Veilux SVEX-HIR7 User Manual

SVEX-HIR7
Explosion Proof PTZ Camera
User Manual
www.veilux.net
SVEX-HIR7 Explosion Proof PTZ Camera
USER MANUAL
Copyright
©2013 Veilux Inc. All rights reserved.
Trademark
is the registered logo of Veilux Inc.
Disclaimer
Veilux Inc makes the best to verify the integrity and correctness of the contents in this document, but no formal guarantee shall be provided. Use of this document and the subsequent results shall be entirely on the user’s own responsibility. Veilux Inc reserves the right to change the contents of this document without prior notice.
-Design and specifications are subject to change without prior notice.
Copyright Notice
The content of manual book (including characters and pictures) owned Veilux. Neither person nor legal entity can‟t copy, translate, change or recompose without the permit by our company. The person who offends the copyright will be called to account by laws. Any specifications are subject to change without notice. The customers can get the latest information from http://veilux.net
Safety Guarantee
The running of equipment will be in accord with the following two demands
The running of the equipment won‟t result in any disturbance.
The running of the equipment won‟t be affected by exterior conditions, even from bad
influence.
Notice
The customer can‟t take apart the equipment, such as disassemble the top cover or
screws. It may leads to leak of water or electricity. Please operate the equipment under the demand of the manual book.
Please use the equipment under the demand of air pressure, environment temperature,
and humidity range in chapter 1.7.
Make sure use the power in accord with the nameplate of the equipment.
Inner and outer ground connection should be reliable.
Make sure the installation position is steady to avoid camera damage.
Thank you for choosing Veilux
Ex-proof
Please read the manual book before installation and application. Make
sure to obey the warning and keep the manual book well.
products.
Safety Instruction
The safety instruction of these series products
Ensure supply power same as nameplate marked before equipment being powered
Ensure supply a series long time, stable working power.
A 3 meters control cable is equipped when leaving factory. The ex-proof flexibility tube
will be used when the cable is connected with EX junction box.
All ex-proof parts are stable and complete enough for structure
Inside and outside ground connections are reliable.
Please tear off the plug if the product is not used for a long time.
Please communicate with technical person before maintaining the products.
Please shut off before maintenance and repair
Take care of products package for future shipment if necessary.
Ex-proof Structure Instruction
When we design the products, we have taken fully consideration of the situation that the
explosive air getting into ex-proof structure. The inner electric parts‟ working won‟t lead
to explosion in outside atmosphere. Key points such as housing intension, the joint
surface length of components and the Max. Surface temperature is all considered to
guarantee the explosion proof performance.
Enclosure shall burden water pressure testing for 1.5Mpa for 10~12 seconds without
leakage or shape change, which follows the requirement in GB3836.2-2000.
Max. PTZ surface temperature shall not be over 80 while it is working.
Tempered glass is used for window to burden impact and heat change testing.
The protection of housing is IP68.
Tightened nut is used for cable input to make cable tight and stable.
Content
1. BRIEF................................................................................................................................ 9
1.1
S
PECIFICATION
1.2
F
EATURE
.................................................................................................................
...........................................................................................................................
1.3 SCOPE OF APPLICATION ................................................................................................ 9
9
9
1.4 TECHNICAL
SPECIFICATION
.............................................................................................
10
1.5 MECHANICAL ............................................................................................................. 10
1.6 WORKING
CONDITION
..................................................................................................10
1.7 ENVIRONMENTAL ....................................................................................................... 11
1.8 ELECTRIC SAFETY (UNDER STANDARD AIR
PRESSURE
)..................................................
11
2. INSTALLATION AND DEBUGGING ........................................................................ 11
2.1 NOTICE BEFORE INSTALLING SVEX-HIR7 ................................................................. 11
2.2 SVEX-HIR7
INSTALLATION
........................................................................................ 13
2.2.1 Cable treatment................................................................................................... 13
2.2.1.1 Use ex-proof flexibility tube..................................................................................... 13
2.2.1.2 Use armored cable .................................................................................................. . 14
2.3 A
PPLICATION
.............................................................................................................. 14
2.3.1 System connection .............................................................................................. 14
2.3.2 Cable definition.................................................................................................. 15
2.3.3 Parameter set .................................................................................................... 15
2.3.3.1 Camera address set ................................................................................................... 15
2.3.3.2 Baud rate set ............................................................................................................ 16
2.3.3.3 Communication protocol set..................................................................................... 16
2.3.3.4 Remote communication set ...................................................................................... 16
2.3.4 Menu function .................................................................................................... 17
2.3.5 Control Signal Connection................................................................................. 17
2.3.6 Preparation and examination before power on ................................................. 18
2.4 SUPPORTING BRACKET PREPARATION BEFORE
INSTALLATION
.................................... 19
2.4.1 Wall mounting installation (P 2.4.1.1)............................................................... 19
2.5 ON SITE
INSTALLATION
............................................................................................... 20
2.5.1 Bracket mode installation (P2.5.1.1) ................................................................. 20
8
3. TROUBLE SHOOTING................................................................................................. 21
4. SHIPMENT AND STORAGE....................................................................................... 21
4.1 SHIPMENT NOTICE ...................................................................................................... 21
4.2 STORAGE DEMAND, PERIOD AND
NOTICE
.................................................................... 21
5. ATTACHED LIST ......................................................................................................... 22
5.1 CAMERA/OPTIC
DATA
...................................................................................................
22
1. BRIEF
9
As new monitoring equipment, SVEX-HIR7 explosion proof PTZ camera adopts advanced
production techniques and matured quality management system to make its quality,
performance and appearance a leading position in explosion proof monitoring products.
It can be used in flammable and explosive environment to realize monitoring purpose.
Strictly according to Standards of GB3836.1-2000 GB3836.1—2000 Electrical apparatus for
explosive atmosphere: General requirements, GB3836.2-2000 Electrical apparatus for
explosive atmosphere: Flameproof „d‟ and GB12476.1-2000 Electrical apparatus for explosive
dust: Using enclosure and limiting surface temperature for protecting electrical apparatus
Chapter 1: Technical requirements, this camera owns advantage of small volume, light weight
and easy installation features and could be used in petroleum, chemical industry, jetty, port,
mine, space, army and foodstuff area.
1.1 Specification
Model SVEX-HIR7
IP level IP68
Ex-marking ExdCT6 / DIP A20 TA, T6
Camera model Sony
1.2 Feature
SVEX-HIR7 adopts advanced color camera, speed pan/tilt and decoder. It is integrated with
multiple communication protocol and baud rate. It will play an important role in several types
of safety system.
SVEX-HIR7 has wide voltage scope; it can automatically detect several kinds of camera. It has
power, signal, and video trebling lightning protection, safer and reliable.
SVEX-HIR7 adopts integrated structure design. There is no cable connected between pan/
tilt and camera. The pan rotation is 360° continuous, tilt rotation is .±90°. They are
equipped with sunshield, wiper and auto heat equipment.
1.3 Scope of application
It could be widely used in zone, for gas area and A20A22 dust area.
1.4 Technical specification
10
Pan speed 0.1°40°/S smooth variable speed Tilt speed 0.1°40°/S smooth variable speed
Preset speed 60°/S
Preset quantity 128
Preset position error 0.1 °
Surge protection signal/video/power surge protection module integrated Auto- heater work while under -10
1.5 Mechanical
Material Stainless steel 304
Pan rotation 360° continuous Tilt rotation +90°-90°
Unit weight 29Kgnet weight
Shipment weight 32Kggross weight
Mounting Base, ceiling mounting
Face
view
P 1.5.1.1 Product Dimension
Side
view
1.6 Working condition
Input voltage 100 240 VAC
Max current ≤1A
Power ≤100W
Electrical connection 3 meters composite cable
Communication type RS-485 Baud rate 1200240048009600bps4800bps as default
Communication protocol PELCO-PPELCO-DPELCO-D as default
11
Address code 1~2551 as default
1.7 Environmental
Air pressure 86 106 KPa Environment temperature -40℃ ~ +60 Relative Humidity U95 %RH +25℃) Environment Min. illumination Sony FCB-EX480CP 0.7LuxC/ 0.01LuxB/W
1.8 Electric safety (under standard air pressure)
Insulating resistanceOver 100 MΩ resistance between power input terminal and housing;
Power frequency withstand voltagepower input terminal and housing can bear 50Hz, 2000V
voltage power frequency voltage for one minute without breakdown or flashover.
2. INSTALLATION AND DEBUGGING
2.1 Notice before installing SVEX-HIR7
Check all parts in packing before installation
SVEX-HIR7 PTZ1 unit Sunshield 2 units
Hexagonal bolt M16×303 pcs
12
Brass screw 1/4″×61 pc Brass screw 1/4″×121 pc
Flat gasket Ø16 3 pcs
Spring washer Ø16 3 pcs
Desiccant, 1 pc Teco521 special grease, 1 unit
The tools and other parts which will be used
Special wrench, 1 pc
Cross screwdriver 6×150, 1 unit External hexogen wrench 300×36, 1unit
Notice before installation and application
13
Customer cant disassemble product without permit. Follow the demand of manual book.
Power supply must be in accord with chapter 1.4.
Make sure to operate the equipment under the specified conditions in chapter 1.5.
Debug the products first if possible before on-site installation.
2.2 Installation
2.2.1 Cable treatment
2.2.1.1 Use ex-proof flexibility tube
As P2.2.1.1, put on the Ex-proof flexibility part to cable, remove the tighten nut, keep the
original gasket and rubber loop (or use the spare parts).
Ex-proof
Flexible
Tube
Screw Joint Rubber Loop
As P2.2.1.2, firstly turn tight the screw connection head and then tight the EX-proof
flexibility tube.
Ex-proof
Flexible
Tube
Gasket Cable Outlet
P 2.2.1.1
Cable Outlet
P 2.2.1.2
Cable
Installation & product debugging | 13
2.2.1.2 Use armored cable
14
As P 2.2.1.3, remove proper length cable protection cover and cut off not used part.
Armored cable
Protection Cover
Steel
Cable inner layer
belt
Cable core wire
Rubber
Nut
Loop
Sealing
Ex-proof Gland Parts
Bushing
Gasket
Taper Volt
Bushing
Connection
P 2.2.1.3
As P2.2.1.4, install Ex-proof Gland to Armored Cable
Armored cable Out Cover
Finished Gland Cable Inner Layer
Screw Thread
P 2.2.1.4
Armored cable with ex-proof Gland could connect with any ex-proof equipment directly.
2.3 Application
2.3.1 System connection
Video Signal could connect with multiple equipment‟s, such as monitor for display, DVR for
P 2.3.1.1 System Connection
VERSION1.0
PROTOCOLPELCO-P
BAUD:4800
CAMERA
ID001
record or video server for network transmission or matrix for switch and management. Video
Composite Cable
Name
Power cable
Control (shielded)
Video cable
Function
L wire
N wire
Earth wire
RS485-A
RS485-B
SYV-75-2
coaxial cable
Color
Brown
Grey
Yellow/Green
Red
Blue
15
distributor can distribute and amplify the video signal.
All control equipment could control this Camera under the same control protocol. Some
Matrix may need protocol converter; some DVR may need RS232-RS485 level converter.
Normally one RS485 Bus only permits one host controller. So if several host controllers want
to control simultaneously, users‟ authority can be used.
2.3.2 Cable definition
While camera leaves factory, we supply a Composite Cable* with camera, the cable goes out
from Camera bottom with length at least 2 meters. So while connecting the system, just
connect the cable with junction box.
(*Composite Cable: A special cable, one Composite Cable includes one group power, one group control and one group video, it is generally used in Industrial CCTV system.)
T 2.3.2.1 Cable Definition
2.3.3 Parameter set
Parameter setting method: open top cover with special wrench and set the address, baud rate,
communication protocol by dip switch K1K2K3K4K5. Re power on if the setup is
changed.
The version number, control protocol, baud rate and address of camera will be displayed
each time when energized as following:
Version Protocol Baud rate
Address
2.3.3.1 Camera address set
Camera address adopts decimal system. Normally address has been set down before camera leaving factory, K1K2K3 should be set by address. K1 stands for unit digit, K2 for
tens place, K3 for hundreds place.
For example: if the camera address is 1, K1 is 1, K2 is 0 and K3 is 0.
Dip switch
Hundred place
Tens place
Unit place
K3K2K1
Address No
001
Dip switch
Hundred place
Tens place
Unit place
K3K2K1
Address No
118
K4 value
Baud rate
0
Remote communication setting
1
12002240034800
4
9600
K5 value
Protocol
1
PELCO-P
2
PELCO-D
16
For example: if the camera address is 118, K1 is 8, K2 is 1 and K3 is 1.
2.3.3.2 Baud rate set
Please set correct baud rate as follow:
T 2.3.3.1 Baud rate set
2.3.3.3 Communication protocol set
Ensure the communication protocol of the controller. Set K5 as following table.
T 2.3.3.2 Communication protocol set
2.3.3.4 Remote communication set
When K4 sets 0, we can remotely set equipment address, control protocol and baud rate.
(Right now the default baud rate is used, which is displayed when system is power on). At this
time, all setting with K1, K2, K3 and K5 cannot work. The On-screen-display menu can be
reached by following procedure: run No.95 Preset, press “MAIN MENU” “CONTROL”
“RS485”.
2.3.4 Menu function
17
The camera has the menu function. Enter the menu model: invoke main menu by running No.
95 preset when the system is ready. After menu displays, pan/tilt up, down, left, right, aperture
OPEN, CLOSE become menu control key. At this time, the other key can‟t work. All “<>”mark
means there is submenu. The present page menu is selected by up, down key. The
parameter is controlled by left and right key. “OPEN” means “OK”. Press “OPEN” key to enter
next menu. If the menu item is selected, the menu will glitter.
If the system is scanning model, left down corner will display “RETURNCLOSE”. Please
press “aperture close” to exit, then the camera can be controlled.
2.3.5 Control Signal Connection
While this system works at industrial site, it must go with explosion proof Junction box, in
which we can make the connection of cables of video, control and power.
While the control signal and camera goes as STAR type connection, we shall use control
code distributor, at this time each communication board of camera shall use a 120Ohm resistor to connect Side A and B (Change DIP on the RS485 communication board ON),
A B
Camera
Camera
Camera
Camera
While Control Signal Source connection with Camera as Chrysanthemum type, just to
Gnd
A B
Gnd
A B
Gnd
A B
Gnd
120Ω
120Ω
120Ω
120Ω
P 2.3.5.1. Camera STAR Connection
ada120Ohm resistor to the end of camera Side A and B.(to get rid of others JMP1 on
communication board)
A B Gnd
A B Gnd
A B Gnd
A B
Gnd
Control
code
A B
Gnd
A B
Gnd
Control
signal
source
Camera Camera Camera
18
A B Gnd A B Gnd
A B Gnd
Control
P 2.3.5.2. Camera Connection of Chrysanthemum
A B Gnd
120Ω
2.3.6 Preparation and examination before power on
Check if power, RS485 control and video cable are connected correctly. Check the dip switch
settings.
2.4 Supporting bracket preparation before installation
19
2.4.1 Wall mounting installation (P 2.4.1.1)
Make a mount hole at proper level and fix the
bracket with screw. Junction Box shall be installed
for easy operation and maintenance. Cable gets
through the cable slot and connects the junction
box.
See P2.4.1.2 for the mounting base specification.
P 2.4.1.1 Bracket and junction installation
SVEX junction box
Bracket
Cable slot
Wall
P 2.4.1.2 Bracket foundation mounting
specification size
2.5 On site installation
20
Because of the particularity of the ex-proof product, test and debug the camera first if
possible before on site installation.
2.5.1 Bracket mode installation (P2.5.1.1)
Refer to P2.4.1.2 for camera mounting
holes, and make the camera cable go through
cable hole on the bracket until reaching Junction
Box. Use ex-proof flexibility tube for protection or
armored cable. The cable which connects
junction box with control room must be metal
tube or armored cable
SVEX-HIR7 PTZ Camera
P 2.5.1.1 SVEX-HIR7 bracket installation
3. TROUBLE SHOOTING
Problems
Reason
Method
No action or no image
after power on
Power off
Make sure the power is ok
Power line without good
connection
Check the power line
Inner power damage
Contact the factory and replace
Self-check is ok, but no
image
Coaxial-cable wrong
connection
Check coaxial cable
Coaxial-cable in bad
connection
Check coaxial cable
Camera damage
Contact the factory and replace
Sometimes no image
Video cable in bad
connection
Check the Video Cable
Self-check is ok, but
control error
Bad connection of Signal
cable
Check Signal Cable connection
Not correct Address
Re-set refer to Manual book
Not correct Protocol
Not correct Baud rate
Control error
Self-check error
Power on again
Control signal line in bad
connection
Check control line connection
Loading too much
Add control code distributor
Too long communication
distance
Add repeaters to make
communication distance longer
21
4. SHIPMENT AND STORAGE
4.1 Shipment notice
Without rain or snow falling directly to product, packed product can be shipped by any way.
4.2 Storage demand, period and notice
It can be stored for one year under 0~+40 and less than 90% humidity.
Product maintenance, storage and shipping | 21
5. ATTACHED LIST
22
5.1 Camera/Optic data
The two following integrated cameras are typical. The other types can be used after
Veilux confirmation.
-------------------------------------------------------------------------------------------------------
Brand SONY
Mode PAL / NTSC
CCD 1/4″ Exview HAD CCD
Line/Frame scan 15.625 KHz/ 50Hz
Lens High performance /18X optic zoom / auto focus / F1.4~3.0, f=4.1
73.8mm /12 digital zoom
Min focus 0.29m (wide/ 0.8mtel View angle 48°wide/ 2.8°tel Min Lux 0.7Luxcolor/ 0.01Luxb/w
SNR > 50dB
Video output BNC / 1.0Vp-p / 75Ω
6. GUARANTEE
For any camera produced by VEILUX, INC, we promise one year warranty.
During warranty, we supply free service except following situations:
User does not operate as manual book requires
User un-install the whole product by themselves
23
Lightning or Act of God
If there are additional agreements between VEILUX, INC and buyer, then agreements shall be strictly done.
7. STATEMENT
VEILUX, INC. owns the final design changing and final specification rights and no responsibility to
inform user
This manual book belongs to VEILUX, INC. rights, without permits or any book inform, any company
or private copy of whole or part of the book shall be prohibited.
802 Greenview Dr. Suite 200 Grand Prairie, TX 75050 USA Toll free: 1-800-510-6528 Direct: (+1) 214 635-4855 sales@veilux.net www.veilux.net
Loading...