U-Line H-1131 Installation Instructions Manual

Para Español, vea páginas 4-6.
Pour le français, consulter les pages 7-9.
π H -1131
ROLL PAPER TOWEL DISPENSER
TOOLS NEEDED
Drill Drill Bit Phillips Screwdriver
1-800-295-5510
uline.com
PARTS
Dispenser x 1
Metal Key x 1 Plastic Snap-In
OPTIONAL SNAP-IN KEY INSTRUCTIONS
1. Remove snap-in key from the hardware packet.
Figure 1
DECORATOR STRIP INSTALLATION INSTRUCTIONS
Key x 1
Wall Anchor x 5 Screw x 5
3. Rotate snap-in key clockwise to open the dispenser. (See Figure 2)
Figure 2
1. Open cover to expose inside of decorator strip window.
2. Slide decorator strip into place, making sure the decorator strip is held by the plastic guides. (See Figure 3)
3. Close cover firmly and lock.
PAGE 1 OF 9 0218 IH-1131
Figure 3
Decorator Strip
Decorator Strip Window
MOUNTING INSTRUCTIONS
NOTE: Recommended mounting height is 45" from the floor to bottom of dispenser.
NOTE: Ensure that proper mounting hardware is used for appropriate wall composition as enclosed hardware may not be compatible with your wall surface.
1. Insert the key into the lock opening on the bottom of dispenser and rotate clockwise until the cover pops open. (See Figure 4)
2. Open dispenser cover and hold dispenser to ideal mounting place on wall. (See Figure 5)
Figure 4
Figure 5
3. Mark the holes on the wall where screws will be inserted. (See Figure 6)
4. Drill into wall at five marked locations with an
Figure 6
Figure 7
appropriate drill bit. (See Figure 7)
5. Hold dispenser to wall so holes in dispenser match up with previously drilled holes in wall. Insert wall anchors and screws. (See Figure 6)
PAGE 2 OF 9 0218 IH-1131
LOADING INSTRUCTIONS
1. Open dispenser cover completely. (See Figure 5)
2. Push a roll of product into the holders and release when the core becomes engaged. Ensure that the paper feeds from beneath the roll. (See Figure 8)
Figure 8
3. Drape the paper over the black rubber roller and close the cover firmly until it locks. (See Figure 9)
Figure 9
4. Begin dispensing.
STUB ROLL LOADING INSTRUCTIONS
1. When the main roll reaches a diameter of approximately 3" it may be used as a stub roll. Remove the main roll from the upper roll holders and lock it onto the lower roll holders. (See Figure 10)
2. Drape paper over the black rubber roller. Load the main roll as previously described on page 2.
Figure 10
π
CHICAGO • ATLANTA • DALLAS • LOS ANGELES • MINNEAPOLIS • NYC/PHILA • SEATTLE • MEXICO • CANADA
1-80 0-295 -5510
PAGE 3 OF 9 0218 IH-1131
uline.com
Loading...
+ 6 hidden pages