Triton Forte Installation And Operating Instructions Manual

Page 1
Installers please note these InstructIons are to be left wIth the user
2180686A February 2008
Installation and
operating
instructions
Forte
electric
Page 2
Forte
Important safety information 1
Introduction 2
Specifications 2
Advice to users 2
Main components 3
Electrical requirements 4
Water requirements 6
Siting of the shower 7
Fitting the shower to the wall 8
Plumbing connections 10
Electrical connections 11
Replacing the cover 12
Commissioning 13
Operating the shower 14
Operating functions 16
Cleaning 17
Instructions for installers and service engineers only 18
Spare parts 19
Fault finding 20
Guarantee, service policy, etc. rear cover
CONTENTS Page
To check the product suitability for commercial and multiple installations, please contact Triton’s specification advisory service before installation.
Telephone: 0870 067 3767
Facsimile: 0870 067 3334
E mail: technical@tritonshowers.co.uk
Page 3
1
Forte
Important safety information
� � �
Products manufactured by Triton are safe and without risk provided they are installed, used and maintained in good working order in accordance with our instructions and recommendations.
WARNING: DO NOT operate shower if frozen, or suspected of being frozen. It must thaw out before using.
DO NOT operate the unit if the showerhead or spray hose becomes damaged.
DO NOT restrict flow out of shower by placing showerhead in direct contact with your body. DO NOT operate the shower if water ceases to flow during use or if water has entered inside the unit because of an incorrectly fitted cover.
WARNING: If restarting the shower immediately after stopping, be aware that a slug of hot water will be expelled for the first few seconds.
PLEASE READ THIS IMPORTANT SAFETY INFORMATION
A-001-A
1
1.1
1.2
1.3
1.4
1.5
1.6
a)
b)
c)
1.7
1.8
1.9
2
2.1
2.2
2.3
2.4
2.5
2.6
3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
GENERAL
Isolate the electrical and water supplies before removing the cover.
Read all of these instructions and retain them for later use.
DO NOT take risks with plumbing or electrical equipment.
Isolate electrical and water supplies before proceeding with the installation.
The unit must be mounted onto the finished wall surface (on top of the tiles). Do not tile up to unit after fixing to wall.
Contact Customer Service (see back page), if any of the following occur:
If it is intended to operate the shower at pressures above the maximum or below the minimum stated.
If the unit shows a distinct change in performance.
If the shower is frozen. If it is intended to operate the shower in areas
of hard water (above 200 ppm temporary hardness), a scale inhibitor may have to be fitted. For advice on the Triton Scale Inhibitor, contact Triton Customer Service.
The showerhead must be cleaned regularly with descalent to remove scale and debris, otherwise restrictions to the flow on the outlet of the unit will result in higher temperatures and could also cause the Pressure Relief Device in the unit to operate.
This product is not suitable for mounting into steam rooms or steam cubicles.
PLUMBING
The plumbing installation must comply with Water Regulations, Building Regulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS 6700.
The supply pipe must be flushed to clear debris before connecting to the shower unit.
DO NOT solder pipes or fittings within
300mm of the shower unit, as heat can transfer along the pipework and damage components.
DO NOT fit any form of outlet flow control as the outlet acts as a vent for the heater can.
DO NOT use excessive force when making connections to the flexible hose or showerhead, finger tight is sufficient.
All plumbing connections must be completed before making the electrical connections.
ELECTRICAL
The installation must comply with BS 7671 ‘Requirements for electrical installations’ (IEE wiring regulations), building regulations or any particular regulations as specified by the local Electrical Supply Company.
This appliance MUST be earthed. In accordance with ‘The Plugs and Sockets etc.
(Safety) Regulations 1994’, this appliance is intended to be permanently connected to the fixed wiring of the electrical mains system.
Make sure all electrical connections are tight to prevent overheating.
Fuses do not give personal protection against electric shock.
To enhance electrical safety a 30mA residual current device (RCD) should be installed in all UK electric and pumped shower circuits. This may be part of the consumer unit or a separate unit.
Switch off immediately at isolating switch if water ceases to flow during use.
Other electrical equipment i.e. extractor fans, pumps must not be connected to the circuits within the unit.
Switch off at isolating switch when not in use. This is a safety procedure recommended with all electrical appliances.
As with all electrical appliances it is recommended to have the shower and installation checked at least every two years by a competent electrician to ensure there is no deterioration due to age and usage.
Page 4
2
Forte
INTRODUCTION
This book contains all the necessary fitting and operating instructions for your Triton electric shower. Please read them carefully.
The shower installation must be carried out by a suitably qualified person and in the sequence of this instruction book.
Care taken during the installation will provide a long, trouble-free life from your shower.
SPECIFICATIONS
Electrical
Nominal power Nominal power rating at 240V rating at 230V
8.5kW – (40A MCB rating) 7.8kW – (40A MCB rating)
Water Inlet connection – 15 mm diameter. Outlet connection – ½” BSP male thread.
Entry Points
Water – top, bottom, back, left or right. Cable – top, bottom, back, left or right.
Materials Backplate, cover, controls, showerhead – ABS. Sprayplate – Acetal. Elements – Minerally insulated corrosion resistant metal sheathing.
Dimensions Height – 305 mm Width – 210 mm Depth – 110 mm
Standards and Approvals
Waterproof rating IPX4.
Complies with the requirements of current British and European safety standards for household and similar electrical appliances.
Complies with requirements of the British Electrotechnical Approvals Board (BEAB).
Meets with Compliance with European Community Directives (CE).
ADVICE TO USERS
The following points will help you understand how the shower operates:
a.
The electric heating elements operate at a
constant rate at your chosen power setting. It is the flow rate of the water passing through the heater unit which determines the shower temperature at any given setting (the slower the flow the hotter the water becomes, and the faster the flow the cooler the water).
b.
During winter, mains water supply will
be cooler than in summer. Therefore the temperature of the shower will vary between seasons on any one setting of the temperature control, e.g. if you have chosen setting number 6 as your preferred shower temperature in the summer, you will have to increase that number during winter by adjusting the temperature control clockwise (which in effect slows the water flow).
c.
The stabiliser valve minimises variations in
shower temperature during mains water pressure changes. If changes in shower temperature are experienced during normal use, it will most likely be caused by the water pressure falling near to or below the minimum level. The drop in pressure may be due to water being drawn off at other points in the house while the shower is in use. If pressure drops appreciably below the minimum, the heating elements will automatically cut out.
If ever the water becomes too hot and you cannot obtain cooler water, first check that the sprayplate in the showerhead has not become blocked.
DO NOT place items such as soap or shampoo bottles on top of the unit. Liquid could seep through the joint between the cover and backplate, and possibly damage the sealing rubber.
Replacement parts can be ordered from Customer Service. See ‘spare parts’ for details and part numbers.
Page 5
3
Forte
MAIN COMPONENTS
Inside unit (fig.1)
1. Top cable/pipe entry
2. Wall screw fixings
3. Cover screw fixings
4. Thermal safety cut-out (main)
5. Power selector assembly
6. Power neon
7. Can and element assembly
8. Pressure switch assembly
9. Stabilising valve
10. Terminal block
11. Earth connection
12. Solenoid valve
13. Water inlet
14. Outlet temperature limiter
15. Pressure relief device (PRD)
16. Trimplate
17. Shower outlet
Pack contents
Shower unit
Screw fixing kit
Instructions, guarantee, etc.
255 mm
305 mm
210 mm
59 mm
Fig.1
NOTE: Not all wiring has been shown for reasons of clarity.
1
2
3
4
6
7
8
9
10
11
12
13141516
3
17
15
14
13
2
3
3
5
Page 6
4
Forte
Meter
Incoming
supply
fuse
Meter
tails
Consumer
unit
Pull cord
isolating switch
Shower
unit
Fuse or
MCB
RCD
(can be part of
consumer unit)
80A or 100A
main switch
Shepperton Park,
Triton Road, Nuneaton,
Warwickshire, CV11 4NR
Table A
MCB
30/32A
32A
40A
40A
40A
40/45A
45A
cartridge
fuse
30A
35A
35A
45A
45A
45A
45A
unit
rating
7.0kW
7.5kW
8.0kW
8.5kW
9.0kW
9.5kW
10.5kW
CIRCUIT PROTECTION
Fig.3 Schematic of installation circuit
Fig.2
W-006-A
WARNING!
THIS APPLIANCE MUST BE EARTHED
The installation, supply cable and circuit protection must conform with BS 7671 (IEE wiring regulations) and be sufficient for the amperage required. The following notes are for guidance only:
1
1.1
2
3
3.1
4
4.1
4.2
5
The shower must only be connected to a 230-240V ac supply. If you are installing a shower with a kilowatt rating above 9kW, it is advisable to contact the local electricity supply company.
The electrical rating of the shower is shown on the rating label (Fig. ) within the unit.
Before making any sort of electrical connection within the installation make sure that no terminal is live. If in any doubt, switch off the whole installation at the mains supply and remove the correct fuse.
The shower must be connected to its own independent electrical circuit. IT MUST NOT be connected to a ring main, spur, socket outlet, lighting circuit or cooker circuit.
The electrical supply must be adequate for the loading of the unit and existing circuits.
Check your consumer unit (main fuse box) has a main switch rating of 80A or above and that it has a spare fuse way which will take the fuse or Miniature Circuit Breaker (MCB) necessary for the shower (Fig. ).
If your consumer unit has a rating below 80A or if there is no spare fuse way, then the installation will not be straightforward and may require a new consumer unit serving the house or just the shower.
You will need to contact the local electricity company. They will check the supply and carry out what is necessary. They will also check the main bonding.
The earth continuity conductor of the electrical installation must be effectively connected electrically to all exposed metal parts of other appliances and services in the room in which the shower is to be
ELECTRICAL REQUIREMENTS
3
Electrical requirements
The installation, supply cable and circuit protection must conform with BS 7671 (IEE wiring regulations) and be sufficient for the amperage required. The following notes are for guidance only:
1
1.1
The shower must only be connected to a 230-240V ac supply. If you are installing a shower with a kilowatt rating above 9kW, it is advisable to contact the local electricity supply company.
The electrical rating of the shower is shown on the rating label (Fig. ) within the unit.
ELECTRICAL REQUIREMENTS
2
Page 7
5
Forte
Table B
Note: Cable selection is dependent on
derating factors
Twin and earth PVC insulated cable
Current carrying capacity
In conduit
trunking
6 mm²
38A
10 mm²
52A
16 mm²
69A
Installed in an
insulated wall
6 mm²
32A
10 mm²
43A
16 mm²
57A
Clipped direct
or buried in a
non-insulated
wall
6 mm²
46A
10 mm²
63A
16 mm²
85A
3
3.1
4
4.1
4.2
5
5.1
6
6.1
7
7.1
7.2
E-002-A
The shower must be connected to its own independent electrical circuit. IT MUST NOT be connected to a ring main, spur, socket outlet, lighting circuit or cooker circuit.
The electrical supply must be adequate for the loading of the unit and existing circuits.
Check your consumer unit (main fuse box) has a main switch rating of 80A or above and that it has a spare fuse way which will take the fuse or Miniature Circuit Breaker (MCB) necessary for the shower (Fig. ).
If your consumer unit has a rating below 80A or if there is no spare fuse way, then the installation will not be straightforward and may require a new consumer unit serving the house or just the shower.
You will need to contact the local electricity company. They will check the supply and carry out what is necessary. They will also check the main bonding.
The earth continuity conductor of the electrical installation must be effectively connected electrically to all exposed metal parts of other appliances and services in the room in which the shower is to be installed, to conform to current IEE regulations.
All exposed metallic parts in the bathroom must be bonded together using a cable of at least 4 mm² cross sectional area. These parts include metal baths, radiators, water pipes, taps and waste fittings.
For close circuit protection DO NOT use a rewireable fuse. Instead use a suitably rated Miniature Circuit Breaker (MCB) or cartridge fuse (see Table A).
In the interest of electrical safety a 30mA residual current device (RCD) should be installed in all UK electric and pumped shower circuits. This may be part of the consumer unit or a separate unit.
A 45 amp double pole isolating switch with a minimum contact gap of 3 mm in both poles must be incorporated in the circuit.
It must have a mechanical indicator showing when the switch is in the OFF position, and the wiring must be connected to the switch without the use of a plug or socket outlet.
The switch must be accessible and clearly identifiable, but out of reach of a person using a fixed bath or shower, except for the cord of a cord operated switch, and
7.1
7.2
8
9
9.1
9.2
10
10.1
10.2
10.3
It must have a mechanical indicator showing when the switch is in the OFF position, and the wiring must be connected to the switch without the use of a plug or socket outlet.
The switch must be accessible and clearly identifiable, but out of reach of a person using a fixed bath or shower, except for the cord of a cord operated switch, and should be placed so that it is not possible to touch the switch body while standing in a bath or shower cubicle. It should be readily accessible to switch off after using the shower.
Where shower cubicles are located in any rooms other than bathrooms, all socket outlets in those rooms must be protected by a 30mA RCD.
The current carrying capacity of the cable must be at least that of the shower circuit protection (see Table B).
To obtain full advantage of the power provided by the shower, use the shortest cable route possible from the consumer unit to the shower.
It is also necessary to satisfy the disconnection time and thermal constraints which means that for any given combination of current demand, voltage drop and cable size, there is a maximum permissible circuit length.
The shower circuit should be separated from other circuits by at least twice the diameter of the cable or conduit.
The current rating will be reduced if the cabling is bunched with others, surrounded by thermal loft or wall insulation or placed in areas where the ambient temperature is above 30°C. Under these conditions, derating factors apply and it is necessary to select a larger cable size.
In the majority of installations, the cable will unavoidably be placed in one or more of the above conditions. This being so, it is strongly recommended to use a minimum of 10 mm cabling throughout the shower installation.
In any event, it is essential that individual site conditions are assessed by a competent electrician in order to determine the correct cable size and permissible circuit length.
Page 8
6
Forte
Mains electric supply
(via double pole switch)
double
pole
isolating
switch
Separate permanently
connected supply
from consumer unit
isolating
stopvalve
Switch may be
wall mounted in accordance with IEE regs.
Shower unit
Mains water supply
Fig.4 Diagrammatic view (not to scale)
WATER REQUIREMENTS
The installation must be in accordance with Water Regulations and Bylaws.
To ensure activating the heating elements, the shower must be connected to a mains water supply with a minimum running pressure of 100kPa (1.0 bar) at a minimum flow rate of eight litres per minute.
The maximum static pressure must not exceed 1000kPa (10 bar).
Note: If the stated flow rate is not available, it may not be possible to achieve the best performance from the unit throughout the year.
For guidance on the running and static pressures contact the local Water Authority or consult a competent plumber.
During periods of high ambient temperatures it may be necessary to select a low power setting to achieve your preferred shower temperature.
The water supply can be taken from a cold water storage cistern provided there is a minimum head of ten metres above the showerhead. It must be an independent supply to the shower only.
If it is intended to operate the shower at pressures above the maximum or below the minimum stated, contact Customer Service for advice.
Fig.5 shows a typical system layout.
DO NOT use jointing compounds on any pipe fittings for the installation.
Page 9
7
Forte
SITING OF THE SHOWER
IMPORTANT: For ease of servicing, the unit must always be mounted on the surface of tiled walls. NEVER tile up to the unit.
Refer to
fig.5 for correct siting of shower.
Position the unit where it will
NOT be in direct contact with water from the showerhead. Position the shower unit vertically.
Allow enough room between the ceiling and the shower to access the cover top screws.
Note: Water Regulations require the showerhead be ‘constrained by a fixed or sliding attachment
so that it can only discharge water at a point not less than 25 mm above the spill-over level of the relevant bath, shower tray or other fixed appliance’. The use of the supplied retaining ring
will in most cases meet this requirement, but if the showerhead can be placed within a bath, basin or shower tray, then a double check valve, or similar, must be fitted in the supply pipework to prevent back-flow.
Pressure relief safety device
A pressure relief device (PRD) is designed into the shower unit which complies with European standards. The PRD provides a level of appliance protection should an excessive build up of pressure occur within the shower.
DO NOT operate the shower with a damaged or kinked shower hose, or a blocked showerhead which can cause the PRD to operate.
When commissioning, the showerhead must be removed from the flexible hose, while at the same time the temperature control must be at the minimum flow position. Failure to follow this procedure may also cause the PRD to operate.
Make sure the shower is positioned over a bath or shower tray because if the PRD operates, then water will eject from the bottom of the unit.
Should this happen, turn off the electricity and water supplies to the shower at the isolating switch and stopvalve. Contact Customer Service for advice on replacing the PRD.
WARNING!
The shower must not be positioned
where it will be subjected to freezing
conditions.
Outline of bath,
shower tray
or cubicle
Mains cold water
supply (either top, side,
bottom or rear entry)
Shower unit can
be mounted
either side of riser rail
25mm minimum
Shower unit
must not
be within
an area 1 metre
from base
Height of showerhead and shower to suit user's
requirement
Fig.5 Diagrammatic view (not to scale)
IMPORTANT: The unit must be mounted
on a flat surface which covers the full width and length of the backplate. It is important that the wall surface is flat otherwise difficulty may be encountered when fitting the cover and subsequent operation of the unit may be impaired.
Page 10
8
Forte
FITTING THE SHOWER TO THE WALL
Note: The control knobs are an integral part of the cover – DO NOT attempt to remove them.
Lift the cover from the backplate. Remove the trimplate by removing the two fixings screws. This will make the pipe and cable connections easier
(fig.6).
Entry positions for the mains water and electric cable are from the top, bottom, either side or from the back.
Note: Deviations from the designated entry points will invalidate product approvals.
If a bottom entry has been chosen, fit the supplied pipe trim in the top of the backplate (fig.7).
If a top entry has been chosen, fit the supplied pipe trim in the bottom of the trimplate
(fig.8).
If a side entry is required, the trimplate side will have to be cut. With the elbow compression fitted on the outlet, temporarily place the trimplate into position, then mark the pipe entry on the side of the trimplate. Carefully remove the appropriate area using a junior hacksaw.
If installing a feed pipe from the back or bottom, the centre of the inlet valve to the wall surface is 20 mm (fig.9).
Note: If entry is from the back, the nut of the compression fitting will be partially behind the surface of the wall. This area
MUST be left clear when plastering over the pipework in order to make the nut accessible for future adjustments.
After choosing the site for the shower, use the backplate as a template and mark the two fixing holes
(fig.10).
Drill and plug to suit the fixing screws supplied.
(The wall plugs provided are suitable for most brick walls – use an appropriate masonry drill, but if the
WARNING!
Check there are no hidden cables or
pipes before drilling holes for wall
plugs. Use great care when using
power tools near water. The use of
a residual current device (RCD) is
recommended.
Fig.8
Fig.7
Fig.6
Page 11
9
Forte
wall is plasterboard or a soft building block, you must use suitable wall plugs and an appropriate drill bit.)
Screw the top fixing screw into position leaving the base of the screw head protruding 6 mm out from the wall.
Hook the backplate over the top screw and fit the bottom fixing screw into position.
DO NOT fully tighten the screws at this stage, as the fixing holes are elongated to allow for out of square adjustment after the plumbing connections have been completed.
Fig.10
20
mm
Fig.9
Page 12
10
Forte
PLUMBING CONNECTIONS
Plumbing to be carried out before wiring
DO NOT use jointing compounds on any pipe fittings for the installation.
DO NOT solder fittings near the shower unit as heat can transfer along the pipework and damage components.
Standard 15 mm x 15 mm brass compression fittings MUST be used to connect to the inlet of the shower.
Note: An additional stopvalve (complying with Water Regulations and Bylaws)
MUST be fitted in the mains water supply to the shower as an independent means of isolating the water in order to carry out maintenance or servicing.
IMPORTANT: Before completing the connection of the water supply to the inlet of the shower, and in compliance with Water Regulations, flush out the pipework to remove all swarf and system debris. This can be achieved by connecting a hose to the pipework and turning on the mains water supply long enough to clear the debris to waste.
Procedure
Turn off the water supply either at the mains stopvalve or the isolating stopvalve. Connect the mains water supply to the inlet of the shower via 15 mm copper, stainless steel or plastic pipe using a 15 mm x 15 mm brass compression fitting.
Note: The inlet fitting is designed to enter a compression fitting only.
DO NOT use push­fit connectors as full engagement cannot be guaranteed. DO NOT use excessive force when making these connections.
Make sure the backplate is square on the wall and tighten the two retaining screws which hold it to the wall.
Turn on the mains water supply and check for leaks in the pipework connection to the shower.
IMPORTANT: Using a suitable sealant, always seal around the incoming pipework to prevent water entering the wall.
Note: At this stage no water can flow through the unit.
WARNING!
The outlet of the shower acts as a
vent and must not be connected to
anything other than the hose and
showerhead supplied.
Page 13
11
Forte
Terminal
block
2
3
4
5
7
L
N
6
8
E
9
1
Fig.11
1. Terminal block
2. Thermal cut-out (main)
3. Thermal cut-out (outlet)
4.
Microswitches
5. Start/stop microswitch
6. Solenoid valve
7. Element
8.
Element
9. Neon
Fig.12
ELECTRICAL CONNECTIONS
SWITCH OFF THE ELECTRICITY SUPPLY AT THE MAINS.
Fig.11 shows a schematic wiring diagram.
The cable entry points are shown in
fig.1.
The cable can be surface clipped, hidden or via 20 mm conduit.
Note: Conduit entry can only be from rear. Route the cable into the shower unit and connect to the terminal block (fig.12) as follows:
Earth cable to terminal marked E
Neutral cable to terminal marked N
Live cable to terminal marked L
IMPORTANT: Fully tighten the terminal block screws and make sure that no cable insulation is trapped under the screws. Loose connections can result in cable overheating.
Note: The supply cable earth conductor must be sleeved. The outer sheath of the supply cable must be stripped back to the minimum.
The supply cable must be secured either by routing through conduit or in trunking or by embedding in the wall, in accordance with current IEE regulations.
The use of connections within the unit, or other points in the shower circuit, to supply power to other equipment e.g. extractor fans, pumps etc. will invalidate the guarantee.
DO NOT switch on the electricity supply until the cover has been fitted.
Note:
The elements on UK models are to 240V specification and will give a lower kW rating if the voltage supply is below 240V.
Page 14
12
Forte
REPLACING THE COVER
Locate the trimplate into the backplate and secure with the two fixing screws.
The power selector spindle must be aligned as shown
(fig.13).
To check that the temperature control is correctly positioned on the stabilising valve, temporarily place the cover in position so that the splines engage and rotate the temperature control fully anti-clockwise.
Remove the cover and position the temperature control knob so that it points to the maximum flow position
(fig.14). Position the power
selector to the STOP position (fig.15).
Replace the cover squarely to the backplate and guide into position so that the knobs locate correctly into the splined spindles.
Should any difficulty arise, recheck the points above.
Secure the cover in position with the four retaining screws.
Selector spindle
Fig.13
Fig.15
7HPSHUDWXUH
FRQWUROWR
PD[LPXPIORZ
Fig.14
Page 15
13
Forte
COMMISSIONING
The first operation of the shower is intended to flush out any remaining unit debris, and to make sure the heater unit contains water before the elements are switched on. This operation must be carried out with the flexible hose screwed to the outlet but without the showerhead attached. Make sure the outlet of the flexible hose is directed to waste.
Before turning on the electric and mains water supplies to the shower, check the power selector is at the
STOP position (fig.15) and the
temperature control is rotated fully clockwise to the minimum flow position (fig.16).
Note: Failure to turn the temperature control to the minimum flow position may cause the PRD to operate.
Turn on the mains water supply to the shower at the isolating stopvalve and then the electric supply at the isolating switch. The power indicator will light.
Switch the power selector to the COLD position (fig.17) and wait until water starts to flow from the flexible hose.
Slowly rotate the temperature control fully anti-clockwise to the maximum flow position (fig.18).
It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is being dispersed from the shower.
When a smooth flow of water is obtained, rotate the temperature control from minimum to maximum several times to release any trapped air within the unit.
Once flushing out has been completed, stop the water flow by turning the power selector to the STOP position.
Fit the showerhead to the flexible hose and place in the showerhead holder.
The shower is now ready for normal operation.
WARNING!
Before normal operation of the
shower, it is essential the following
commissioning procedure is
completed correctly.
Temperature
control to
minimum flow
position
7HPSHUDWXUH
FRQWUROWR
PD[LPXPIORZ
Fig.16
Fig.18
Fig.17
Page 16
14
Forte
To start the shower
Turn the power selector to the red or blue symbol positions and water will start to flow.
To stop the shower
Switch the power selector to the STOP position and water will cease to flow.
To use the power selector
The power selector has four positions – STOP, COLD, ECONOMY and HIGH – as shown in fig.19.
The grey symbol
is the STOP position and is to switch off the electric and water supply at the shower; no flow or power used.
The blue symbol
is the COLD setting for cooler water only. Adjustment of the temperature control at this setting will only alter the force of the water from the showerhead. IT WILL NOT ALTER THE WATER TEMPERATURE.
The red symbol is the ECONOMY setting for using less power during warmer months. Temperature adjustment at this setting is via the temperature control.
Note: If the stated flow rate required for the unit cannot be met due to low water pressure, it will be necessary to operate the unit on
ECONOMY setting during the warmer months because of flow rate limitations entering the unit.
The red symbol
is the HIGH setting which
allows the highest flow achievable for your
WARNING!
Before normal operation of the
shower, it is essential that the
commissioning procedure has been
completed correctly.
WARNING!
If restarting immediately after
stopping, be aware that a slug of hot
water will be expelled for the first
few seconds.
+LJK
3RZHUVHOHFWRU
(FRQRP\
&ROG
7HPSHUDWXUH FRQWURO
6WRS
Fig.19
Operating the shower
OPERATING THE SHOWER
Page 17
15
Forte
preferred temperature. This setting should normally be regarded as optimum shower performance throughout the year. Temperature adjustment at this setting is via the temperature control.
To adjust the shower temperature
Alter the water temperature by increasing or decreasing the flow rate of the water through the shower via the temperature control (fig.20).
After finding your preferred shower temperature, the temperature control setting can be remembered and left as the normal setting. This should only need to be altered to compensate for seasonal changes in ambient water temperature.
Note: The preferred setting on
ECONOMY will give a different temperature to the same setting on HIGH.
To decrease the shower temperature
Turn the temperature control anti-clockwise (fig.20); this will increase the flow of water through the shower.
To increase the shower temperature
Turn the temperature control clockwise (fig.21); this will decrease the flow of water through the shower.
Note: It is advisable to be certain that the showering temperature is satisfactory by testing with your hand before stepping under the showerhead. There will always be a time delay of a few seconds between selecting a flow rate and the water reaching the stable temperature for that flow rate.
CAUTION: This appliance is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack of experience and knowledge, unless they have been given supervision or instruction concerning use of the appliance by a person responsible for their safety.
Children should be supervised to ensure that they do not play with the appliance.
Temperature
control to
minimum flow
position
Fig.21
7HPSHUDWXUH
FRQWUROWR
PD[LPXPIORZ
Fig.20
Page 18
16
Forte
µ3RZHU2Q¶
LQGLFDWRU
OPERATING FUNCTIONS
Power on indicator (fig.22)
When the electricity supply to the shower is switched on at the isolating switch, the ‘Power On’ indicator will light.
Note: Should the safety cut-out device operate, the indicator will remain lit.
Low water pressure cut-out
If the water pressure falls below the minimum required for correct operation of the shower, power will be switched off to the heating elements preventing any maintained temperature rises (water will continue to flow).
Power will automatically be restored when adequate water pressure returns.
Temperature limiter
During normal operation if an overheat temperature is sensed, power to the elements will be reduced. Water will continue to flow. When the temperature has cooled sufficiently, power to the elements will be automatically restored to the previous setting at the time of interruption.
Safety cut-out
The unit is fitted with a non-resettable thermal cut-out safety device. In the event of abnormal operation which could cause unsafe temperatures within the unit, the device will disconnect the heating elements. It will require a visit from a qualified engineer to determine the nature of the fault and replace the safety device, once the unit has been repaired.
NOTE: In normal use, it is in order to leave the water supply permanently on to the shower unit, but as with most electrical appliances,
the unit must be switched off at the isolating switch when not in use.
Fig.22
Page 19
17
Forte
CLEANING
Before cleaning, turn off the unit at the isolation switch to avoid the shower being accidentally switched on.
Triton recommends that all products are cleaned using warm, soapy water.
IT IS IMPORTANT TO KEEP THE SHOWERHEAD CLEAN TO MAINTAIN THE PERFORMANCE OF THE SHOWER. The hardness of the water will determine the frequency of cleaning. For example, if the shower is used every day in a very hard water area, it may be necessary to clean the showerhead on a weekly basis.
WARNING!
DO NOT use abrasive or aggressive
cleaning products when cleaning the
shower as they may damage the unit.
Page 20
18
Forte
CLEANING THE INLET FILTER
It is recommended that the filter is periodically cleaned in order to maintain the performance of the shower. It is essential that this operation is carried out by a competent person.
SWITCH OFF THE ELECTRICITY SUPPLY AT THE MAINS.
Remove the cover. The inlet filter is situated in the inlet pipe which is part of the solenoid valve (fig.23).
To gain access to the filter, remove the trimplate and disconnect and remove the compression fitting. Also, depending on the incoming pipework arrangements and if there is not enough slack in the pipework, it may be necessary to remove the unit from the wall.
When cleaning the filter,
DO NOT use a sharp object, as it will cause damage. It is preferable to use an old toothbrush or similar.
When the filter is clean, recommission the unit.
Filter
Fig.23
Instructions for installers and service engineers only
INSTRUCTIONS FOR INSTALLERS AND SERVICE ENGINEERS ONLY
WARNING!
After any servicing of the mains water
supply, always make sure the unit is
started on COLD in order to purge any
air in the pipework.
Page 21
19
Forte
Ref. Description Part No.
1. Power neon loom assembly 82300980
2. Thermal cut-out (main) 22010070
3. Switch carriage 7052197
– Camshaft assembly 82800480
– Microswitch and wire assembly 82300970
4. Can assembly 8.5kW P07810700
5. Stabiliser valve assembly 82600550
6. Solenoid valve assembly 83300450
7. Outlet pipe assembly
(incl. terminal block & wires)
S09201101
8. Pressure Relief Device (PRD) 82800450
9. Trimplate 7052921
10. Front cover assembly P15930602
11. Pipe trim
(backplate/trimplate)
7052920
Spare parts
SPARE PARTS
10
11
1
2
3
4
5
6
7
8
9
Page 22
20
Forte
FAULT FINDING
IMPORTANT: Switch OFF the electricity at the mains supply and remove the circuit fuse before removing the cover from the shower while attempting any fault finding inside the unit.
Problem/Symptom Cause Action/Cure
1 Shower
inoperable, no water flow.
2 Water too hot.
3 Water
temperature cycling hot/cool at intervals.
4 Water too cool
or cold.
1.1 Interrupted power
supply.
1.2 Unit malfunction.
2.1 Not enough water
flowing through the shower.
2.2 Blockage in supply
2.3 Increase in ambient
water temperature.
3.1 Heater cycling on
temperature limiter.
4.1 Too much flow.
4.2 Water pressure below
minimum required (see rating label).
4.3 Reduction in ambient
water temperature.
4.4 Electrical malfunction.
1.1.1 Blown fuse or circuit breaker. Check
supply. Renew or reset fuse or circuit breaker. If it fails again, consult a qualified electrician.
1.1.2 Power cut. Check other appliances and
if necessary, contact local the Electricity Supply Company.
1.2.1 Have unit checked. Ring Customer Service.
2.1.1 Increase flow rate via temperature control.
2.1.2 Blocked showerhead – clean or replace
blocked sprayplate in showerhead.
2.2.1 Check if stop valves are fully open. Check
if there is a blockage in the inlet filter.
2.3.1 Readjust flow rate to give increased flow.
2.3.2 Select ECONOMY power.
3.1.1 See 'Water too hot' causes 2.1, 2.2 and 2.3
and their appropriate action/cures. If it continues, contact Customer Service.
4.1.1 Reduce flow rate via temperature control.
4.2.1 Is water supply mains or tank fed?
4.2.2 If tank fed, replumb to mains water supply
or see 4.2.4.
4.2.3 If mains fed, make sure that mains
stopvalve is fully open and that there are no other restrictions in the supply while shower is in use, or see 4.2.4.
4.2.4 Fit pump to give minimum pressure (see
rating label). Contact Customer Service for advice.
4.3.1 Readjust flow rate to give reduced flow.
4.3.2 Select HIGH power.
4.4.1 Have unit checked by suitably qualified
electrician or contact Customer Service.
Page 23
21
Forte
FAULT FINDING (continued)
Problem/Symptom Cause Action/Cure
5 Shower varies
from normal temperature to cold during use.
6 Pressure relief
device has operated (water ejected from PRD tube).
4.5 Safety cut-out
operated.
5.1 Water pressure has
dropped below minimum required.
6.1 Blocked showerhead.
6.2 Twisted/blocked
flexible shower hose.
6.3 Showerhead not
removed while commissioning.
4.5.1 The thermal safety cut-out device has
operated. Have the unit checked by a suitably qualified service engineer or contact Customer Service.
5.1.1 Wait until the water pressure returns to
normal.
6.1.1 Clean or replace blocked sprayplate in
showerhead and then fit new PRD.
6.2.1 Check for free passage through hose.
Replace the hose if necessary and fit new PRD.
6.3.1 Fit new PRD. Commission unit with
showerhead removed.
Note: Identify cause of operation before fitting new PRD unit.
When fitting a new PRD, follow the commissioning procedure.
It is advised all electrical maintenance/repairs to the shower
should be carried out by a suitably qualified person.
In the unlikely event of a fault occurring please contact Triton Customer Service.
Do not remove the shower from the installation.
Page 24
Service Policy
In the event of a complaint occurring, the following procedure should be followed:
1
Telephone Customer Service on
0870 067 3333 (0845 762 6591 in Scotland and in Northern Ireland), having available the model number and power rating of the product, together with the date of purchase.
2
Triton Customer Service will be able to confirm
whether the fault can be rectified by either the provision of a replacement part or a site visit from a qualified Triton service engineer.
3 If a service call is required the unit must be fully
installed for the call to be booked and the date confirmed. In order to speed up your request, please have your postcode available when booking a service call.
4
It is essential that you or an appointed representa-
tive (who must be a person of 18 years of age or more) is present during the service engineer's visit and receipt of purchase is shown.
5
A charge will be made in the event of an aborted
service call by you but not by us, or where a call under the terms of guarantee has been booked and the failure is not product related (i.e. scaling and fur­ring, incorrect water pressure, pressure relief device operation, electrical installation faults).
6
If the product is no longer covered by the
guarantee, a charge will be made for the site visit and for any parts supplied.
7
Service charges are based on the account being
settled when work is complete, the engineer will then request payment for the invoice. If this is not made to the service engineer or settled within ten working days, an administration charge will be added.
Replacement Parts Policy
Availability: It is the policy of Triton to maintain
availability of parts for the current range of products for supply after the guarantee has expired. Stocks of spare parts will be maintained for the duration of the product’s manufacture and for a period of five years thereafter.
In the event of a spare part not being available a
substitute part will be supplied.
Payment: The following payment methods can be
used to obtain spare parts:
1
By post, pre-payment of pro forma invoice by
cheque or money order.
2
By telephone, quoting credit card (MasterCard
or Visa) details.
3
By website order, www.tritonshowers.co.uk
Triton Showers Triton Road Nuneaton Warwickshire CV11 4NR
Triton is a division of Norcros Group (Holdings) Limited
TRITON STANDARD GUARANTEE
Triton guarantee this product against all mechanical and electrical defects arising from faulty workmanship or materials for a period of two years for domestic use only, from the date of purchase, provided that it has been installed by a competent person in full accordance with the fitting instructions.
Any part found to be defective during this guarantee period we undertake to repair or replace at our option without charge so long as it has been properly maintained and operated in accordance with the operating instructions, and has not been subject to misuse or damage.
This product must not be taken apart, modified or repaired except by a person authorised by Triton. This guarantee applies only to products installed within the United Kingdom and does not apply to products used commercially. This guarantee does not affect your statutory rights.
What is not covered:
1
Breakdown due to: a) use other than domestic
use by you or your resident family; b) wilful act or neglect; c) any malfunction resulting from the incorrect use or quality of electricity, gas or water or incorrect setting of controls; d) faulty installation.
2
Repair costs for damage caused by foreign
objects or substances.
3
Total loss of the product due to non-availability
of parts.
4
Compensation for loss of use of the product or
consequential loss of any kind.
5
Call out charges where no fault has been found
with the appliance.
6 The cost of repair or replacement of pressure relief
devices, showerheads, hoses, riser rails and/or wall brackets, isolating switches, electrical cable, fuses and/or circuit breakers or any other accessories installed at the same time.
7 The cost of routine maintenance, adjustments,
overhaul modifications or loss or damage arising therefrom, including the cost of repairing damage, breakdown, malfunction caused by corrosion, furring, pipe scaling, limescale, system debris or frost.
TRITON reserve the right to change product specification without prior notice. E&OA. © TRITON SHOWERS 2008
Extended Warranty AVAILABLE NOW. Call 0870 067 3333 for more details.
Customer Service: % 0870 067 3333
Scottish and Northern Ireland
Customer Service:
%
0845 762 6591
Trade Installer Hotline: % 0870 067 3767
Fax:
0870 067 3334
www.tritonshowers.co.uk
E mail: technical@tritonshowers.co.uk
Page 25
Pdf Supplied By http://www.plumbworld.co.uk/
Loading...