Two Brothers Racing MX-ATV User Manual

Installation Instructions
MX Re-pack Kits
Part # 005-10038MX
Description
Repack all offroad canisters after every 10 hours of use. Part #005-10038MX
1. Make sure the bike is completely cool before starting the installation. Make sure the bike is secure on a centerstand or ideally a service lift and remove the mufer assembly form the bike.
2. Keep the S-bend tube attached to the mufer for ease of removal when separating the inlet from the outer sleeve.
3. Remove the 6 retaining screws holding the inlet to
the outer sleeve. Carbon and Titanium mufers
have a stiffening band under the retaining bolts that will be removed also.
4. Pull the S-bend away while holding the outer sleeve to separate them.
5. Remove contents from inside the mufer core/ packing.
8. Roll new packing tightly over the wire mesh covered perferated core and secure with tape on the packing.
9. Insert the new packed core into the mufer.
10. Replace the O-ring on the inlet if necessary.
11. Make sure the core goes into the core retainer on the outlet and inlet as you slide them together.
12. Install the 6 bolts to secure the outer sleeve with the inlet.
13. Torque the retaining bolts to 72in. lbs.
14. Re-install mufer to the motorcycle.
IMPORTANT - PLEASE READ CAREFULLY
technician. If you have any doubts as to your ability to install this performance part, please consult with your local motorcycle dealer.
Read all instructions rst before starting installation. Make sure the motorcycle and exhaust system are completely cool before starting the installation. Also, make sure the bike is secure on a centerstand or ideally a service lift during installation. Be sure to save all stock components for
possible use later.
Warranty
Two Brothers Racing products are intended for closed course competition purposes only, and therefore are sold “as is” without warranty. Two Brothers Racing specifically disclaims any warranties of merchantability or fitness for a particular purpose and disclaims all responsibility for consequential and incidental damages or any other losses arising from the use of these products or parts.
6. Separate old packing from core and disguard packing.
7. Cut new packing to mufer length.
15. Before you run the bike, clean off all ngerprints and dirt, as any oily residue will etch the metal and become somewhat permanent when the system gets hot. Run the bike and enjoy. It is normal for some white smoke
to appear the rst time you start the bike. This is packing/manufacturing oil from inside the pipe burning
off. Check for gaps or leaks. After 1 to 2 hours of riding recheck all fasteners for tightness.
Loading...