WALL MOUNT FAUCET INSTALLATION GUIDE
BEFORE YOU BEGIN
1) Shut off water supply.
2) Carefully inspect waste and supply tubing for signs of damage.
3) Replace waste or supply tubing if nec
A) VALVE BODY INSTALLATION
1) Prepare for installation by installing a wood crossmenber between two studs
where the valve will mount.
Important : Take into consideration the thickness of your finished wall.
If your valve is installed too far behind your finished wall, you may
be left with insufficient clearance to attach the spout and handles.
es
sary
MODEL: F4-0001
Recommended Tools:
- Drill
- Hack Saw
- Level
- Tape Measure
- Safety Glasses
2) Mount the rough-in valve into its prepared location. Attach the valve body to
the crossmember byusing galvanized pipe clamps (not included). Use a level
to ensure the valve is mounted straight.
3) Attach the main water lines to the valve. Apply thread sealant or Teflon
tape to the threaded connection to ensure a watertight seal.
1/2-14 NPS
CROSSMEMBER
(to be installed by installer)
WALL THICKNESS
MAX. 7/8” (22mm)
1-5/8” (42mm)
STUD
GALVANIZED PIPE CLAMP
MODEL: F4-0001
4) Drill holes size as below for valve body on the finished wall.
1-1/4” (32mm), MAX 1-3/4” (45mm)
B) SPOUT AND HANDLES INSTALLATION
1) Once your finished wall has been completed, slide the decorative ring onto
the base of the spout. Attach the spout to the installed valve body. Once in
place, tighten the set screw underneath to secure.
2) Thread escutcheons onto the stem until hand-tight.
Ensure the rubber washers remain seated on the escutcheons.
3) Attach the hot and cold handles to the valve stems.
Ensure the hot handle is on the left, and the cold is on the right.
C) FINAL CHECK
1) Ensure all connections are tightened properly.
2) Turn on main water supply.
3) Turn on both hot and cold water for 2 minutes.
4) Check for leaks.
5) Remove the aerator cap and ae
6)
Reinstall aerator.
rator, check for debris, clean if necessary.
FINISHED
WALL