Viessmann AirflowPLUS AH2A-213, AirflowPLUS AH2A-354, AirflowPLUS AH2A-385 Installation, Service And Operating Instruction

Installation, Service and Operating Instructions
for use by heating contractor
Viessmann AirflowPLUS AH2A series Hydronic forced air handler
Viessmann Airfl owPLUS
5680 011 - 10 06/2016
IMPORTANT
Read and save these instructions for future reference.
Please file in Service Binder
Safety
Safety, Installation and Warranty Requirements
Please ensure that these instructions are read and understood before commencing installation. Failure to comply with the instructions listed below and details printed in this manual can cause product/property damage, severe personal injury, and/or loss of life. Ensure all requirements below are understood and fulfilled (including detailed information found in manual subsections).
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Product documentation Read all applicable documentation before commencing installation. Store documentation near air handler in a readily accessible location for reference in the future by service personnel.
For a listing of applicable literature, please see section entitled “Important Regulatory and Installation Requirements”.
Warranty Information contained in this and related product documentation must be read and followed. Failure to do so renders the warranty null and void.
Licensed professional heating contractor The installation, adjustment, service and maintenance of this equipment must be performed by a licensed professional heating contractor.
Please see section entitled “Important Regulatory and Installation Requirements”.
Advice to owner Once the installation work is complete, the heating contractor must familiarize the system operator/ ultimate owner with all equipment, as well as safety precautions/requirements, shutdown procedure, and the need for professional service annually before the heating season begins.
WARNING
Follow the Viessmann maintenance schedule of the boiler contained in this manual.
Operating and service documentation
It is recommended that all product documentation such as parts lists, operating and service instructions be handed over to the system user for storage. Documentation is to be stored near air handler in a readily accessible location for reference by service personnel.
Fiberglass wool materials
WARNING
Inhaling of fiberglass wool materials is a possible cancer hazard. These materials can also cause respiratory, skin and eye irritation.
The state of California has listed the airborne fibers of these materials as a possible cancer hazard through inhalation. When handling these materials, special care must be applied.
Suppliers of fiberglass wool products recommend the following precautions be taken when handling these materials:
- Avoid breathing fiberglass dust and contact with skin and eyes.
- Use NIOSH approved dust/mist respirator.
- Wear long-sleeved, loose fitting clothing, gloves and eye protection.
- Wash work clothes separately from other clothing. Rinse washer thoroughly.
- Operations such as sawing, blowing, tear-out and spraying may generate airborne fiber concentration requiring additional protection.
First aid measures
- If eye contact occurs, flush eyes with water to remove dust. If symptoms persist, seek medical attention.
- If skin contact occurs, wash affected areas gently with soap and warm water after handling.
WARNING
Appliance materials of construction, may contain toxic or harmful substances which can cause serious injury or loss of life and which are known to the State of California to cause cancer, birth defects and other reproductive harm. Always use proper safety clothing, respirators and equipment when servicing or working nearby the appliance.
2
2
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Table of Contents
Page
Safety
General Information
Product Description
Installation
Safety, Installation and Warranty Requirements..............2
Product documentation...........................................2
Warranty...............................................................2
Licensed professional heating contractor...................2
Advice to owner....................................................2
Operating and service documentation.......................2
Fiberglass wool materials........................................2
First aid measures..................................................2
About these Installation Instructions..............................5
Necessary Tools.........................................................5
Important Regulatory and Installation Requirements........6
Codes..................................................................6
Instructing the system user...................................6
Initial start-up........................................................6
Working on the equipment......................................6
Technical literature................................................6
Introduction...............................................................7
Components................................................................7
Features......................................................................8
Equipment Selection and Sizing.....................................9
Compatibility Charts.....................................................9
Before Set-up..............................................................11
Minimum Clearances...................................................11
Dimensions.............................................................12
Heating Circuit Pumps.............................................13
Installation...............................................................13
Installation Examples.................................................14
Horizontal installation...........................................14
Vertical installation..............................................15
Proper Piping Practice................................................16
Connecting to the Heating System..............................16
Removing the blower shipping Bracket........................17
Opening the Air Handling Unit....................................17
Panels.....................................................................18
Accessing the Connection Board................................21
Vitodens 100 WB1B Wiring.......................................22
Vitodens 100 WB1B Wiring using DHW Connection.....23
HO1B Wiring............................................................24
Control Function.......................................................25
Supply Water Temperature (T1).................................25
Freeze Protection Temperature (T3)............................25
A/C Discharge Air Temperature (T4)...........................25
Remote Return Air Sensor (T5)..................................26
Ambient Sensor (T6).................................................26
Sensor Locations......................................................26
Override Settings.....................................................27
System Select Dip Switch Settings............................27
Door Safety Switch..................................................28
Electrical.................................................................29
Thermostat.........................................................29
Power Supply...........................................................30
Control Inputs.........................................................31
Setting Fan Speed....................................................32
5680 011 -10
3
Table of Contents
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Page
Startup
Operation
Service
Quick Check.............................................................35
Pre-start Checklist.....................................................35
Startup Procedure....................................................36
Air handlers LED Indications for Temperature...............36
Closing the Air Handling Unit.....................................37
Indicators................................................................38
Flashing LED............................................................38
Normal Operation......................................................38
Heating mode.....................................................38
Cooling mode......................................................38
Summary............................................................38
External Heat Demand via Switching Contact -
Boilers equipped with HO1B User Interface..................39
Heating System Operation - Vitodens 100 WB1B..........39
DHW Contact for Air Handler - Vitodens 100 WB1B......40
Illuminated Alarm Indicator.........................................41
Home freeze protect............................................41
Heat exchanger freezing protection control.............41
Cooling lockout...................................................41
Temperature sensor failure....................................41
Audible Alarm Indicator.............................................41
Alarm Relay and LED Fault Codes..............................42
Control LED flash codes.......................................42
Alarm.................................................................42
Checking ECM (DC) Fan Motor Connections.................43
Troubleshooting.......................................................44
Service and Maintenance...........................................48
Checking temperature sensor................................48
Installed sensors..................................................48
Failed sensors......................................................48
Air filter..............................................................48
Circulator...........................................................48
Coils..................................................................48
Additional Information
4
System Layout 1......................................................49
System Layout 2......................................................50
System Layout 3......................................................51
System Layout 4......................................................52
System Layout 5......................................................53
System Layout 6......................................................54
System Layout 7......................................................55
System Layout 8......................................................56
Technical Data.........................................................57
Electrical Connectors.................................................58
Parts List.................................................................60
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
About these Installation Instructions
Take note of all symbols and notations intended to draw attention to potential hazards or important product information.
WARNING
Warnings draw your attention to the presence of potential hazards or important product information.
CAUTION
Cautions draw your attention to the presence of potential hazards or important product information.
IMPORTANT
Indicates an imminently hazardous situation which, if not avoided, could result in death, serious injury or substantial product/property damage.
Indicates an imminently hazardous situation which, if not avoided, may result in minor injury or product/ property damage.
Helpful hints for installation, operation or maintenance which pertain to the product.
General Information

Necessary Tools
Testing/analysis equipment
(Use only calibrated equipment)
H Multimeter to measure 0 - 230V, 0 - 12A AC and
0-100 mA DC
H Manometer to measure air pressure 0 to 11 "w.c.
(accurately) (or a non-electric Magnehelic® manometer may also be utilized)
This symbol indicates to note additional information
This symbol indicates that other instructions must be
referenced.
Cleaning supplies
H Plastic hand brush H Rags
Special items
H Pipe joint sealant
5680 011 -10
5
General Information
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Important Regulatory and Installation Requirements
Codes
In Canada all electrical wiring is to be done in accordance with the latest edition of CSA C22.1 Part 1 and/or local codes. In the U.S. use the National Electrical Code ANSI/ NFPA 70. The heating contractor must also comply with both the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME CSD-1, and the Installation Code for Hydronic Heating Systems, CSA B214-01, where required by the authority having jurisdiction.
Instructing the system user
The installer of the system is responsible to ensure the system operator/ultimate owner is made familiar with the system functioning, its activation, and its shut-down.
The following topics must be covered:
- Proper system operation sequence.
- Explain the equipment.
- Demonstrate an emergency shut-down, what to do and what not.
- Explain that there is no substitute for proper maintenance to help ensure safe operation.
Initial start-up
Initial start-up must be performed by a qualified heating contractor. Proper completion of the Maintenance Record by the heating contractor is also required.
Working on the equipment
The installation, adjustment, service, and maintenance of this air handler must be done by a licensed professional heating contractor who is qualified and experienced in the installation, service, and maintenance of hot water heating equipment. There are no user serviceable parts on the air handler.
Please carefully read this manual prior to attempting start-up, maintenance or service. Any warranty is null and void if these instructions are not followed.
For information regarding other Viessmann System Technology componentry, please reference documentation of the respective product.
We offer frequent installation and service seminars to familiarize our partners with our products. Please inquire.
Ensure main power supply to equipment, the heating system, and all external controls have been deactivated. Take precautions in all instances to avoid accidental activation of power during service work.
The completeness and functionality of field supplied electrical controls and components must be verified by the heating contractor. These include low water cut-offs, flow switches (if used), staging controls, pumps, motorized valves, air vents, thermostats, etc.
Technical literature
Literature for the Viessmann AirflowPLUS air handler:
- Technical Data Manual
- Installation, Service, and Operating Instructions
- Instructions of other Viessmann products utilized and installed
- Installation codes mentioned in this manual
Leave all literature at the installation site and advise the system operator/ultimate owner where the literature can be found. Contact Viessmann for additional copies.
This product comes with several safety instruction labels attached. Do not remove! Contact Viessmann immediately if replacement labels are required.
6
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Introduction
The Viessmann AirflowPLUS AH2A series air handlers are to be used in conjunction with Viessmann boilers.
The automatic adjustments are made in heating as well as cooling. This minimizes selecting an oversized heating appliance just to accommodate the cooling load. The Viessmann AirflowPLUS AH2A series is always the right size.
Components
Cabinet
All cabinets have a tough, durable powder coat finish on satin coat 20 gauge steel.
Heating coils
All heating coils are copper and assembled using no lead solder. All coils and internal piping conform to ASTM B-68, B-88 and/or B-743 standards. High density aluminum fins provide maximum heat transfer for small coil surface.
Fan and motor
The ECM fan is a wide body dynamically balanced for extra quiet operation. Multi-directional sleeve bearing motors allow mounting in any direction for maximum installation flexibility.
Product Description
Legend
A Standard adaptors (at the rear) B Heating coil and pump slide out for easy service C Integrate pump with check valve D Fibreglass insulation with reinforced foil face and
gasket seals
E Fan and controls slide out on rails F Integrated filter rack
Circulating pump
The internal circulating pump is matched for maximum performance. All Airflow PLUS air handlers come with internally mounted pumps for ease of installation.
Check valve
A check valve is built into the circulator to protect against backflow of water.
5680 011 -10
7
Product Description
Features
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Condenser freeze protection
If the evaporator coil outlet air temperature is too low or operating outside of normal conditions, the control will shut off the outdoor condenser for 5 minutes. Evaporator coil freezing can cause slugging at the compressor. Dirty air filters, oversizing of A/C equipment, improper A/C installation and commissioning and/or poor duct design may also contribute to evaporator coil freezing.
Pump exercise function
If the internal circulating pump has not run in the previous 24 hours, the control will turn the pump on for 1 minute to flush the lines and heat exchanger. This will help ensure that the water lubricated pump does not seize during long periods of inactivity.
Home freeze protection
The Viessmann AirflowPLUS AH2A series air handlers have an integrated sensor which will help prevent the home from freezing due to a faulty thermostat. Should the ambient temperature get too low, the control will turn the air handler on automatically and maintain the home at approximately 40°F (4°C). Note: this feature will only work if the boiler is turned on and the air handler has power. While in Home freeze protect mode the alarm relay and red light will be on. Refer to page 41.
Status and alarm indicators
A bicolor LED indicator is installed in the air handler housing and is used to indicate alarm, test mode, and normal operation. The indicator will display temperature readings of the sensors during normal operation.
Alarms
Should service problems arise the Viessmann AirflowPLUS AH2A series will notify the user with an audible alarm and/or housing mounted LED. Dry contacts are provided on the controller which can be connected to an external device such as a warning light or home security system.
Customizing
The heating and cooling features can be field customized to provide maximum comfort for almost any home or location. Refer to page 27, 32, 33 and 34.
8
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Equipment Selection and Sizing
Proper sizing of systems components is crucial for proper operation;
1. Obtain room by room heat loss and/or heat gain
2. Determine heating water temperature
3. Determine duct layout
Make sure a proper room-by-room heat loss and heat gain for the dwelling is calculated using Manual J, HRAI, ASHRAE or other approved sizing method.
Compatibility Charts
Air handler model AH2A-213
Boiler supply water temperature 120°F (28 MBH) 140°F (46 MBH) 160°F (62 MBH) 180°F (72 MBH) Vitodens 100 WB1B-26 Vitodens 100 WB1B-35
 
Product Description
--
--
Vitodens 222 B2TB-19 Vitodens 222 B2TB-35
Vitodens 200 B2HB-19 Vitodens 200 B2HB-26 Vitodens 200 B2HB-35 Vitodens 200 B2HB-45 Vitodens 200 B2HB-57 Vitodens 200 B2HA-45 Vitodens 200 B2HA-60 Vitodens 200 B2HA-80 Vitodens 200 B2HA-88 Vitodens 200 B2HA-100 Vitodens 200 B2HA-112 Vitodens 200 B2HA-150
Vitocrossal 300 CU3A-26 Vitocrossal 300 CU3A-35 Vitocrossal 300 CU3A-45 Vitocrossal 300 CU3A-57
Note: Compatibility charts do not take into consideration systems using additional heat emitters, DHW load etc. Ensure the boiler selected meets all of the system requirements for loads generated by additional components. It is the responsibility of the system designer to ensure proper sizing and equipment selection.
 
           
   
-- --
--
-- --
--
--
--
--
--
--
--
--
--
5680 011 -10
9
Product Description
Compatibility Charts (continued)
Air handler model AH2A-354
Boiler supply water temperature 120°F (44 MBH) 140°F (61 MBH) 160°F (83 MBH) 180°F (98 MBH) Vitodens 100 WB1B-26 Vitodens 100 WB1B-35
Viessmann AirflowPLUS AH2A Installation, Operating and Service
   
--
--
Vitodens 222 B2TB-19 Vitodens 222 B2TB-35
Vitodens 200 B2HB-19 Vitodens 200 B2HB-26 Vitodens 200 B2HB-35 Vitodens 200 B2HB-45 Vitodens 200 B2HB-57 Vitodens 200 B2HA-45 Vitodens 200 B2HA-60 Vitodens 200 B2HA-80 Vitodens 200 B2HA-88 Vitodens 200 B2HA-100 Vitodens 200 B2HA-112 Vitodens 200 B2HA-150
Vitocrossal 300 CU3A-26 Vitocrossal 300 CU3A-35 Vitocrossal 300 CU3A-45 Vitocrossal 300 CU3A-57
Air handler model AH2A-385
Boiler supply water temperature 120°F (51 MBH) 140°F (74 MBH) 160°F (90 MBH) 180°F (115 MBH) Vitodens 100 WB1B-26
Vitodens 100 WB1B-35
  
                        
         
 
-- --
--
-- --
--
--
--
--
--
--
--
--
--
--
--
-- --
--
Vitodens 222 B2TB-19 Vitodens 222 B2TB-35
Vitodens 200 B2HB-19 Vitodens 200 B2HB-26 Vitodens 200 B2HB-35 Vitodens 200 B2HB-45 Vitodens 200 B2HB-57 Vitodens 200 B2HA-45 Vitodens 200 B2HA-60 Vitodens 200 B2HA-80 Vitodens 200 B2HA-88 Vitodens 200 B2HA-100 Vitodens 200 B2HA-112 Vitodens 200 B2HA-150
Vitocrossal 300 CU3A-26 Vitocrossal 300 CU3A-35 Vitocrossal 300 CU3A-45 Vitocrossal 300 CU3A-57
Note: Compatibility charts do not take into consideration systems using additional heat emitters, DHW load etc. Ensure the boiler selected meets all of the system requirements for loads generated by additional components. It is the responsibility of the system designer to ensure proper sizing and equipment selection.
10
 
             
     
-- --
--
--
--
--
--
--
--
--
--
--
--
-- --
--
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Before Set-up
Before placing Viessmann AirflowPLUS in its installation location, ensure all necessary accessories are installed.
The air handler must be installed in such a way that electrical components are protected from water (spraying, splashing, etc.) during operation and service.
Minimum Clearances
Installation
CAUTION
Horizontal Installation
Recommended minimum service clearances
For typical Viessmann AirflowPLUS installation, it is recommended to install the air handler with the clearances shown in the illustration.
a - 24 in. (610 mm) b - 12 in. (305 mm)
These dimensions reflect the recommended service clearance for the air handler only, ensure adequate clearance is left for the installation of ducting, piping and electrical connections. Only the b clearance may be reduced providing there is enough clearance for ductwork, plumbing and electrical connections, with zero clearance between the air handler unit and ducting being acceptable.
Vertical Installation
5680 011 -10
11
Installation
Dimensions
Viessmann AirflowPLUS AH2A Installation, Operating and Service
IMPORTANT
The maximum ambient temperature must not exceed 104ºF (40ºC).
Top view
Legend
A Heating water supply connection B Heating water return connection
AH2A-213 AH2A-354 AH2A-385
a in.
(mm)
b in.
(mm)18(457 mm)22(559 mm)22(559 mm)
c* in.
(mm)
d* in.
(mm)
e* in.
(mm)
f in.
(mm)2(51 mm)
g in.
(mm)3(76 mm)
h in.
(mm)
* Using the adjustable levelling feet can add up to 1b” (38 mm) to the height of the air handler.
22c
(578 mm)
32b
(826 mm)
22a
(572 mm)
23b
(597 mm)
24c
(629 mm)
23
(584 mm)28(711 mm)
34b
(876 mm)
24e
(620 mm)
25b
(650 mm)
1c
(44 mm)
3f
(92 mm)
25
(635 mm)30(762 mm)
34b
(876 mm)
24e
(620 mm)
25b
(650 mm)
1c
(44 mm)
3f
(92 mm)
Front view
Side view
12
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Heating Circuit Pumps
Pump Model Grundfos UPS15-58RU
Rated voltage VAC 115 Rated current Amp 0.74 Capacitor Power consumption Watts 87
Legend
A Speed 1 Pump curve B Speed 2 Pump curve C Speed 3 Pump curve
F
Installation
10
Note: All Viessmann AirflowPLUS air handlers come with pump speed factory set to speed 3.
Installation
The contractor shall adhere to all local, state and national code requirements pertaining to the installation of this equipment.
The Viessmann AirflowPLUS AH2A series air handler can be mounted in most directions. Upflow, downflow, horizontal left and horizontal right. You cannot install the air handler on it’s back or suspended with front cover facing down. An adequately sized drain pan and drain connection must be installed under the appliance if installed in or above a finished space.
If installed in an unfinished space, a drain pan is not provided, necessary precautions must taken to ensure proper drainage of water in the event of a water leak (e.g. Floor drain, sump pump, moisture alarm...). This appliance shall not be installed in a non conditioned space where the potential may exist for the appliance and or water lines and drain line to freeze.
The return air can ONLY be installed in the bottom of the cabinet in horizontal installations. DO NOT install the return air in the bottom of the cabinet in vertical installations. To do so will not permit the installation of the required drain pan and drain.
The Viessmann AirflowPLUS AH2A can be suspended by securing straps to the corners of the enclosure (field supplied).
Install the air handler with the door screwed in place to avoid distortion of the cabinet. The installing contractor must ensure that suspension materials are sized and installed to provide sufficient support to the air handler and connected accessory fittings and materials.
Note: System layout examples are provided starting on page 50 of these instructions.
5680 011 -10
13
Installation
Installation Examples
Horizontal installation
Viessmann AirflowPLUS AH2A Installation, Operating and Service
IMPORTANT
A field fabricated auxiliary drain pan with drain pipe is recommended in all configurations.
Discharge air
Note: Return air openings are provided in both the bottom and side panels.
Note: Field selected suspension materials must be sized by installing contractor so as to be of sufficient strength to support air handler weight of 150 lbs. (68 kg) and connected accessory fittings and materials.
Suspension material (field supplied)
Secure the suspension material to the corners of the air handler housing.
Cold air return
CAUTION
Return air openings shall not be installed in back panel.
IMPORTANT
You cannot install the air handler on it’s back or suspended with front cover facing down.
Temperature sensor and low voltage lead routing A/C
Coil installed upstream of Air Handler in return plenum. Refer to “Remote Return Air Sensor T5” on page 26 for information.
For horizontal installation over a finished space A field fabricated auxiliary drain pan with drain pipe is required to prevent damage by overflow due to blocked condensate drain.
14
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Installation Examples
(continued)
Installation
Vertical installation
The A/C coil is installed in the downstream air flow of the Viessmann AirflowPLUS air handler.
Discharge air
Discharge sensor lead shall be routed out of air handler casing through knock-out provided in either side of casing and secured to plenum using nylon clips provided.
Drill 3/8” dia. hole in return air duct a minimum of 15” (381 mm) downstream of plenum.
Snap round bushing into hole and insert sensor lead approximately 2” (51 mm) and secure to duct using nylon strap included.
Discharge sensor lead and low voltage lead wires shall be isolated from high voltage leads and routed through knockouts provided.
IMPORTANT
A field fabricated auxiliary drain pan with drain pipe is required in all configurations.
CAUTION
Return air openings shall not be installed in back panel.
A/C coil
Cold air return
Air Filter
Vertical installation
The A/C coil is installed in the upstream air flow of the Viessmann AirflowPLUS air handler. This will require the use of the remote return air temperature sensor mounted upstream of the A/C coil. See page 41 for additional information regarding the remote return air temperature sensor.
Discharge air
Discharge sensor lead and low voltage lead wires shall be isolated from high voltage leads and routed through knockouts provided.
Cold air return
For remote return air temperature sensor drill 3/8” dia. hole in return air duct a minimum of 15” upstream of plenum. Snap round bushing into hole and insert sensor lead approximately 2” (51 mm) and secure to duct using nylon strap included.
Air Filter
A/C Coil
5680 011 -10
15
Installation
Proper Piping Practice
Viessmann AirflowPLUS AH2A Installation, Operating and Service
2 imperfect threads
Leave 2 threads bare
Connecting to the Heating System
Support piping by proper suspension method. Piping must not rest on or be supported by the air handler. Use moderate amount of dope.
This section constitutes an overview only! Refer to subsequent sections for detailed information on individual piping connections.
Use an approved pipe sealant or teflon tape when connecting the following installation fittings.
Air handler piping
Depending on the boiler selected and system design it may be required to use a primary, secondary piping arrangement to de-couple the flow through the boiler from the flow through the air handler. Refer to the system layout examples starting on page 49.
Boiler
Follow the instructions provided with the boiler for installation and start-up of the boiler. Make sure the heating device is turned off during air handler installation and service. Ensure system has been filled, and all air is purged from the system before turning on the heating boiler.
Duct work
All duct designs must be designed to conform with ARI Manuals “J” and “D” or local codes and requirements. To minimize fan noise in the living space, it is recommended that the first six feet of supply and return air duct be lined with acoustic insulation.
Return and supply air duct work should be the same size as the air handler openings up to the first branch, fitting or transition.
16
5680 011 -10
Viessmann AirflowPLUS AH2A Installation, Operating and Service
Removing the Blower Shipping Bracket
1. Remove the bracket retaining thumb screws and discard.
2. Remove the bracket and discard.
Opening the Air Handler Unit
1. Remove the lower front panel retaining screws and set aside.
Installation
2. Tilt the lower front panel forward at the top and lift out.
3. Remove the upper front panel retaining screws and set aside.
4. Slide the upper front panel down and pull out.
5680 011 -10
17
Installation
Panels
Vertical opening
(left side)
Viessmann AirflowPLUS AH2A Installation, Operating and Service
There are 2 return air openings on the air handler. One is located on the left side for vertical installations and one is located at the bottom for horizontal installations. For horizontal installations, remove the bottom panel and install it to the left side panel opening.
Horizontal opening
(bottom)
Horizontal installation
1. Remove the bottom panel retaining screws and set aside.
2. Remove the bottom panel and set aside. Note: The fan tray is preinstalled into the bottom of
the air handler.
3. Install the bottom panel to the left side of the air handler opening and secure with the retaining screws.
4. Connect the field supplied ducting to the bottom of the air handler.
5. Connect the field supplied ducting as required.
18
5680 011 -10