1. Keep boiler area clear and free from combustible
materials, gasoline and other flammable vapors
and liquids.
2. DO NOT obstruct air openings to the boiler
room.
3. Modification, substitution or elimination of factory equipped, supplied or specified components
may result in property damage, personal injury or
the loss of life.
4. TO THE OWNER - Installation and service of this
boiler must be performed by a qualified installer.
5. TO THE INSTALLER - Leave all instructions with
the boiler for future reference.
6. When this product is installed in the Commonwealth of Massachusetts the installation must be
performed by a Licensed Plumber or Licensed
Gas Fitter.
The following defined symbols are used throughout this manual
to notify the reader of potential hazards of varying risk levels.
DANGER
!
Indicates an imminently hazardous situation
Which, if not avoided, will result in death, serious
injury or substantial property damage.
WARNING
!
Indicates a potentially hazardous situation which,
if not avoided, could result in death, serious injury
or substantial property damage.
CAUTION
!
Indicates a potentially hazardous situation which,
if not avoided, could result in minor or moderate
injury or property damage.
WARNING
!
All installations of boilers and venting should be
done only by a qualified expert and in accordance
with the appropriate manual. Installing or venting
a boiler or any other gas appliance with improper
methods or materials may result in serious injury or
death due to fire or to asphyxiation from poisonous
gases such as carbon monoxide which is odorless
and invisible.
C.S.A. Certified
For Natural Gas Or Propane
2
Tested For 100 LBS.
ASME
Working Pressure
Page 3
RATINGS & DATA - NATURAL GAS & PROPANE GAS
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
(1) **
I
=B=R
NetOutput
Btu/Hr
37,000243
55,000365
72,000481
Boiler
No.
(1)
A
.G.
Btu/Hr.
5050,000
7575,000
100100,000
A
.
I
nput
(1)
Heating
C
apacity Btu/Hr.
42,000
63,000
83,000
125125,000104,00090,000603
150150,000124,000108,000
175175,000143,000124,000829
200200,000165,000143,000957
250250,000205,000178,000
300299,999243,000214,0001368
EXPLANATORY NOTES
--All boilers are design certified for installation on noncombustible floor.
--For installation on combustible floors use combustible floor kit.
--Recommended chimney height 20 feet. In special cases where conditions
permit, chimney height may be reduced to 10 feet. Refer to the latest
revision of NFGC part 11.
--Electric service to be 120 Volts, 15 Amps, 60 Hz.
--The MEA number for the this boiler is 19-79-E.
(1) For elevations above 2000 feet, ratings should be
reduced at a rate of 4% for each 1000 feet above sea
level.
(2) Base on 170° temperature in radiators.
(3) Tank sized for non-ferrous baseboard or radiant panel
systems. Increase size for cast iron baseboard and
radiation.
--Net I=B=R ratings include 15% allowance for normal
piping and pick-up load. Manufacturer should be
consulted on installations having other than normal piping
and pick-up requirements.
** For equivalent square feet of radiation, divide I=B=R
output by 150.
STANDARD EQUIPMENT: Boiler Jacket, Cast Iron Boiler
Battery, High Limit Control, Vent Damper Relay, Theraltimeter
Gauge, Circulator With Return Piping To Boiler, Main Gas
Burners, Combination 24 Volt Gas Control (Includes Automatic
Gas Valve, Gas Pressure Regulator, Automatic Pilot, Safety
Shutoff, Pilot Flow Adjustment, Pilot Filter), A.S.M.E. Relief
Valve, Drain Cock, Spill Switch, Rollout Switch, Automatic Vent
Damper. Not Shown Are: Wiring Harness, Thermocouple,
Non-linting Safety Pilot.
OPTIONAL EQUIPMENT: Intermittent Electric Ignition
Pilot System.
(2)
NetRating
Sq. Ft. HW
@ 170
o
719
1189
No.
of
Burners
1
2
2
3
3
4
4
5
6
(3)
Recommended
A
ir
C
ushion
T
ank
152.4
15
304.0
305.6
305.6
307.2
307.2
30
6010.4
Water
C
ontent
(Gals.)
4.0
8.8
Boiler No.
50
75
100
125
150
175
Natural Gas
I
nlet*
½"
A
11⅛"
½"157
½"157
½"
½"
18⅞"
18⅞"
½"22¾
200½"22¾"11 ½"8"30¾"38¾"8"1¼"
250¾"
265
13
300¾"30½"15¼"9"30¾"42¾"10"1¼"
* Propane gas inlet, all units, 1/2"
"11
⁄
"
16
Dimensions
B
5
½
"4"30¾"36¼"6"
½
"5"30¾"37¾"6"
½
"6"30¾"37¼"6½"
9
½
"6"30¾"37¼"6½"
9
½
"7"30¾"37¾"7"
½
"7"30¾"38¾"7"1¼"
CDE
F
Pump size Supply &
Return
13¼"8"30¾"40¾"8"
3
T
appings
1¼"
1¼"
1¼"
1¼"
1¼"
1¼"
Page 4
INSTALLATION PROCEDURE
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
WARNING
!
Improper installation, adjustment, alteration, service or maintenance can cause
injury or property damage.
The installation must conform to the requirements of the
1.
authority having jurisdiction or, in the absence of such
requirements, to the latest revision of the National Fuel
Gas Code, ANSI Z223. (Available from the American Gas
Association, 8501 E. Pleasant Valley Road, Cleveland,
Ohio 44134). Reference should also be made to local gas
utility regulations and other codes in effect in the area
in which the installation is to be made. When installed
in Canada: The latest revision of the CAN1-B149.1 and/
or B149.2 Installation Codes for Gas-Burning Equipment
and/or local codes.
2.
Where required by the authority having jurisdiction, the
installation must conform to American Society of Mechanical Engineers Safety Code for Controls and Safety
Devices For Automatically Fired Boilers, ANSI/ASME
No.CSD-1.
3.
This boiler series is classified as a Category 1 and the
vent installation shall be in accordance with Part 7 of the
National Fuel Gas Code noted above when installed in
the United States. In Canada refer to the CAN1-B149.1
and or B149.2 Installation Codes for Gas-Burning Equipment. Also refer to applicable provisions of the local building codes.
4.
This boiler has met safe lighting and other performance
criteria with the gas manifold and control assembly on the
boiler per the latest revision of ANSI Z21.13/CGA 4.9.
The boiler shall be installed such that the gas ignition
5.
system components are protected from water (dripping, spraying, rain, etc.) during appliance operation and
service, (circulator replacement, condensate trap, control
replacement, etc.).
Locate boiler on level, solid base as near the chimney
6.
as possible and centrally located with respect to the heat
distribution system as practical.
Allow 24 inches at the front and right side for servicing
7.
and cleaning.
When installed in a utility room, the door should be wide
8.
enough to allow the largest boiler part to enter, or to
permit replacement of another appliance such as a water
heater.
FOR INSTALLATION ON NON-COMBUSTIBLE
9.
FLOORS ONLY - For installation on combustible flooring
special base must be used. (See Replacement Parts Section.) The boiler can not be installed on carpeting. Minimum clearances to combustible construction are:
TOP ........................................................... 18 IN.
FRONT ...............................................ALCOVE *
FLUE CONNECTOR ................................... 6 IN.
REAR ...........................................................4 IN.
CONTROL SIDE .......................................... 9 IN.
OTHER SIDE ............................................... 3 IN.
NOTE: Greater clearances for access should supersede
fire protection clearances.
* The definition of an Alcove is a three sided space with no
wall in front of the boiler. The ANSI standard for an alcove is
18 inches from the front of an appliance to the leading edge of
the side walls as shown below.
Minimum Clearances to Combustible Construction (as
seen from above)
4"
9"
BOILER
18"
3"
4
Page 5
VENTILATION & COMBUSTION AIR
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
WARNING
!
Air openings to combustion area must not be obstructed. By following the instructions below,
adequate combustion air can be maintained.
COMBUSTION AIR REQUIREMENTS
(Minimum Square Inches Requirement)
Unconfined Area*Confined Area**
Inside
Model
* A space whose volume is not less than 50 cubic feet per 1000 BTU per hour of all
appliances installed in that space (cubic feet of space = height x width x length)
** A space whose volume is less than 50 cubic feet per 1000 BTU per hour of all
appliances installed in that space (cubic feet of space = height x width x length)
1.
Combustion Air
No.
1 Sq. In./1000
Btu/Hr.
(Fig. #3)
50100101325
75100151938
100100202550
125125253263
150150303875
175175354488
2002004050100
2502505063125
3003006075150
Ventilation of the boiler room must be adequate to provide
Outside
Combustion Air
1 Sq. In./5000
Btu/Hr.
(Fig. #4)
Outside Combustion Air
Vertical Ducts
1 Sq. In./4000
BTU/Hr.
Horizontal Ducts
1 Sq. In./2000
BTU/Hr.
sufficient air to properly support combustion per the latest
revision of the National Fuel Gas Code, ANSI Z223.1.
Figure #1
CHIMNEY OR
TYPE B VENT PIPE
When a boiler is located in an unconfined space in a
2.
building or conventional construction frame, masonry or
metal building, infiltration normally is adequate to provide
air for combustion and ventilation. However, if the equipment is located in a building of tight construction (See the
National Fuel Gas Code, ANSI Z223.1 latest revision), the
boiler area should be considered as a confined space.
In this case air for combustion and ventilation shall be
provided according to Step 5. If there is any doubt, install
air supply provisions in accordance with the latest revision
of the National Fuel Gas Code.
When a boiler is installed in an unconfined space in a
3.
building of tight construction, air for combustion and ventilation must be obtained from outdoors or from spaces
freely communicating with the outdoors. A permanent
opening or openings having a total free area of not less
than 1 square inch per 5000 Btu per hour of total input
rating of all appliances shall be provided. Ducts may be
used to convey makeup air from the outdoors and shall
have the same cross-sectional area of the openings to
which they are connected.
4.
When air for combustion and ventilation is from inside
buildings, the confined space shall be provided with two
permanent openings, one starting 12 inches from the
top and one 12 inches from the bottom of the enclosed
space. Each opening shall have a minimum free area
of 1 square inch per 1000 Btu per hour of the total input
rating of all appliances in the enclosed space, but must
not be less than 100 square inches. These openings must
freely communicate directly with other spaces of sufficient
volume so that the combined volume of all spaces meets
the criteria for an unconfined space. (Figure #1)
5.
When the boiler is installed in a confined space and all air
is provided from the outdoors the confined space shall be
provided with one or two permanent openings according
to methods A or B. When ducts are used, they shall be
of the same cross sectional area as the free area of the
area of the openings to which they connect. The minimum
dimension of rectangular air ducts shall be not less than 3
x 3 inches or 9 square inches.
When installing two openings, one must commence with-A.
in 12 inches from the top and the other within 12 inches
from the bottom of the enclosure. The openings shall
communicate directly, or by ducts, with the outdoors or
spaces (crawl or attic) that freely communicate with the
outdoors. One of the following methods must be used to
provide adequate air for ventilation and combustion.
5
Page 6
VENTILATION AND COMBUSTION AIR
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
When directly communicating with the outdoors, each
1.
opening shall have a minimum free area of 1 square inch
per 4,000 Btu per hour of total input rating of all equipment in the enclosure. (Figure #2)
Figure #2
CHIMNEY OR
TYPE B VENT
PIPE
If horizontal ducts are used, each opening and duct shall
3.
have a minimum free area 1 square inch per 2,000 Btu
per hour of total input rating of all appliances in the enclosed space. (Figure #4)
Figure #4
CHIMNEY OR
TYPE B VENT
PIPE
When communicating with the outdoors by means of
2.
vertical ducts, each opening shall have a minimum free
area of 1 square inch per 4,000 Btu per hour of total input
rating of all appliances in the enclosed space. (Figure #3)
Figure #3
CHIMNEY OR
TYPE B VENT
PIPE
(DUCT ENDS 1 FT.
ABOVE THE FLOOR)
One permanent opening, commencing within 12 inches A.
of the top of the enclosure, shall be permitted where the
equipment has clearances of at least 1 inch from the
sides, 1 inch from the back, and 6 inches from the front
of the boiler. The opening shall directly communicate
with the outdoors or shall communicate through a vertical or horizontal duct to the outdoors or spaces (crawl
or attic) that freely communicate with the outdoors. The
openings must have a minimum free area of 1 square
inch per 3000 Btu per hour of the total input rating of all
equipment located in the enclosure. The free area must
be no less than the sum of the areas of all vent connectors in the confined space.
In calculating free area using louvers, grilles or screens
4.
for the above, consideration shall be given to their blocking effect. Screens used shall not be smaller than 1/4 inch
mesh. If the free area through a design of louver or grill is
known, it should be used in calculating the size opening
required to provide the free area specified. If the design
and free area is not known, it may be assumed that wood
louvers will have 20-25% free area and metal louvers and
grilles will have 60-75% free area. Louvers and grilles
should be fixed in the open position or interlocked with the
boiler so they are opened automatically during the boiler
operation.
6
Page 7
CONNECTING SUPPLY & RETURN PIPING
EXPANSION
TANK
CHECK
VALVE
B
D
FEED
WATER
C
RETURN PIPING
FROM HEATING
AND COOLING
ELEMENT
WATER
CHILLER
SUPPLY PIPING
TO HEATING
AND COOLING
ELEMENT
CIRCULATOR
A
PRESSURE
REDUCING
VALVE
PROPER
BACKFLOW
PROTECTION
DEVICE
GATE
VALVE
PURGE
VALVE
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
IMPORTANT: Circulators in the following illustrations are mounted on the system supply side, but
mounting on the system return side is also acceptable practice.
Figure #5
Connect supply and return piping as suggested in Figure
1.
#5 when the boiler is used in connection with refrigerated
systems.
The chilled medium MUST BE PIPED IN PARALLEL A.
with the boiler.
Use appropriate valves to prevent the chilled medium B.
from entering the heating boiler.
Maintain a minimum clearance of one inch to hot water C.
pipes.
2.
When the boiler is connected to heating coils located in air
- During heating cycle open valves A and B, close
valves C and D.
- During cooling cycle, open valves C and D, close
valves A and B.
handling units where they may be exposed to refrigerated
air circulation, the boiler piping system MUST BE supplied with flow control valves or other automatic means
to prevent gravity circulation of the boiler water during the
cooling cycle.
Hot water boilers installed above radiation level must be
3.
provided with a low water cut-off device.
When a boiler is connected to a heating system that
4.
utilizes multiple zoned circulators, each circulator must
be supplied with a flow control valve to prevent gravity
circulation.
Hot water boilers and system must be filled with water
5.
and maintained to a minimum pressure of 12 pounds per
square inch.
7
Page 8
CONNECTING SUPPLY AND RETURN PIPING
BOILER
WATER INLET
ALTERNATE
CIRCULATOR
LOCATION
TO SYSTEM
FROM SYSTEM
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
3 WAY MIXING
VALVE
AIR SEPARATOR
HOSE BIB
EXPANSION
TANK
BOILER
ALTERNATE
CIRCULATOR
LOCATION
TO SYSTEM
FROM SYSTEM
V2V1
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
AIR SEPARATOR
ZONE VALVE
EXPANSION
TANK
WATER INLET
SYSTEM
CIRCULATOR
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Figure #6
BYPASS PIPING -
AUTOMATIC MIXING VALVE
Bypass piping is an option which gives the ability to adjust
6.
the supply boiler water temperature to fit the system or
the condition of the installation. This method of piping,
however, is not typically required for baseboard heating systems. Typical installations where bypass piping is
used are as follows:
This method is used to protect boilers from condensation A.
forming due to low temperature return water. Generally
noticed in large converted gravity systems or other large
water volume systems. (Figure #6)
These methods are used to protect systems using radi-B.
ant panels and the material they are encased in from
8
BYPASS PIPING -
FIXED LOW TEMP ONLY
high temperature supply water from the boiler and protect the boiler from condensation.
NOTE#1: When using bypass piping, adjust
valves V1 & V2 until desired system temperature
is obtained.
NOTE#2: Bypass loop must be same size piping
as the supply and return piping.
7. Installation using circulators and zone valves are shown
in Figures #7-#10. For further piping information refer
to the I=B=R Installation and Piping Guide.
Page 9
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
BOILER
ZONE 4
DHW CIRCULATOR
WATER INLET
CIRC 2
CIRC 3
CIRC 4
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
AIR SEPARATOR
ZONE VALVE
HOSE BIB
FLOW CONTROL
VALVE
EXPANSION
TANK
BOILER
DHW
CIRCULATOR
CH CIRCULATOR
PRIORITY ZONE
CIRCULATOR
EXPANSION
TANK
WATER INLET
FLOW CONTROL
VAVLE
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
AIR SEPARATOR
ZONE VALVE
HOSE BIB
CONNECTING SUPPLY AND RETURN PIPING
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Figure #7
SINGLE ZONE SYSTEM WITH
DHW PRIORITY
MULTIZONE SYSTEM WITH CIRCU-
LATORS AND DHW PRIORITY
Figure #8
9
Page 10
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
BOILER
WATER INLET
ZONE 4
*USE FULL PORT ZONE
VALVE.
DHW
CIRCULATOR
CH
CIRCULATOR
CIRCULATOR
FLOW CONTROL
VALVE
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
BALL VALVE
AIR SEPARATOR
ZONE VALVE
HOSE BIB
EXPANSION
TANK
ZONE 3
ZONE 2
ZONE 1 (PRIORITY ZONE)
BOILER
WATER INLET
CH & DHW
SYSTEM
CIRCULATOR
*USE FULL PORT ZONE
VALVE. FOR OPTIMUM TANK
PERFORMANCE, CONSIDER
USING ZONE CIRCULATOR
(SEE FIGURE 5)
ZONE 4
CIRCULATOR
SHUT-OFF
VALVE
PRESSURE
REDUCER VALVE
CHECK VALVE
EXPANSION
TANK
AIR SEPARATOR
ZONE VALVE
HOSE BIB
FLOW CONTROL
VALVE
CONNECTING SUPPLY AND RETURN PIPING
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
MULTIZONE SYSTEM WITH
ZONE VALVES AND DHW PRIORITY
(WITH CIRCULATOR)
Figure #9
MULTIZONE SYSTEM WITH
ZONE VALVES AND DHW PRIORITY
(WITH ZONE VALVE)
Figure #10
10
Page 11
VENT INSTALLATION
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
WARNING
!
All installations of boilers and venting should be done only by a qualified expert and in accordance
with the appropriate manual. Installing or venting a boiler or any other gas appliance with improper
methods or materials may result in serious injury or death due to fire or to asphyxiation from poison-
ous gases such as carbon monoxide with is odorless and invisible.
WARNING
!
This boiler shall not be connected to any portion of a mechanical draft system operating under
positive pressure.
Connect flue pipe from draft hood to chimney. Bolt or
The vent pipe must slope upward from the boiler not less
1.
then ¼ inch for every 1 foot to the vent terminal.
Horizontal portions of the venting system shall be sup-
2.
ported rigidly every 5 feet and at the elbows. No portion of
the vent pipe should have any dips or sags.
This boiler series is classified as a Category 1 and the
3.
vent installation shall be in accordance with latest revision
of the National Fuel Gas Code noted above or applicable
provisions of the local building codes.
Inspect chimney to make certain it is constructed ac-
4.
5.
screw joints together to avoid sags. Flue pipe should
not extend beyond inside wall of chimney. Do not install
manual damper in flue pipe or reduce size of flue outlet
except as provided by the latest revision of ANSIZ223.1.
Protect combustible ceiling and walls near flue pipe with
fireproof insulation. Where two or more appliances vent
into a common flue, the area of the common flue must
be at least equal to the area of the largest flue plus 50
percent of the area of each additional flue.
cording to NFPA 211. The vent or vent connector shall
be Type B or metal pipe having resistance to heat and
corrosion not less than that of galvanized sheet steel or
aluminum not less than 0.016 inch thick (No. 28 Ga).
VENT SYSTEM MODIFICATION
When an existing boiler is removed from a common venting system, the system is likely to be too large for the proper
venting of the appliances still connected to it. If this situation
occurs, the following test procedure must be followed:
REMOVAL OF BOILER FROM VENTING SYSTEM
At the time of removal of an existing boiler, the following steps
shall be followed with each appliance remaining connected
to the common venting system placed in operation, while the
other appliances remaining connected to the common venting
system are not in operation.
1.
Seal an unused opening in the common venting system.
Visually inspect the venting system for proper size and
2.
horizontal pitch and determine there is no blockage or restriction, leakage, corrosion and other deficiencies which
could cause an unsafe condition.
Insofar as is practical, close all building doors and win-
3.
4.
5.
6.
7.
dows and all doors between the space in which the
appliances remaining connected to the common venting
system are located and other spaces of the building. Turn
on clothes dryers and any other appliance not connected
to the common venting system. Turn on any exhaust fans,
such as range hoods and bathroom exhausts, so they
operate at maximum speed. Do not operate a summer
exhaust fan. Close fireplace dampers.
Place in operation the appliance being inspected. Follow
the lighting instructions. Adjust thermostat so appliance
will operate continuously.
Test for spillage at the draft hood relief opening after 5
minutes of main burner operation. Use the flame of a
match or candle, or smoke from a cigarette, cigar or pipe.
After it has been determined that each appliance remaining connected to a common venting system properly
vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas
burning appliances to their previous condition of use.
Any improper operation of the common venting system
11
Page 12
VENT SYSTEM MODIFICATION
LOCKNUT
HARNESS
CONN.
DAMPER
CONN.
INSTALLER
HOOK-UP
INSTALLER
HOOK-UP
DAMPER
MOTOR
DAMPER
DAMPER
WIRE
HARNESS
FACTORY
WIRED
VENT OUTLET
AQUASTAT
VENT
ACCEPTABLE VENT
DAMPER LOCATIONS
UN-ACCEPTABLE
DAMPER LOCATIONS
BOILER
HOT WATER HEATER
CHIMNEY
INSTALLATION
POSITION OF DAMPER
X
MANUFACTURER'S
REFER TO DAMPER
INSTRUCTIONS FOR
CONTROL BOX
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
should be corrected so the installation conforms with
the latest revision of the National Fuel Gas Code, ANSI
Z223.1. When resizing any portion of the common venting
system, the common venting system should be resized to
approach the minimum size as determined using the appropriate tables in the latest revision of the National Fuel
Gas Code, ANSI Z223.
VENT DAMPER INSTALLATION & INSTRUCTIONS
DAMPER INSTALLATION
NOTE: Refer to Figure #11 for steps 1-6.
Figure #11
DAMPER INSTRUCTIONS
Ensure that only the boiler is serviced by the Vent Damp-
1.
er. (Figure #12)
Figure #12
Place Vent Damper on or as close to vent outlet of boiler
1.
as possible. (Figure #12)
Remove Vent Damper Motor cover.
2.
Feed damper wire harness connector through bracket
3.
hole on Damper Motor frame.
Tighten locknut onto Damper wire harness connector.
4.
Plug Damper connector into socket on Damper Motor
5.
frame.
Replace Damper Motor cover and wire Damper in accor-
6.
dance with Figure #11.
12
Clearance of not less than 6 inches between Vent
2.
Damper and combustible material must be maintained.
Additional clearance should be allowed for service of Vent
Damper.
Vent Damper must be in the open position when appli-
3.
ance main burners are operating.
The Vent Damper position indicator must be in a visible
4.
location following installation.
5.
The thermostat's heat anticipator must be adjusted to
match the total current draw of all controls associated with
the boiler during a heating cycle.
Page 13
CONNECTING GAS SERVICE
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Connect gas service from meter to control assembly in
1.
accordance with ANSI Z223.1 and local codes or utility.
A ground joint union should be installed for easy removal
of gas control for servicing. A drip leg or trap must be
installed at the bottom of a vertical section of piping at the
inlet to the boiler. A pipe compound resistant to the action
of liquified petroleum gases must be used on all threaded
pipe connections. Check with the local utility for location
of manual shutoff valve if required. (
Figure #13
)
Figure #13
MAXIMUM CAPACITY OF PIPE IN CUBIC FEET OF GAS/HOUR
(Gas Pressure = 0.5 psig or less, Pressure Drop = 5 in. w/c)
Length of
Pipe (Feet)
101753606801400
20120250465950
3097200375770
4082170320660
6066138260530
8057118220460
10050103195400
For additional information refer to the National Fuel Gas Code
Handbook.
To check for leaks in gas piping, use a soap and water
3.
½”¾”1”1¼”
Nominal Iron Pipe Size
solution or other approved method.
WARNING
!
Do not use an open flame!!
4.
The gas line should be of adequate size to prevent undue
2.
pressure drop and never smaller than the pipe size of the
main gas control valve. (See Chart)
Electrical wiring must conform with the National Electrical
Code, ANSI/NFPA No 70 latest edition when installed in the
United states, the CSA C22.1 Canadian Electrical Code, Part
1, when installed in Canada, and/or the local authority having
jurisdiction.
WARNING
!
When an external electrical source is utilized,
the boiler, when installed, must be electrically
grounded in accordance with these require-
ments.
1.
2.
3.
4.
5.
Disconnect boiler from gas supply piping system during
any pressure testing of the gas piping. After reconnecting,
leak test gas connection and boiler piping before placing
boiler back into operation.
Natural GasPropane
IMPORTANT: Install a fused disconnect
switch between boiler and electric panel at a
convenient location.
THERMOSTAT INSTALLATION
Thermostat should be installed on an inside wall about
four feet above the floor.
NEVER install a thermostat on an outside wall.
Do not install a thermostat where it will be affected by
drafts, hot or cold pipes, sunlight, lighting fixtures, televisions, a fireplace, or a chimney.
Check thermostat operation by raising and lowering thermostat setting as required to start and stop the burners.
Instructions for the final adjustment of the thermostat are
packaged with the thermostat (adjusting heating anticipator, calibration, etc.)
13
Page 14
WIRING DIAGRAM - 24V STANDING PILOT
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
VR8200ORVR8300
14
Page 15
WIRING DIAGRAM - INTERMITTENT IGNITION
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
15
Page 16
LIGHTING INSTRUCTIONS
INLETOUTLET
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
WARNING
!
IF YOU DO NOT FOLLOW THESE INSTRUCTIONS EXACTLY, A FIRE OR EXPLOSION MAY RESULT,
CAUSING PROPERTY DAMAGE, PERSONAL INJURY OR LOSS OF LIFE.
Before any procedures are attempted on this appliance, it is necessary to determine if the ignition system
is electric or standing pilot. If you are uncertain, contact the manufacturer before proceeding.
WARNING
!
Before lighting any type of pilot burner (standing
or intermittent), make certain the hot water boiler
and system are full of water to minimum pressure
of 12 lbs. per square inch in the system, and also
make certain that the system is vented of air. Set
the operating control of thermostat to a “below”
normal setting. Refer to the following appropriate
lighting instruction.
LIGHTING PROCEDURE FOR BOILER WITH
OPERATING INSTRUCTIONS FOR INTERMITTENT
PILOT SYSTEM
STOP! Read the safety information in the User’s Informa-
1.
tion Manual.
Set the thermostat to lowest setting.
2.
Turn off all electric power to the appliance.
3.
This appliance is equipped with an ignition device which
4.
automatically lights the pilot. Do not try to light the pilot by
hand. (Figure #14)
Figure #14
INTERMITTENT PILOT SYSTEM
For Your Safety, Read Before Operating!!
A. This appliance is equipped with an ignition device
1.
which automatically lights the pilot. Do not try to light the
appliance by hand.
B. Before operating, smell all around the appliance area
2.
for gas. Be sure to smell next to the floor because some
gas is heavier than air and will settle on the floor.
CAUTION
!
WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switches; do not
use any phones in your building.
• Immediately call your gas supplier from a
neighbor’s phone. Follow the gas supplier's
instructions.
• If you cannot reach your gas supplier, call
the fire department.
C. Use only your hand to push in or turn the gas control
knob. Never use tools. If the knob will not push in or turn
by hand, don’t try to repair it. Call a qualified service
technician. Force or attempted repair may result in a fire
or explosion.
D. Do not use this appliance if any part has been under
water. Immediately call a qualified service technician
to inspect the appliance and to replace any part of the
control system and any gas control which has been under
water.
Turn gas control knob clockwise
5.
Wait (5) minutes to clear out any gas. If you then smell
6.
gas, STOP! Follow “What To Do If You Smell Gas” in the
safety information above. If you don’t smell gas, go on to
the next step.
Turn gas control knob counterclockwise
7.
Turn on all electric power to the appliance.
8.
Set thermostat to desired setting.
9.
If the appliance will not operate, follow the instructions
10.
“
To Turn Off Gas To Appliance
service technician or your gas supplier.
to “OFF.”
to “ON.”
” and call a qualified
16
Page 17
LIGHTING INSTRUCTIONS
INLET
GAS CONTROL KNOB
PRESSURE REGULATOR
ADJUSTMENT BENEATH
COVER SCREW
PILOT FLOW ADJ. SCREW
BENEATH COVER SCREW
OUTLET
PRESSURE
TAP
TAP
PRESSURE
INLET
GAS
INLET
GAS
OUTLET
TH/TR
ON
OFF
PILOT
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
LIGHTING PROCEDURE FOR BOILER WITH
CONTINUOUS PILOT
For Your Safety, Read Before Lighting!!
Read the warning at the beginning of "
1. Lighting Instructions
."
This appliance has a pilot which must be lighted by hand.
2.
When lighting the pilot, follow these instructions exactly.
Before lighting, smell all around the appliance area for
3.
gas. Be sure to smell next to the floor because some gas
is heavier than air and will settle on the floor. See section
"
What To Do If You Smell Gas
4.
Use only your hand to push in or turn gas control knob or
."
reset button. Never use tools. If the knob or reset button
will not push in or turn by hand, don’t try to repair it, call
a qualified service technician. Force or attempted repair
may result in a fire or explosion.
5.
Do not use this appliance if any part has been under water. Immediately call a qualified service technician to inspect the appliance and to replace any part of the control
system and any gas control which has been under water.
LIGHTING INSTRUCTIONS FOR CONTINUOUS PILOT
STOP!
1.
Read the safety information at the beginning of
these instructions.
2.
Set the thermostat to the lowest setting.
Turn off all electric power to the appliance.
3.
Remove access panel and burner door.
4.
Turn gas control knob clockwise
5.
to "OFF." (Fig-
ures #15 and #16)
Figure #15
Figure #16
NOTE: Some gas control knobs cannot be turned from "PILOT"
to "OFF" unless knob is pushed in slightly. DO NOT FORCE.
Wait (5) minutes to clear out any gas. If you then smell
6.
gas, STOP! Follow "
you don't smell gas, go to the next step.
7.
Find pilot. Follow metal tube from gas control. Depending
on the model of the boiler, pilot is either mounted on the
base or on one of the burner tubes.
Turn gas control knob counterclockwise
8.
LOT."
Push in gas control knob or reset button if so equipped,
9.
all the way in and hold. Immediately light the pilot with a
match. Continue to hold the gas control knob or reset button in for about 1 minute after the pilot is lit. Release knob
or button, and it will pop up back up. Pilot should remain
lit. If it goes out, repeat steps 5 through 9.
If knob or button does not pop up when released, stop •
and immediately call a qualified service technician or
your gas supplier.
What To Do If You Smell Gas
to "PI-
." If
17
If the pilot will not stay lit after several tries, turn the gas •
control knob clockwise
to "OFF." Call a qualified
service technician or your gas supplier.
Replace burner door.
10.
Turn gas control knob counterclockwise
11.
Replace access panel.
12.
Turn on all electric power to the appliance.
13.
Set thermostat to desired setting.
14.
to "ON."
TO TURN OFF GAS TO THE APPLIANCE
Set the thermostat to lowest setting.
1.
2. Turn off all electric power to the appliance if service is
2.
to be performed.
3. Push in gas control knob slightly and turn clockwise
3.
to "OFF." DO NOT FORCE.
4. Call a qualified service technician.
4.
Page 18
NORMAL SEQUENCE OF OPERATION
BURNERS
ORIFICES
GAS VALVE
INTEGRAL DRAFT
HOLD DOWN
BOLT
BLOCKED VENT
SAFETY SWITCH
BURNER DOOR
BLOCKED VENT
SAFETY SWITCH
JACKET BASE
PANEL
ROLL-OUT SAFETY
SWITCH
MANIFOLD
BASE
HOOD
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
On a call for heat, the thermostat will actuate,
completing the circuit to the control. The completed
circuit to the control will first activate the circulator
and damper which will close an end switch inside
the damper. This action will complete the circuit to
the ignition system and ignition will take place.
In the event the boiler water temperature exceeds
the high limit setting on the boiler mounted high
limit control, power will be interrupted between the
control system and the ignition system. The power
will remain off until the boiler water temperature
drops below the high limit setting. The circulator
will continue to operate under this condition until
the thermostat is satisfied.
In the event the flow of combustion products through
the boiler venting system becomes blocked, the
blocked vent safety switch will shut the main burner
gas off. Similarly, if the boiler flueway becomes
blocked, a flame rollout safety switch will shut the
main burner gas off. (Figure #17) If either of these
conditions occur, DO NOT ATTEMPT TO PLACE
THE BOILER BACK INTO OPERATION. CONTACT A CERTIFIED SERVICE AGENCY.
Figure #17
GENERAL INSTRUCTIONS
Before seasonal start-up, have a certified service agency
check the boiler for soot and scale in the flues, clean the burners and check the gas input rate to maintain high operating
efficiency.
CAUTION
!
Label all wires prior to disconnection when
servicing controls. Wiring errors can cause
improper and dangerous operation.
Verify proper operation after service.
The service agency or owner should make certain the system
is filled with water to minimum pressure and open air vents, if
used, to expel any air that may have accumulated in the system. Check the entire piping system and, if any leaks appear,
have them repaired.
Circulators need to be checked and maintained. Refer
to the circulator manufacturer's instructions.
The venting system should be inspected at the start of each
heating season. Check the vent pipe from the boiler to the
chimney for signs of deterioration by rust or sagging joints.
Repair if necessary. Remove the vent pipe at the base of the
chimney or flue and using a mirror, check vent for obstruction
and make certain the vent is in good working order.
The boiler flue gas passageways may be inspected by a light
and mirror. Remove the burner door. (
Figure #20
) Place a
trouble lamp in the flue collector through the draft relief opening. With the mirror positioned above the burners, the flue gas
passageways can be checked for soot or scale.
The following procedure should be followed to clean the flue
gas passageways:
1.
Remove the burners from the combustion chamber by
raising the burners up from the manifold orifices and pulling toward the front of the boiler. (
Disconnect the vent pipe from the draft hood.
2.
Remove the top jacket panel.
3.
Remove the combination flue collector and draft hood
4.
Figure #20
)
from the boiler castings by loosening the nuts on the hold
down bolts located on each side of the collector. (
#17
)
Place a sheet of heavy paper or similar material over the
5.
Figure
bottom of the base and brush down the flue passageways. The soot and scale will collect on the paper and is
easily removed with the paper.
18
Page 19
GENERAL INSTRUCTIONS
GAS VALVE
KNOB
ORIFICES
"52.%23
IGNITION ELECTRODE
3/8” TO 1/2”
IN FLAME
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
With the paper still in place in the base, clean the top of
6.
the boiler castings of the boiler putty or silicone used to
seal between the castings and flue collector. Make certain
that chips are not lodged in the flue passageways.
When the cleaning process is complete, restore the boiler
components to their original position. Use IS-808 GE silicone
(available from a distributor) to seal around the flue collector
and boiler castings.
A visual check of the main burner and pilot flames should be
made at the start of the heating season and again in midseason. The main burner flame should have a well defined
inner blue mantel with a lighter blue outer mantel. Check the
burner throats and burner orifices for lint or dust obstruction.
Figures #19 and #20
(
)
Figure #19
Figure #21
Figure #20
To adjust the pilot flame, remove the pilot adjustment cover
screw (Figures #14 - #16 on previous pages) and turn the
inner adjustment screw counterclockwise
or clockwise
to decrease pilot flame. Be sure to replace
to increase
cover screw after adjustment to prevent possible gas leakage.
The burners and pilot should be checked for signs of corrosion, rust or scale buildup. The area around the boiler must
be kept clear and free of combustible materials, gasoline and
other flammable vapors and liquids.
The free flow of combustion and ventilating air to the boiler
and boiler room must not be restricted or blocked.
It is recommended that a qualified service agency be employed to make an annual inspection of the boiler and heating system. They are experienced in making the inspections
outlined above, and, in the event repairs or corrections are
necessary, trained technicians can make the proper changes
for safe operation of the boiler.
The pilot flame should envelop ⅜ to ½ inch of the tip of the
pilot thermocouple, ignition/sensing electrode or mercury sen-
sor. (
Figure #21
)
BURNER
DOOR
19
Page 20
CHECKING GAS INPUT RATE TO BOILER
GAS VALVE
BURNER ACCESS
DOOR
HIGH LIMIT
AND OPERATING
CONTROL
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Gas input to the boiler can be adjusted by removing the
protective cap on the pressure regulator
and turning the screw clockwise
counterclockwise
to decrease input. The manifold
(Figures #14-#16)
to increase input and
pressures are taken at the outlet side of the gas valve.
Figure #15 and #16
(
) To check for proper flow of natural
gas to the boiler, divide the input rate shown on the rating
plate by the heating value of the gas obtained from the
local gas company. This will determine the number of cubic
feet of gas required per hour. With all other gas appliances
off, determine the flow of gas through the meter for two
minutes and multiply by 30 to get the hourly rate. Make
minor adjustments to the gas input as described above.
Burner orifices should be changed if the final manifold
pressure varies more than plus or minus 0.3 inches water
column from the specified pressure.
Primary air adjustment is not necessary, therefore air
shutters are not furnished as standard equipment. Air
shutters can be furnished on request where required by
local codes or conditions.
Figure #22
CHECK SAFETY CONTROL CIRCUIT after burner
adjustments are made for satisfactory operation.
1. Pilot: With main burner operating, turn the pilot
gas adjusting screw clockwise
until pilot gas
is turned off. (Figures #14-#16 on previous pages)
Within 90 seconds the main gas control should close,
shutting off the gas to the main burner.
2. High Limit Control (Figure #22): Remove cover and
note temperature setting. Decrease this setting to
minimum and operate boiler. When the boiler water
temperature exceeds the control temperature setting,
the control will open the circuit, closing the automatic
main gas valve.
20
Page 21
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
21
Page 22
REPLACEMENT PARTS - BASE
1
2
3
4
5
6
7
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Item
#
BURNER TUBE 1 1/2"
BURNER TUBE 1 1/2"
BURNER TUBE 1 1/2"
1
BURNER TUBE 1 1/2"
BURNER TUBE 1 1/2"
BURNER TUBE 1 1/2"
BASE W/INSUL
BASE W/INSUL
BASE W/INSUL
2
BASE W/INSUL
BASE W/INSUL
BASE W/INSUL
BURNER DOOR -
BURNER DOOR -
BURNER DOOR -
3
BURNER DOOR -
BURNER DOOR -
BURNER DOOR -
MANIFOLD - 50356-2-1.01
MANIFOLD - 75&100356-2-1.02
MANIFOLD - 125&150356-2-1.03
4
MANIFOLD - 175&200356-2-1.04
MANIFOLD - 250356-2-1.05
MANIFOLD - 300356-2-1.06
DescriptionPart #Qty.
- 50
- 75, 1002
- 125, 1503
- 175, 2004
- 2505
- 3006
- 50
- 75, 100
- 125, 150
- 175, 200
- 250
- 300
50
75, 100
125, 150
175, 200
250
300
240005543
5611601
5611602
5611603
5611604
5611605
5611606
3261201
3262701
3262801
32621001
32621002
32621003
Item
#
1
1
1
1
5
SCREW ¼ - 20 X ½ SELF TAPHW-005.01
GAS VALVE VR8200H
GAS VALVE VR8200H - 50 - 300 24V LP
GAS VALVE VR8204H - 50 - 150 SPARK NAT
6
GAS VALVE VR8304H4 - 175-300 SPARK NAT
GAS VALVE VR8304 - 50-300 SPARK LP
GAS VALVE VR8300H4 - 250 & 300 24V NATVG01201
GAS VALVE VR8300H4 - 175 & 200 24V NATVG01202
ORIFICE 3.2mm NAT - 50, 100, 150, 200, 250, & 300
ORIFICE 3.0mm NAT - 175240007404
ORIFICE 2.9mm NAT - 125240007403
7
ORIFICE 2.8mm NAT - 75
ORIFICE #47 LP - 50, 100, 150, 200, 250, & 300
ORIFICE #49 LP - 125&175355-1-5.06
ORIFICE #50 LP - 75355-1-5.07
COMBUSTIBLE BASE FLOORING - 50
COMBUSTIBLE BASE FLOORING - 75, 100
COMBUSTIBLE BASE FLOORING - 125, 150
COMBUSTIBLE BASE FLOORING - 175, 200
NOT SHOWN
COMBUSTIBLE BASE FLOORING - 250
COMBUSTIBLE BASE FLOORING - 300
*
Orifice Quantities: Model 50 - qty 1; Model 75 & 100- qty 2; Model 125 & 150-
qty 3; Model 175 & 200- qty 4; Model 250- qty 5; Model 300- qty 6.
DescriptionPart #Qty.
4
-
50 - 150 24V NATVG-003.05
VG00307
VG01101
VG01103
VG01104
240007406
240007402
355-1-5.04
325-2-8.01
325-2-8.02
325-2-8.03
325-2-8.04
325-2-8.05
325-2-8.06
1
*
1
22
Page 23
1
2
3
4
5
6
7
8
9
REPLACEMENT PARTS - HEAT EXCHANGER
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
ItemPart No.DescriptionQty.
1HW06901Nut 5/16 - 18 Wislock6
14605001Tie Rod - ¼” x 7¼” (045)
HW-011.01Tie Rod - ¼” x 11½” (070, 096)
HW-011.03Tie Rod - ¼” x 15½” (120, 145)
2
HW-011.05Tie Rod - ¼” x 19½” (175, 195)
HW-011.07Tie Rod - ¼” x 23” (245)
HW-011.09Tie Rod - ¼” x 27” (295)
3HW-003.02Nut ¼”-20 Hex2
4HW-008.01Washer - 5/16” Flat4
5100-2-3.01Right Hand Section1
Center Section (075, 100)1
6100-2-1.01
Center Section (125, 150)2
Center Section (175, 200)3
Center Section (250)4
Center Section (300)6
ItemPart No.DescriptionQty.
7100-2-2.01 Left Hand Section1
Push Nipple 2” Mach. (050)2
Push Nipple 2” Mach. (075, 100)4
2
843300976
93461601 Baffle (075 & 175 Only)2
100-2-7.01Heat Exchanger (3 Section)
100-2-7.02Heat Exchanger (4 Section)
100-2-7.03Heat Exchanger (5 Section)
100-2-7.04Heat Exchanger (6 Section)
100-2-7.05Heat Exchanger (7 Section)
100-2-7.06Heat Exchanger (2 Section)
Push Nipple 2” Mach. (125, 150)6
Push Nipple 2” Mach. (175, 200)8
Push Nipple 2” Mach. (250)10
Push Nipple 2” Mach. (300)12
Fully Assembled Heat Exchangers
23
Page 24
2
3
4
5
6
7
8
9
1
10
REPLACEMENT PARTS - JACKET
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Item
#
PANEL - TOP 5031621501
PANEL - TOP 75 & 10031621502
PANEL - TOP 12531621503
1
PANEL - TOP 15031621504
PANEL - TOP 175 & 20031621505
PANEL - TOP & 25031621506
PANEL - TOP & 30031621507
PANEL - LEFT 250-3003162704
PANEL - LEFT (L)50-2003162706
2
PANEL - LEFT (L)250-3003162707
PANEL - LEFT 50-2003162708
DRAFT DEFLECTOR 503162501
DRAFT DEFLECTOR 75/1003162502
DRAFT DEFLECTOR 125/1503162503
3
DRAFT DEFLECTOR 175/2003162504
DRAFT DEFLECTOR 2503162505
DRAFT DEFLECTOR 3003162506
PNL LWR ACCES 503161101
PNL LWR ACCES 75/1003161102
PNL LWR ACCES 125/1503161103
4
PNL LWR ACCES 175/2003161104
PNL LWR ACCES 225/2503161105
PNL LWR ACCES 275/3003161106
PANEL - BASE 503161201
PANEL - BASE 75 & 1003161202
PANEL - BASE 125 & 1503161203
5
PANEL - BASE 175 & 2003161204
PANEL - BASE 2503161205
PANEL - BASE 3003161206
DESCRIPTIONPart NumberQty.
1
1
1
1
1
Item
#
PANEL - RIGHT 50-2003162705
6
PANEL - RIGHT 225-3003162703
PANEL - REAR 503162601
PANEL - REAR 75 & 1003162602
PANEL - REAR 125 & 1503162603
7
PANEL - REAR 175 & 2003162604
PANEL - REAR 2503162605
PANEL - REAR 3003162606
FLUE COL 503462101
FLUE COL 1003462102
FLUE COL 1503462103
FLUE COL 2003462104
FLUE COL 2503462105
8
FLUE COL 3003462106
FLUE COL 1253462107
FLUE COL 753462108
FLUE COL 175
DAMPER 4" 50240006936
DAMPER 5" 75240006937
DAMPER 6" 100 & 125240006938
9
DAMPER 7" 150 & 175240006939
DAMPER 8" 200 & 250240006940
DAMPER 9" 300240006941
PNL- UPPER ACCESS 5031621201
PNL- UPPER ACCESS 75&10031621202
PNL- UPPER ACCESS 12531621203
PNL- UPPER ACCESS 15031621204
10
PNL- UPPER ACCESS 175 & 20031621205
PNL- UPPER ACCESS 225 & 25031621206
PNL- UPPER ACCESS 275 & 30031621207
DESCRIPTIONPart NumberQty.
1
1
1
3462109
1
1
24
Page 25
REPLACEMENT PARTS - PILOT
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
1
2
3
SPARK PILOT
ItemPart No.DescriptionQty.
1109007296PILOT BRACKET ASSEMBLY1
2HW-005.01BRACKET SCREW2
3240007093SPARK CABLE1
4
414615005
PB-001.02Natural Gas Q345A PILOT
5
240007096LP Q345A Pilot
* Included with #3 - Pilot Tube Assembly Kit (above)
PILOT TUBING, 1/8" x 24"
1
1
5
1
5
2
CONTINUOUS PILOT
ItemPart No.DescriptionQty.
1109007296PILOT BRACKET ASSEMBLY1
2HW-005.01BRACKET SCREW2
31520001THERMOCOUPLE Q3091
414615005
14662098Natural Gas Q314A PILOT
5
240007285LP Q314A Pilot
* Included with #3 - Pilot Tube Assembly Kit (above)
PILOT TUBING, 1/8" x 24"
1
1
3
4
25
Page 26
REPLACEMENT PARTS - PIPING & CONTROLS
1
2
16
8
4
5
6
7
10
11
12
13
14
15
17
3
9
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
ITEMDESCRIPTIONP/NQTY.
1WIRE ROLLOUT/SPILL 28"375133012
2HARNESS IGN TO G/V 18"374136021
3PILOT IGNITION CABLE 30"PB007021
4PIPE - NPL 1.1/4X4.1/2 NPTPF-006.071
5DRAIN - SHORTHW-016.031
6PIPE - TEE 1.1/4X3/4X1.1/4PF-008.031
7PIPE - 1.1/4" CLOSE NPLPF-006.011
8WIRE LOW VOLTAGE/DAMPER375-1-14.011
9HARNESS CIRCULATOR 72"375195011
10CONTROL L8148E1257 (AQUASTAT)10100021
11RELIEF VALVE 30#VR-001.011
12WELL 3/4"X3"AQ-020.011
13GAUGE - THERALTIMETERGA-001.001
14PIPE - NPL 3/4"X4"PF-005.111
15PIPE - ELBOW 3/4" 90°PF-002.041
16CLAMP #3600 WHITEEF036012
17PLT SPARK CTRL S8600PB006041
26
Page 27
ROLLOUT & SPILL SWITCH
1
2
3
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
Item #DescriptionPart #Qty.
TEMP. SENSOR BRACKET3262001
1
CONTROL-FIXED TEMPERATURE
2
THERMO (ROLLOUT SWITCH)
3
SCREW - #6 X ¼ HEX HDHW06501
The rollout switch is located on the base and flue collector.
NOTE: The quantities above are for each switch.
AQ02101
1
1
2
27
Page 28
National Excelsior Company
www.excelsiorhvac.com
Subject to change without notice.
P.O. Box 4729
Utica, NY 13504-4729
Loading...
+ hidden pages
You need points to download manuals.
1 point = 1 manual.
You can buy points or you can get point for every manual you upload.