U-Line U-2015RB-00 Installation Manual

Full Overlay Door Panel Installation Instructions
for Models
2075, 2015 and CLR 2060
U-Line Corporation
P.O. Box 245040 •Milwaukee, WI 53224-9540
FAX 414.354.7905
Printed in U.S.A. P/N 30-10011
Part Number Description Quantity
12041 Insert 8mm Plug 2 42120 Spacer Nylon 3/8 OD x .19 ID 8 42121 Screw #10 x 5/8 Round Head 8 42122 Screw #6 x 1/2 Large Flat Head 2
11901-2* Pivot Plate Wood 1
12020* Wood Panel Bottom Hinge 1 12021* Wood Panel Top Hinge 1 12029* Top Pivot Bracket 1
31672 Door Closer - Male 1 31673 Door Closer - Female 1
42161-ZP Screw #8-32 x 3/8 Hex Sems 2
42096 Pivot Post 2
42101 Screw #8-32 x 1/2 Flat Head 6 80-17006-01** 2015 BLK Modified Top Handle Assy. 1 80-17006-02** 2015 WHT Modified Top Handle Assy. 1 80-17006-03** 2075 BLK Modified Top Handle Assy. 1 80-17006-04** 2075 WHT Modified Top Handle Assy. 1
*Specify Black or White **Only one handle is included with this kit
1. REMOVE EXISTING DOOR FROM THE CABINET
a. Remove top hinge screw pin
(7/64" hex key). Remove the door by tilting forward and lifting off the bottom hinge pin.
b. Pull door gasket out of the
groove (top edge of door only). Start in the middle and pull outward, moving toward the edge (see Figure 1).This may take some force.
c. Remove the three screws located
on the back of the handle (see Figure 2).
d. Remove the top handle
and discard. (This handle will be replaced with the modified handle included in the full overlay kit.)
e. Remove the two screws
located on both sides of the lower handle.Remove the handle.
f. Attach the modified
handle to the lower handle using the three screws removed in Step 1 C. Set aside.
g. Slide the existing door
panel out of the door frame.
2. PREPARE THE NEW OVERLAY PANEL
Refer to the Full Overlay Panel Preparation instruction sheet.
Figure 1
Figure 2
The full overlay door panel must not weigh more than 20 lbs.The thickness of the door panel must be 3/4".
NEW HANDLE
OLD HANDLE
Loading...
+ 7 hidden pages