Viadrus HERCULES Green Eco Therm 32S, HERCULES Green Eco Therm, HERCULES Green Eco Therm 32J, HERCULES Green Eco Therm 25J, HERCULES Green Eco Therm 25S Series Manual

VIADRUS HERCULES Green Eco Therm
Manual for boiler operation and installation
GB_2015_11
Contents:
1. Produced variants of boiler .......................................................................................................................... 3
page
2. Technical data of the boiler ......................................................................................................................... 4
3. Boiler description ......................................................................................................................................... 6
3.1
Boiler drum construction ..................................................................................................................... 6
3.2
Control, regulation and safety elements ............................................................................................. 6
3.2
The construction of burner and transport routes of the fuel ................................................................ 9
4. Location and installation ............................................................................................................................ 11
4.1
Regulations and directives ................................................................................................................ 11
4.2
Positioning possibilities ..................................................................................................................... 12
5. Order, delivery and assembly .................................................................................................................... 14
5.1
Order ................................................................................................................................................. 14
5.2
Delivery and accessories .................................................................................................................. 14
5.3
Assembly procedure ......................................................................................................................... 16
5.3.1 Boiler drum installation .................................................................................................................. 16
5.3.2 Mounting of partitions of the combustion chamber and turbulators .............................................. 17
5.3.3 Mounting of burner ........................................................................................................................ 17
5.3.4 Mounting of the fuel reservoir ....................................................................................................... 19
5.3.5 Mounting of the shells ................................................................................................................... 20
5.3.6 Installation of electrical wiring ....................................................................................................... 21
5.3.6.1 Version VIADRUS HERCULES Green Eco Therm XJ ......................................................... 21
5.3.6.1 Version VIADRUS HERCULES Green Eco Therm XS ......................................................... 22
5.3.7 Assembly tools for brush............................................................................................................... 22
5.3.8 Filling of the heat system with water ............................................................................................. 22
5.3.9 Electrical scheme .......................................................................................................................... 23
5.3.10 Boiler hydraulic diagram ............................................................................................................... 27
6. Putting into operation - instructions for contractual service organization .................................................. 28
6.1
Inspections before start-up ............................................................................................................... 28
6.2
Boiler putting into operation .............................................................................................................. 28
7. Boiler operation by user ............................................................................................................................. 29
7.1
Version VIADRUS HERCULES Green Eco Therm XJ ..................................................................... 29
7.1.1 Setting of the heat output of burner .............................................................................................. 31
7.2
Version VIADRUS HERCULES Green Eco Therm XS..................................................................... 35
7.2.1 Setting of the heat output of burner .............................................................................................. 37
8. IMPORTANT WARNINGS ........................................................................................................................ 40
9. Maintenance .............................................................................................................................................. 41
10. Faults and their removal ........................................................................................................................ 43
11. Instructions for product liquidation after its operating life ....................................................................... 45
12. Warranty and defect liability ................................................................................................................... 45
2
Dear customer, thank you for the purchase of VIADRUS HERCULES Green Eco Therm boiler; this purchase demonstrates your confidence in VIADRUS a.s. In order to get used to a proper treatment of your new product from the start please read these instructions for its use (first of all the chapter no. 7 – Boiler attendance by user, chapter no. 11 – Important warnings and chapter no. 12 – Maintenance by user). Please observe the information given below in order to ensure a longstanding trouble-free operation of boiler so that both you and we are satisfied.
1. Produced variants of boiler
Order specification code
VIADRUS HERCULES Green Eco Therm X X
Burner output: 25: 25 kW
32: 32 kW
The fuel tank is included in the standard boiler accessories
Optional accessories (see chapter no. 5.2)
The boiler design you received is only destined for wooden pellets combustion (specification see page 4) and its trade name is VIADRUS HERCULES Green Eco Therm. It is the boiler with automatic fuel supply. The burner is cleaned manually. The boiler is manufactured as warm-water boiler with forced heating water circulation and working overpressure up to 400 kPa (4 bar). The boiler is tested for tightness by applying 800 kPa (8 bar) overpressure before despatch.
The use:
Type of burner: J: Junior
S: Senior
The version of boiler VIADRUS HERCULES Green Eco Therm 25X is particularly destined for heating
of individual housing units, weekend houses, cottages etc.
The version of boiler VIADRUS HERCULES Green Eco Therm 32X is particularly destined for heating
of cottages, weekend houses, small business premises, smaller leisure amenities etc.
Advantages of boiler:
automatic boiler operation guarantees the heating comfort, mechanical fuel feed from any reservoir automatic ignition simple, not time-consuming attendance and maintenance high efficiency reaching 87,9 %, boiler drum construction proven on a long-term basis high service life of the cast iron boiler drum five-year guarantee for the boiler drum
3
2. Technical data of the boiler
-
1
-
1
-1
-
1
Tab. no. 1 Dimensions, thermal parameters of boiler
VIADRUS HERCULES
Version of boiler
Green Eco Therm
25S 25J 32S 32J
Section number pcs 5 7 Class of boiler according to EN 303-5 - 4 3 3 4 Weight including the supplied fuel tank kg 332 401 Fuel tank weight on demand kg 65 65 Water space volume l 40,9 50,3 Diameter of smoke socket mm 156 156 Boiler dimensions (incl. burner): - height x width mm 1218 x 1309 1218 x 1309
- depth mm 1335 1527 Capacity of the supplied fuel tank dm3 130 130
kg 85 85
Fuel tank capacity on demand dm3 725 725
kg 470 470 Water operating overpressure kPa (bar) 400 (4) 400 (4) Testing water overpressure kPa (bar) 800 (8) 800 (8) Hydraulic loss (T 20 K) Pa 80 110 Recommended heat water operating temperature °C 60 - 80 60 - 80 Recommended return water operating temperature Noise level
°C 60 60
dB
Doesn´t exceed level
65 dB (A) Chimney draught mbar 0,15 - 0,25 0,20 - 0,30 Boiler connections - heat water G 1 1/2" G 1 1/2"
- return water G 1 1/2" G 1 1/2"
Connected voltage
Operating electric power/max.
W 100/1200 100/1200
1/N/PE 230 V AC 50 Hz
TN-S
Electric protection IP 20 IP 20
Tab. no. 2 Heat - technical parameters of the boiler
Version of boiler
Section number pcs 5 7 Nominal output kW 25 32 Minimum output kW 7,5 9,6 Efficiency % up to 86,8 up to 87,9 The approximate fuel consumption at rated output
The approximate fuel consumption at minimum output Burning time at nominal output - supplied tank / the tank by request. Burning time at minimum output - supplied tank / the tank by request
kg.h kg.h-1
h 14,17/78,33 10,625/58,75 h 60,7/335,71 35,42/195,83
Heating value MJ. kg Flue gas temperature °C 120 - 210 120 - 210 Flue gases mass flow rate at nominal output kg.s Flue gases mass flow rate at minimum output kg.s
Specified fuel:
VIADRUS HERCULES
Green Eco Therm 25X
5,8 8,2
1,74 2,45
17,189 17,189
0,018 0,021
0,009 0,014
The pellets must comply at least with one of the standards or regulations as follows:
Direction no. 14-2000 MŽP ČR DIN 517 31 ÖNORM M 7135
Specified pellets granularity: between 6 and 8 mm Maximum fuel water content. 12%. Ash content max. 1,5 %
WARNING! A poor quality of fuel can markedly negatively affect the boiler output and emission
parameters.
VIADRUS HERCULES
Green Eco Therm
Doesn´t exceed level
65 dB (A)
1/N/PE 230 V AC 50 Hz
TN-S
VIADRUS HERCULES
Green Eco Therm 32X
4
Hydraulic losses of boiler drum
3000
HERCULES Green Eco Therm 25X
[Pa]
z
p
2500
HERCULES Green Eco Therm 32X
2000
1500
1000
500
0
0 0,5 1 1,5 2 2,5 3 3,5 4
Q [dm3.s-1]
Version of boiler VIADRUS HERCULES Green Eco Therm 25X VIADRUS HERCULES Green Eco Therm 32X
L 1335 1527
L1 809 1001
Fig. no. 1 Boiler dimensions
5
3. Boiler description
3.1 Boiler drum construction
The cast iron section boiler drum is the main part of boiler and it is manufactured of grey cast iron according to EN 1561
central sections – quality 150 (previously ČSN 42 2415)
front and rear sections – quality 200 (previously ČSN 42 2420)
The pressure parts of boiler conform to the strength requirements according to EN 303-5. The boiler drum is assembled of sections by means of pressed on boiler insertions and secured by means of
anchor bolts. The sections create the combustion and ash-pan space, the water space and convection part. The inlet and outlet of heating water are situated in the rear part of boiler. The rear section of boiler in its upper part has a smoke extension piece and heating water flange, in the lower part there is the return water flange with a sleeve piece for inlet and outlet cocks. The cleaning door and ash door with mounted burner are affixed to the front boiler section. The whole boiler drum is insulated by means of a health harmless mineral insulation which reduces the losses caused by the heat transfer into ambient. The steel shell colour is treated by means of high-quality komaxit spray.
3.2 Control, regulation and safety elements
Elements for control, regulation and safety placed in the control cabinet
Thermomanometer serves for measuring the temperature and pressure of water in the heating system and is located in the upper part of the boiler shell. The check valve for pressure gauge connection is located in the upper part of the rear boiler section.
Operating thermostat switches off / switches on the operation of the burner according to the set temperature of heating water.
Signalling of safety thermostat signals the activation of the safety thermostat (overheating of the heating system above 97 °C)
The safety thermostat is placed in the control box and serves for ensuring the heating system against overheating. This thermostat is set by the manufacturer to a temperature of 95°C, i.e. to a higher temperature than can be set as the desired temperature on the boiler. When you turn off the safety thermostat unblocking must be done manually. The safety thermostat can be turned on only after the temperature has dropped below the set value. We have to unscrew the black cap of the safety thermostat and by using a suitable object we press the button. In case of repeated switching of the thermostat the boiler must be shut down and the reason of repeated overheating of the boiler must be found out. The thermostat of the pump switches on and switches off the pump of heating water according to the set temperature.
1. Termomanometer
2. Operating thermostat
3. The switch "start of burner"
4. Signalling of safety thermostat
5. Fuse 10A
6. Main switch
7. Safety thermostat
8. Thermostat of pump
Fig. no. 2 Control box
Elements for control, regulation and safety placed on the boiler body
The air rosette of cleaning door and the lower stifling element is not used at the boiler with an automatic combustion of wooden pellets and must be permanently closed.
6
Elements for control, regulation and safety placed on the burner
219
THERMAX
219
THERMAX
Control Module of boiler (version VIADRUS HERCULES Green Eco Therm XJ) or automatic (version VIADRUS HERCULES Green Eco Therm XS).
LCD display with control buttons, that is designed for change of the values of operating parameters (version VIADRUS HERCULES Green Eco Therm XJ).
Potentiometer – for setting the boiler output (version VIADRUS HERCULES Green Eco Therm XS).
Photo sensor, which monitors the intensity of the combustion process.
Transport hose with reinforcing spiral, which melts in the case of penetration of fuel back through the knee of burner, thus preventing further supply of pellets into the burner.
Sensor of penetration of fuel (TD) is placed on the knee of burner and is activated in case of the surface temperature above 90 °C. Burner and fuel feeder are stopped in case of activation of this sensor and the system is switched over into reporting of a failure. The failure mode is deactivated by switching off and on of the main switch. It is necessary to determine the cause of the failure and take appropriate measures, namely before restarting of the burner;
Reversible thermal label displays the operating temperature of the burner body. This temperature is an indicator for operating mode of the burner and temperature of flue gases which pass the combustion chamber back into the fuel tank. The initial state is shown in black colour for all thermally active parts. If the temperature is increased, the segments gradually are getting a light colour, according to the temperature range of individual heat-active segments. The reversible thermal label should be checked as needed. Increased temperature in this section signals the necessity to clean the boiler, grate of burner or routes of flue gasses and smoke flue. During cooling of the main burner body the colour of the label returns to its original state (all segments are black).
Irreversible thermal label displays overheating of the knee of burner. This label in case exceeding of temperature of the burner knee irreversibly changes its colour.
The initial status, the active segment is white, the temperature hasn’t reached the degree of activation 104 °C;
The status at activation, the active segment is dark, the temperature
104
°C
°F
has exceeded the degree for activation 104 °C; activation of 104 °C;
°C
°F
104
CAUTION:
Activation of irreversible thermal label is signalling overheating of the knee of burner. Status of this label is irreversible and in case of damage it has to be replaced. Control and service of burner may be performed only by an authorized technician.
This thermal label is activated for example when hot combustion products pass back via the fuel feeder due to an increased resistance of the smoke flue or a lower draft in the chimney. In such cases the transport hose that connects the fuel feeder and burner body can be damaged and will be necessary its replacement.
In case of these emergency statuses the warranty for the burner is void.
7
1. Boiler drum
2. Boiler shell with ashtray
3. Cleaning door
4. Burner
5. Transitionary flange
6. Insulation of burner
7. The ash door
8. Fuel tank
9. Fuel feeder
10. Transport hose with reinforcing spiral
11. Control box
12. Flange of heating water
Fig. no. 3 Boiler assembly
13. Flange of return water
14. Fill and drain cock
15. Sealing 90 x 60 x 3
16. Assembly of smoke adapter
17. Turbulators
18. Partition of flue way
19. Partition of the combustion chamber- the front section
20. Partition of the combustion chamber
21. Hose clamp
22. Screw M10 x 50
23. Screw M10 x 30
8
3.2 The construction of burner and transport routes of the fuel
The version VIADRUS HERCULES Green Eco Therm XJ
Control module with microprocessor;
LCD display with control buttons, that is designed for change of the values of operating parameters;
Version VIADRUS HERCULES Green Eco Therm XS
Control panel on which there is placed a potentiometer for setting the boiler output;
Colour scale on which we can set the position of throttle flap of the fan (the output power of fan) to the
same colour as the setting of the thermal output potentiometer.
Manual setting of throttle flap of the fan.
Version of boiler
Nominal heat output 25 25 32 32 power range 7,5 - 25 7,5 - 25 9,6 - 32 9,6 - 32
The burner consists of following components:
Combustion chamber, which serves for burning pellets and made from high quality stainless steel;
Removable grate of combustion chamber;
Electric spiral, by means of which the fuel is ignited. It is located behind the inclined plate of grate in the combustion chamber;
Fan for intake of air, equipped with Hall effect sensor for sensing the rotational speed;
Photo sensor, which monitors the intensity of the combustion process;
Sensor for penetration of burning fuel (TD) which stops the operation of the burner in case of break forth of flame into the fuel feeder;
Socket for connecting the fuel feeder, which ensures power supply into the motor of the fuel feeder;
Reversible thermal label from a liquid crystal with the indicator of current temperature of the
body of burner.
Irreversible thermal label from a liquid crystal which signals the high temperature of the knee of burner, preliminarily sets the conditions for the non-warranty service of the main module of burner and of any kind of damage to the hose for fuel supply;
Fuel feeder with an inlet cable and 1 ~ plug.
Transport hose with reinforcing spiral, which is made partly of a transparent heat-resistant material (in case of burning does not emit toxic substances and does not maintain the process of burning), that interconnects the fuel feeder and the knee of burner;
25J 25S 32J 32S
VIADRUS HERCULES Green Eco Therm
Fuel feeder
Fig. no. 4 Burner and fuel feeder
9
Transport hose with reinforcing spiral
Knee of the burner
Burner
Sensor for penetration of burning fuel (TD)
LCD display with control buttons Photo sensor
Combustion chamber Control module of boiler Transitionary flange for mounting the
burner to the door of boiler Inlet of electricity
Socket for connection of the fuel feeder
Fig. no. 5 Basic components of the burner of boiler VIADRUS HERCULES Green Eco Therm XJ
Control panel
Sensor for penetration of burning fuel (TD)
Photo sensor
Combustion chamber
Control module of boiler
Throttling flap of the fan Transitionary flange for mounting the
burner to the door of boiler Inlet of electricity
Fig. no. 6 Basic components of the burner of boiler VIADRUS HERCULES Green Eco Therm XS
10
Irreversible thermal label
Reversible thermal label with indicator of current temperature of the body of burner
Fig. no. 7 Positioning of thermal labels on the burner
4. Location and installation
4.1 Regulations and directives
The solid fuel boiler can only by mounted by a company holding a valid authorization to install these equipments. A project according to the valid regulations must be prepared for the installation. The heating system must be filled with water that matches the requirements of ČSN 07 7401 and especially its hardness must not exceed the required parameters.
Recommended values
Hardness mmol/l 1 Ca2+ mmol/l 0,3 Concentration of total Fe + Mn mg/l (0,3)*
*) Recommended value
WARNING!!! The use of anti-freeze mixture is not recommended by the manufacturer. a) to the heating system
ČSN 06 0310 Heating systems in buildings – Designing and installation ČSN 06 0830 Heating systems in buildings – protecting device ČSN 07 7401 Water and steam for thermal energy equipments with working pressure
up to 8 MPa.
EN 303-5 Boilers for central heating – Part 5: Solid fuel boilers for central heating with
manual or automatic feed and max. 500 kW nominal thermal output: terminology, requirements, testing and marking.
b) to the chimney
ČSN 73 4201 Chimneys and flue gas ducting– designing, implementation and connection of
fuel consumers.
c) regarding the fire regulations
ČSN 06 1008 Fire safety of heat installations. EN 13501-1 +A1 Fire classification of construction products and building elements – Part 1:
Classification using test data from reaction to fire tests
d) to the system of HWS heating
ČSN 06 0320 Heating systems in buildings – Hot water preparation – Designing and planning ČSN 06 0830 Heating systems in buildings – Safety devices. ČSN 75 5409 Water installations inside buildings.
e) regarding the electric network
CSN 33 0165 Electrical regulations. Identification of conductors by colours or numerals.
Procedure provisions
ČSN 33 1500 Electrical regulations; revision of electrical equipments
11
ČSN 33 2000-1 ed. 2 Low-voltage electrical installations – Part 1: Fundamental principles,
assessment of general characteristics, definitions.
ČSN 33 2000-4-41 ed. 2 Low voltage electrical installations - Part 4-
41: Protection for safety -
Protection against electric shock
ČSN 33 2000-5-51 ed. 3 Electrical installations of buildings – Part 5-51: Selection and erection of
electrical equipment – Common rules
ČSN 33 2130 ed. 2 Low-voltage electrical installations – Internal electric distribution lines ČSN 33 2180 Electrical regulations: Connection of electric instruments and appliances ČSN 34 0350 ed. 2 Safety requirements for flexibile cords and cables
EN 60079-10-1 Explosive atmospheres — Part 10-1: Classification of areas — Explosive gas
atmospheres
EN 60079-14 ed.3 Explosive atmospheres - Part 14: Electrical installations design, selection and
erection
EN 60252-1 ed. 2 Capacitors for AC motors – Part 1: In general – Design, testing, dimensioning
– Safety requirements – Instructions for installation and operation.
EN 60 335-1 ed.2 Electric appliances for household and similar purposes – Safety – Part 1:
General requirements
EN 60 335-2-102 Electric appliances for household and similar purposes – Safety – Part 2-102:
Special demands on appliances containing the electric connections and burning the gas, oil and solid fuels
EN 60445 ed. 4 Basic and safety principles for man-machine interface, marking and
identification – Identification of equipment terminals, conductor terminations and conductors
EN 61000-6-3 ed. 2 Electromagnetic compatibility (EMC) - Part 6-3: Generic standards – Emission
standard for residential, commercial and and light industrial environments
EN 61000-3-2 ed. 3 Electromagnetic compatibility (EMC) - Part 3-2: Limits - Limits for harmonic
current emissions (equipment input current 16 A per phase)
EN 61000-3-3 ed. 2 (ed. 3) Electromagnetic compatibility (EMC) - Part 3-3: Limits - Limitation of voltage
changes, voltage fluctuations and flicker in public low-voltage supply systems, for equipment with rated current 16 A per phase and not subject to conditional connection.
4.2 Positioning possibilities
Boiler positioning in the living space (including corridors) is prohibited! The installation of the boiler must comply with all requirements of ČSN 06 1008.
ATTENTION! In the event that it is installed the delivered wooden fuel reservoir, then it is necessary to install a
fireproof bulkhead between the reservoir and boiler.
Boiler placing with regard to fire regulations:
1. Placing on floor of flame resistant material (Fig. no. 8)
- boiler to be put on a flame resistant backing exceeding the boiler platform over 20 mm at sides and only on the boiler drum depth.
- if the boiler is situated in a cellar we recommend to place it on a bedding of minimum 50 mm height.
2. A safe distance from the combustible materials:
- when installing and operating the boiler it is necessary to keep a safety distance of 200 mm from the materials of combustibility grade A1, A2, B and C (D);
- for easily combustible materials of combustibility grade E (F), which quickly burn and burn themselves even after removal of ignition source (such as paper, cardboard, asphalt and tar paper, wood and wood-fiber boards, plastics, floor coverings) the safe distance has to be doubled, i.e. to 400 mm;
- safe distance should be doubled as bulb where the grade of reaction to fire has not been proved.
Tab. no. 3 Grade of reaction to fire
Grade of reaction to fire
A1 – incombustible A2 – combustible with difficulty B – hardly combustible C (D) – medium combustible
E (F) – easily combustible
Examples of building materials and products included in the reaction to fire
(Extract from EN 13 501-1 + A1)
Granite, sandstone, concrete, bricpcs, ceramic tiles, mortars, fireproof plasters, … acumin, izumin, heraklit, lignos, boards and basalt felt, fibreglass boards,... Beech and oak wood, hobrex boards, plywood, werzalit, umakart, sirkolit,... Pinewood, larch, whitewood, chipboard and cork boards, rubber flooring,... Asphaltboard, fibreboards, cellulose materials, polyurethane, polystyrene,
polyethylene, PVC,…
12
Section number
L [mm]
5 7
680 872
Fig. no. 8 Bedding dimensions
The boiler placing with respect to the necessary handling space:
basic surroundings of AA5/AB5 according to ČSN 33 2000-1 ed. 2;
handling space of minimum 1000 mm in front of the boiler must be maintained;
a minimum distance of 400 mm between the back part of the boiler and the wall;
from the side of the boiler there must be maintained a space at least 500 mm for the door opening and for the access to the rear part of the boiler;
a minimum distance of 100 mm from the side wall.
a minimum boiler-room height 2 100 mm
Fig. no. 9 Boiler placing in a boiler room
Fuel placing:
dry fuel (up to the 12% moisture) must be used in order to guarantee the correct combustion in the boiler. The pellets should be stored in their original packing from the manufacturer
(e.g. PET sacpcs) at a dry place;
it is impossible to store fuel behind the boiler or unload it next to the boiler in a distance smaller than 400 mm;
the manufacturer recommends that min. 1000 distance is kept between the boiler and fuel or the fuel is placed in a room different from that where the boiler is installed
13
Boiler positioning with regard to electricity network:
the boiler must be placed so that the plug in socket (230 V/50 Hz) is always accessible;
the boiler is connected to the mains by a fixed movable inlet with a normalized plug;
the electric shock prevention must be guaranteed according to valid EN (see chap. 4.1.)
A permanent air supply for combustion and ventilation must be guaranteed in the room where the boiler is installed (the air consumption of VIADRUS HERCULES Green Eco Therm 5X boiler amounts to approx. 80 m3.h-1, the air consumption of VIADRUS HERCULES Green Eco Therm 7X boiler amounts to approx. 160 m3.h-1.
The connection of heating system piping must be carried out by a person authorised according to the valid regulations.
.
CAUTION: When connecting the boiler to the heating system there must be installed a inlet and
outlet cocpcs in the lowest point and as near as possible to the boiler (at the return water flange).
5. Order, delivery and assembly
5.1 Order
In the order the following is needed to be specified:
1. Output and type of burner (see chap. 1)
2. Requirements for accessories offered on request
5.2 Delivery and accessories
Boiler VIADRUS HERCULES Green Eco Therm is supplied so that on a pallet there is placed the complete boiler drum and on the side there is attached the wrapped boiler shell. The accessories are stored inside the boiler drum and are accessible after opening the cleaning door. On the other pallet there is stored wooden fuel container, in which there is stored the burner, the fuel feeder and their accessories. The boiler is packed into a shipping container and must not be flipped during shipping; it is only permitted to tilt to the sides in order to remove the wrapping from the boiler drum.
Standard accessories to boiler:
Boiler with the appropriate number of boiler sections on the palette
Flange of heating water G 1 1/2" 1 pc
Return water flange G 1 1/2 "with socket Js 1/2" for the fill and drain cock 1 pc
Sealing φ 90 x 60 x 3 2 pcs
Washer 10,5 8 pcs
Nut M10 8 pcs
The fill and drain cock Js 1/2“ 1 pc
Three-position sump of thermostat G 1/2" 1 pc
spring of the capillary 1 pc
Blind plug Js 6/4“ 1 pc
Sealing 60 x 48 x 2 1 pc
The boiler shell including the ashtray and insulation in the adequate size
Fasteners for jacketing
-
console 1 assembly 2 pcs
-
console 2 assembly 2 pcs
-
washer 10,5 4 pcs
-
nut M10 4 pcs
-
connecting pin 4 pcs
-
screw M5 x 12 4 pcs
-
washer 5,3 4 pcs
-
screw into the plate ST 4,2 x 9,5 6 pcs
-
spring clamp 4 pcs
-
bushing PG 9 7 pcs
control box 1 pc
-
screw M5 x 12 4 pcs
-
serrated washer 5,3 4 pcs
cleaning equipment
-
hook 1 pc
-
brush with handle 1 pc
14
-
pike 1 pc
-
cleaning equipment holder 1 pcs
-
handling key 1 pc
turbulator 4 pcs
partition of combustion chamber – the front segment 1 pc
the partition of combustion chamber 4 pcs - 7 sect.
the partition of smoke channel 2 pcs
burner 1 pc
fasteners for mounting of burner and for mounting of a transitionary flange
-
screw M10 x 50 3 pcs
-
screw M10 x 30 3 pcs
-
spring washer 10 6 pcs
-
washer 10,5 6 pcs
-
nut M10 6 pcs
insulation of burner 1 pc
transitionary flange of the burner 1 pc
fuel feeder 1 pc
-
transport hose with reinforcing spiral 1 pc
-
hose clamp 2 pcs
fuel reservoir 1 pc
-
sloping bottom 2 pcs
-
flange of the fuel feeder 1 pc
fasteners for the fuel reservoir
-
screw M8 10 pcs
-
nut M8 10 pcs
-
washer 8,4 10 pcs
flexo cord 5 m 1 pc
boiler label 1 pc
business – technical documentation
Accessories delivered by request:
fuel reservoir 725 l
- the side of fuel reservoir 3 pcs
- the side of fuel reservoir with the hole for spiral worm 1 pc
- the foot of fuel reservoir 4 pcs
- the bottom of fuel reservoir 2 pcs
- the bottom of fuel reservoir A 2 pcs
- the cover of fuel reservoir 1 pc
- handle 1 pc
connection accessories for fuel reservoir assembly
- pendant chainlet 1 pcs
- screw M6 x 12 72 pcs
- washer 6,4 72 pcs
- nut M6 72 pcs
- screw M6 x 16 2 pcs
- washer 8,4 2 pcs
The boiler equipment delivered “by request“ is not included in the basic price of boiler
15
Loading...
+ 33 hidden pages