Univex DS12 Installation Manual

univex
INSTRUCTION MANUAL
PIZZA XPRESS
DOUGH SHEETER
PATENTED
MODEL DSI2
MODEL DS'14
PiZZA AND BREAD DOUGH WITHOUT HEATING IT
3 OId Rockingham Rd.
Salem, NH 03079
MODEL DS18
Tel. 603-8936191 Fax 603893-1249
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
TABLE OF CONTENTS
A)
i .
EMPLOYMENT OF THE MACHiNE
2. WORKING PLACES
i STARTINGUP
5 TRANSPORTATION .
6. INSTALLATION
7
7J ASSEMBLING
7.2 DISASSEMBLING
PAGE 3
PAGE 3
PAGE 3
PAGE 3
PAGE 3
.
PAGE 4 PAGE 4
B)
9
9A MAINTENANCE
ELECTRICAL SCHEME
PAGE 5
PAGE 10
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
PIZZA XPRESS
DOUGH SÑEETER
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
A)
L EMPLOYMIENT OF TUF
The Pizza Xpress machine has been
MACBJNE
dough for pizza and bread. The
which is similar to the one by hand
Warning: Do not introduce into
which are not foreseen in these
2. WORKING PLACES
The machine has to be placed
Working: The Cover H (Drawing
G must always stay
on this cover.
mentioned parts. We bring to
very dangerous part of the machine; i.e.,
hands into the funnel,
nor use resistant ghves which
STARTiNG UP
The machine is provided with
voltage and the frequency
is grounded and properly
grade.
on a horizontal working plane and be used by
your notice that through the Funnel G
a onephase motor. Before connecting the. machine,
correspond to those indicated
protected from overloading. The operation circuit
designed and manùfaetured to laminate (at
dough is flattened between two pairs
with a rolling pin, does not alter the
the machine frozen, haif4rozen
instructions.
2, Page 6) must always be placed
on the machine, and the Funnel
It is forbidden to work with the machine
you can reach with your hands a
the upper rollers. We remind
can be seized by the rollers while woring.
on the machine data plate, and that the intake
room temperature) the
of rollers.
dough.
This lamination,
dough, or other products
a single person.
without the two above
you to neither introduce your
be sure that the
has lIP 55 protection
USE
4. 1 See Drawing 2 and the enclosed
spec sheet.
4.2 Dust your hand with flour take the
with the palm of your hand
approximately .06 - .08 inch thick.
4.3 Start the machine with Switch F and
4.4 Introduce the dough (slightly dusted
4.5 After a few seconds, the dough
pulling it.
on a flourcovered work surface in order to get
will come out from the lower rollers; guide the dough
TRANSPORTATION
The machine is packed into
wooden pallet and fixed with hoop-iron.
a cardboard box and, on request, all cardboard packages
iNSTALLATION
6. 1 Place the machine far from
be higher than 13 1°F.
any heat sources. The temperature around the machine should never
yeasted dough ball slightly dusted with flour, and
a roughly round portion of
Push Button R (Drawing 2, Page 6).
with flour and pressed) into the Upper Opening G.
can be put on a
Each cardboard box contains a complete machine.
press on it
out without
6.2 Warning: Install the machine
as indicated on Drawing 1, Page 2.
3
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor
7
7i ASSEMBLING
The Funnel G must be screwed
72 DISASSEMBLING
7.2. 1
. Take offthe transparent cover after having
fitted. To free itjust pull it
slightly towards
7.2.2 Take out the two Springs
Drawing 4) in order to take them
7.2.3 Take out the Dough Guides
4). The dough guide and
them slightly towards
the plate are simply
you.
7.2.4 Take out the Cenl Plate
21, Drawing 4) in order
counterweight and the two Roll Suppor-ts
8. REGULATION (See
The best regulation for the Pizza for any type ofdough. The
For instance Rollers B on about position 3, and
- Model DSI2 - for poions weighing from 4.6
to free it completely.
Drawing 2, Page 6)
machine is provided with
on the cover using the four opposite
screws.
put the Switch F on position O. The
you.
(Item 21, Drawing 4) which block
the Dough Scrapers (Item 1
out for daily cleaning.
(Item 25, Drawing 4) and the Upper
Sliding Plate (Item 7, Drawing
joined together. To free them
(Item 5, Drawing 4), Take off the
fixing cap of the Balance (Item
Take out the Rod (Item 19. Drating
for complete cleaning.
Xpress machine can be obtainea gradually
a new patented Transfer Device A (balance).
- 6.3 oz., set with Lever C the Upper
with Lever E the lower rollers D
on about position 2.
cover is simply
8, 19;
you just have to pull
4) with
since it can be suitable
For light portions, close the
more than 6.3 oz. open the upper and lower the opening ofthe lower rollers
Weigh the dough to know
rollers
how to adjust the
upper and lower rollers by one position at
rollers by one position at a time. We just
must correspond to the final required thickness.
Remember o adjust atways gradually
cording to the type and qualityotthe dough. When adjusted
again.
n the
right way. never touch
ac-
Should
that:
a time. For portions weighing
remind you that
the dough not arrive round, it means
The gaps of the rolls 13 and O have not
been ADJUSTED properly.
The dough ball
into G.
The dough has been PULLED and flOt
GUtOED when going out of lotis D
was not ROUND when
put
PDF compression, OCR, web optimization using a watermarked evaluation copy of CVISION PDFCompressor