U-Line U-OL2115B, U-OL2175B, U-OL2175W, U-OL2115W Overlay Panels

Page 1
®
DOOR PANEL INSTALLATION GUIDE
Overlay Door Panel
Preparation and Installation
Instructions
The Built-In Undercounter Leader Since 1962 U-LINE.COM
Page 2
Overlay Door Panel
IMPORTANTIMPORTANT
C
C
D
D
23.750
15/32
3/8
13/32
3/8
13/16
1/4
SEE DETAIL
A
SEE DETAIL
B
BACK SURFACE MUST BE A FLUSH FLAT SURFACE FOR PANEL DOORS USE A BACKER BOARD
3/16
CHAMFER 1/32" X 45°
5/16
14.750
*BI2115 & 2160 Series
*75 Series
.750 MIN
Detail B
Detail A
A Full overlay door panel completely covers the door frame and handle to give you a built-in appearance. See your U-Line dealer for the optional Full Overlay Door Panel Kit.
Full Overlay Door Panel Kit Part Number
2175 Black U-OL2175B
2175 White U-OL2175W
2115 & 2160 Black U-OL2115B
2115 & 2160 White U-OL2115W
Included In Kit:
• 1x Replacement Handle • 2x Hinge Plates
• 2x Pivot Plate • 1x Door Closer
• 1x Overlay Cap • 2x Pivot Posts
• 8x #6x2” Drywall Screw • 8x 8-32 x1/2” Screws
• 2x 8-32 x 3/8” Screws
• The door panel must not weigh more than 20lbs.
• It is important to ensure that all drilled holes are drilled to the correct depth in order to avoid splits in the wood when hardware is installed.
• Rear view of wood panel for right-hand hinge shown. Use mirror image for left hand hinges.
• Appliance will need up to 34 1/2” to the under side of the counter to leave room for leveling adjustments
1. Determine cabinet toe kick height, by measuring the difference between the surface the appliance will rest on and the bottom of the adjacent cabinetry. Adjust panel height according to the height of you cabinetry’s Toe Kick.
2. Cut the overlay to the dimensions in Tab l e A & B .
3. Drill hole for upper door hinge (top of panel) using a #16 drill bit (0.177” diameter) x 11/16” deep (See diagram below)
4. Drill hole for lower door hinge 5/16” diameter x 1/4” deep (See diagram below)
Ta b l e A ( W i dt h )
Model Width
2175 23 3/4”
2115 & 2160 14 3/4”
Table B (Height)
To e K i c k H e i g h t To e K i c k H e i g h t
3 3/4” 29 3/4” 4 1/4” 29 3/8”
3 7/8” 29 3/4” 4 3/8” 29 1/4”
4“ 29 5/8” 4 1/2” 29 1/4”
4 1/8” 29 1/2”
Note: Ta b l e B dimensions will vary based on the level of the floor. If floor is uneven, cut panel to the next longer dimension and adjust level legs to achieve proper fit
U-Line Door Panel Installation Guide 1
Page 3
Installation Instructions
Overlay Panel
Overlay Panel
New Handle
Old Handle
ULIN_0403_A
Steel Plate
Top Down Slice
View
11/16”
4 1/16”
10 1/2”
12 1/2”
2 7/16”
7/8”
A
Removing Existing Door
1. Remove the door shelves by first pulling shelves at a 45° angle, then straight out.
2. Remove the top hinge screw pin (Phillips screwdriver). Remove the door by tilting forward and lifting off the bottom hinge pin.
3. Pull door gasket out of the groove (top edge of door only). Start in the middle and pull outward, moving toward the edge. This may take some force.
4. Remove the two screws located on both sides of the handle. Do not discard screws.
5. Remove the handle and discard. (This handle will be replaced with the overlay handle included in the Full Overlay Door Panel Kit).
Install the replacement Door Handle using the two screws
6. removed in step 4.
Preparing The Door Frame For Overlay
You have received your door with or without holes pre-punched into the steel panel. If your panel does not have pre-punched holes please reference diagram A for hole locations.
1. Lay the door down on a flat surface with the galvanized steel panel facing upwards. If your unit was equipped with door shelves, it may be helpful to prop up both door sides with 4x4’s to keep the unit from pivoting.
2. Using a 9/64” Drill bit, drill through the steel panel and frame using the holes in the steel panel as a guide, or the dimensions provided in diagram
A
Be sure to drill completely through frame material.
if your panel did not come pre-punched.
Panel installation
1. Lay prepared panel face down on a flat clean surface.
2. Carefully lay door down on top of panel, steel plate side down.
3. Line the top of the door flush with the
4. Using a 7/64” Drill bit, drill 8 pilot holes into the wood panel 3/ 8” deep.
5. Locate the 8 #6x2” screws provided in the overlay panel install kit.
6. Using a phillips head bit, place one screw into each of the 8 pilot holes and screw down.
top
of the panel.
7. Be sure the screws force their way past the opening on the gasket channel and sit flush against the bottom of the gasket channel.
8. Starting at the corners, re-install the gasket into the gasket channel in the frame. Make sure the gasket is fully seated, this may take some force.
U-Line Door Panel Installation Guide 2
Page 4
Door Installation
IMPORTANTIMPORTANT
#8-32 x 3/8" SEMS Hex Screw
(2 Places)
Wood Panel Bottom Pivot Plate
(5/8" Longer Than
Existing Bottom Pivot Plate,
Flush Side Facing Out)
Existing
Door
Existing Bottom Pivot Plate
(Remove and Discard)
3/4" Wood Panel
Overlay Cap
Replacement Handle
3/4" Wood Overlay
#8-32 x 1/2" Flat Head Screws
Black, Two Places
Top Pivot Plate
Screw to attach Handle
Top Pivot Plate
#8-32x 1/2"
Flat Head Screw
Three Places
Door Panel
Wood Panel Top Hinge Plate
(5/8" Longer than Existing Top Hinge Plate)
Pivot Post
ULIN_0405
Existing Door
#8-32 x 1/2" Flat Head Screw
Three Places
Wood Panel Bottom Hinge Plate
(5/8" Longer than Existing Bottom Hinge Plate)
Door Closure Top
Door Closure
Bottom
Pivot Post
Closure Assembly
1. Remove the existing bottom pivot plate and replace with the Full Overlay pivot plate.
2. Attach Overlay cap to door, opposite side of where hinges will be, see below.
3. Attach replacement Top Pivot Plate to door, on the side where hinges will be. Use the two #8-32 x 1/2” Flat Head Phillips screws (Black) supplied with kit, see below
Installing the Door
1. Remove the existing hinge from the unit, saving the door closer assembly, see below
2. Install the replacement top and bottom hinge onto the unit, see below.
3. Install the pivot post into the new Replacement Bottom Hinge (using phillips screwdriver) and install the hinge onto the unit.
4. Replace the door closure assembly onto the bottom pivot post. Be sure the bosses on closures align with holes in hinge and hinge plate.
4. Attach replacement bottom pivot plate; on the side where hinges will be. Use the two #8-32 x 3/8 Hex Screws supplied with kit, see below.
5. Starting at the corners and working toward the center, push the door gasket into place.
Pivot posts must be cleaned. Closers must also be clean and greased to ensure proper operation.
5. Place the modified door onto the pivot post.
6. Position door and install the pivot post into the top hinge
7. Adjust door as needed for proper closure
8. Check to see that light goes off when the door closes.
9. Reinstall the door shelves by lining up the bosses and first pushing straight in, then down at a 45° angle.
U-Line Door Panel Installation Guide 3
Page 5
Checking Door Alignment
IMPORTANTIMPORTANT
1/8"
Slotted Mounting
Holes
Raise
Outside
Door Edge
Lower
Outside
Door Edge
Wood Overlay
Notches
(Must Face Toward
Center of Door)
Existing Door
Door Gasket
Right Hand Hinge Model Shown
Toe Kick
Door Reveal
Panel
Bottom Of Panel
The unit’s door is aligned at the factory before shipment. However, it’s alignment could have been disturbed during shipment or during door panel installation.
Properly aligned, the door should be 1/8” below the top of the unit cabinet. NOT flush with the top. See Below.
1. Compare the top edge of the door to the top edge of the cabinet.
2. If the door edge is 1/8” below and parallel to the top of the cabinet, the door is aligned. If it is not, note whether the side opposite the hinge needs to be moved UP or DOWN, and use the following procedure.
Note: If the door is adjusted correctly, but panel is not square with the adjacent cabinets, slight adjustment can be made by drilling the holes in the vinyl coated steel panel slightly oversized.
4. Mount the door, recheck alignment and repeat Steps 2 and 3 if further adjustment is necessary.
5. When top edge of door is parallel to top edge of cabinet, remove the door and ensure the two screws are secure.
6. Remove the door closers from the bottom hinge, clean thoroughly and lubricate the mating surface with a petroleum jelly such as Vaseline.
7. Reinstall the closers, lining up the bosses with holes in hinge and hinge plate.
8. Mount the door and install top hinge pivot pin.
Note: The bottom of the panel will line up with the top of the cabinetry toe kick. Minor adjustments can be made using the leveler feet. Depending on the height of the toe kick, a small portion of the door may be visible beneath the panel.
Adjusting Door Alignment
1. Remove top hinge screw pin. Remove door by tilting forward and lifting off the bottom hinge pin.
2. With door upside-down, loosen, but do not remove the two screws on the door’s bottom hinge plate.
3. If the top far edge of the door needs to move UP, move the hinge plate toward the outside of the door and retighten screws. If the top far edge of the door needs to move DOWN, move the hinge plate toward the inside of the door and retighten screws.
U-Line Door Panel Installation Guide 4
Page 6
®
DOOR PANEL INSTALLATION GUIDE
SERVICE INFORMATION
If you have a problem with this appliance, your use and care guide has troubleshooting information to help you quickly identify common problems and provide information on possible cause and remedy. Answers to Customers Frequently Asked Questions are available at www.u-line.com/customer/faq.cfm. You may contact U­Line directly:
GENERAL INQUIRIES:
U-Line Corporation
P.O. Box 245040
Milwaukee, Wisconsin 53224-9540 U.S.A.
Phone (414) 354-0300
FAX (414) 354-7905
Email: sales@u-line.com
www.u-line.com
SERVICE ASSISTANCE:
Phone (800) 779-2547
FAX (414) 354-5696
Email: onlineservice@u-line.com
www.u-lineservice.com
PARTS ASSISTANCE:
E-mail: onlineparts@u-line.com
ABOUT U-LINE
Building on 45 years, U-Line has captivated those with an appreciation for the finer things with exceptional design, inspired innovations and attention to even the smallest details.
U-Line is synonymous with premium built-in under counter ice making, refrigeration and wine storage appli­ances, the U-Line Corporation is committed to luxury under the counter. U-Line is known and respected for unwavering dedication to product innovation, quality and selection. A bold and broad line of models is the prod­uct of visionaries in the pursuit of distinctive living environments in the kitchen and spaces beyond.
In 1962, Henry Uihlein founded U-Line Corporation as an outgrowth of Ben-Hur Freezer Company and was the first to develop and patent an automatic stand-alone under counter residential ice maker. His foresight and determination to develop new ideas and to succeed when there were no clear guidelines or solutions are evi­dent today. The Milwaukee, Wisconsin based family operated business provides continuity and vision from which innovations continue to be born.
Going forward, U-Line will continue offering best-in-class products that build on the company's numerous pat­ents and world firsts to guide the under counter industry in realizing its unlimited potential.
The Built-In Undercounter Leader Since 1962 U-LINE.COM
©2009 U-Line Corporation
Publication Number 30137 5/2011 Rev. J
Loading...