strong
heCItIng
vents or fans. The cook-top should
be located for convenient use in
Counlertop opening dimensions
that are shown must be used
For new installations:
I
.--3*-l/2’
2&1/2’min.-
I
29-W’ max.
opening deplh:
IS-314’
min.-
20-!a’ “XIX.
2.718’ “I”. Ipace lo llO”l
edgo or counlerlop
If cabinet has a drawer, a 3-l/2’
depth clearance from the counferop
to the top of the drawer (or other
obstruction cablnet) IS requited
Electrical Shwzk Hazard
It is
Ihe cuslomer’s responsibilii:
l
To contacl a qualiied elecfrical
installer.
l
To assure Thai the eleclrical
insfallafion is adequaie and in
conformance with National
Electrical Code, ANSI/NFPA 70.
lalesi ediiion”. and all local
codes and ordinances.
:ailure to do x) could result in
ire, electrical shock or ofher
z=xwnal injury.
Personal Injury Hazard
Cabinet storage above Me cookin
UfOCe should be avoided. If
:abinels are already installed,
educe the hazard of reaching
wer a heated cocking surface
)y inslolling range hood.
he range hood should extend a
ninimum of 5 inches out horn the
mttom front of the cabinets.
leaching over a heated
:aoking surlace could result in a
erious burn.
Important:
Observe all governing codes and
ordinances. Failure to meet codes
and ordinances could lead to fire
or
electrical shock.
Tools needed for
installaticn:
Panel A