TREND NBOXBPNC2 User Manual

Page 1
Installation Instructions - Fixing
TX R X
OK
DT RB
DT RA
CT SBCT SA
NBOX(B)/PNC2
Printer Node Controller
Important: Retain these instructions
CONTENTS
1.1 Unpacking 1 - 1
1.2 Storage 1 - 1
SHEET 1: Installation Intructions - Fixing
1.1 Unpacking
1.2 Storing
-10 °C
+50 °C
H O
0
2
95 %RH
1.3 Installation Instructions - Fixing 1 - 1
2.1 Installation Instructions - Configuration 2 - 1
2.2 Connecting to LRM 2 - 4
1
Installation Instructions, TG200266
Sheet 1, Fixing
Sheet 2, Configuring
../24 only
../230 only
It is recommended that the installation should comply with the HSE Memorandum of Guidance on Electricity at Work Regulations 1989.
1.3 Installation - Fixing
Dimensions
1
D T R B
D T R A
C T S BC T S A
D T R B
D T R A
C T S BC T S A
100 mm
Requirements
2
a
!
b
O K
T X R X
70 mm230 mm
181 mm
c
50 mm
O K
T X R X
d
0 °C
24 V
RD S /R S2 32
MO D EM
DT R A
~
OK
DT R B
TX RX
CT S BCT S A
+45 °C
~
Protection : IP30
H O
!
RD S /R S 23 2
0 %RH
2
M OD E M
~
DT RB
DT RA
CT SBCT SA
24 V
~
23 0V
OK
TX R X
95 %RH
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
1 - 1
Page 2
NBOX(B)/PNC2 Installation Instructions - Fixing
T X R X
O K
D T R B
D T R A
C T S BC T S A
1.3 Installation - Fixing (continued)
Mount MBOX
3 4
if using ENCLS/MBOX/IQ22x
ENCLS/MBOX/IQ22x
Installation Instructions
TG200203
Connecting Power
5
/230 230 Vac
either screw terminal
E N L
Mounting
Ø 6 mm
a
b
c
d
ef
O K
D T R B
D T R A
T X RX
C T S BC T S A
Ø 6 mm
NBOX(B)PNC2/230 consumption < =7.5 VA
2 3 0 V
~
~
2 4 V
M O D E M
209 mm
D T R B
D T R A
C T S A
C T S B
172 mm
104.5 mm
R D S /R S 2 3 2
!
O K
T X RX
C N C 2
7 mm
E N L
~
or shrouded plug kit
E N L
E N L
terminal size 0.5 to 2.5 mm
DO NOT APPLY
POWER
~
0
I
a
b
2
d
WARNING: This apparatus must be earthed.
(via mains earth terminal)
Earth the bus bar
c
e
1 - 2
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
Page 3
Installation Instructions - Fixing NBOX(B)/PNC2
T
R
T
R
T
R
T
R
1.3 Installation - Fixing (continued)
Connecting Power (continued)
5
/24 24 Vac or 24 Vdc
0
I
DO NOT APPLY
POWER
Connect Trend Lan (Lan A)
6
elbaCduab2k1duab8k4duab6k9
2819nedleBm0001m0001m0001m0072 7029nedleBm0001m0001m0001m0052
metsysQI
00
2/FH/22/1/1/PT
)1678nedleB(
metsysQI
002/FH/22/2/2/PT
)3278nedleB(
terminal size 0.5 to 2.5 mm
Network Engineering Manual, 92-1735.
m0001m0001m007m0532
m0001m0001m005m0524
24 Vdc:
24 Vac:
WARNING: This apparatus must be earthed.
Polarity independent
2
NBOX/PNC2/24 consumption < =7.5 VA
24 V versions
+24V 0V
24 Vac
0V
Earth
Mat-n-Loc to
24V
terminals adaptor
EJ105383
(supplied)
(via green earth wire)
2k91 duab
2 3 0 V
~
~
2 4 V
J 1 3
M O D E M
D T R A
J 1 2
R D S /R S 2 3 2
!
O K
D T R B
T X R X
C T S BC T S A
Earth the bus bar
fo.oN
seriW
O K
D T R B
D T R A
J 1 3
J 1 2
T X R X
C T S BC T S A
L A N A
2 wire
L A N A
T -
T + R -
R +
R R
e a r t h b u s
Select Printer
7
(Device B - RS232)
Printer must:
• Be able to accept Epson type control codes
• Have an RS232 serial interface with following settings: Baud Rate: 19k2, 9k6, 4k8 or 1k2 Serial/Parallel: Serial Comms type: either 8 bits no parity
Auto Line Feed: On
The PNC2 must have its baud rate and comms type set accordingly, see NBOX & NBOXB/PNC2 installation instructions Sheet 2: Configuration steps 7 and 8.
or 7 bits odd parity
4 wire
R
R
T
R
R
T
T
T T
X
additional terminals
R
R
T
T T
T -
e a r t h b u s
R +
T + R -
additional terminals
T T
R R
X
Connect to Printer
8
(RS232 Port)
cable not supplied with unit
25 Way D type, Male
25 Way D type Male to Male Cable, pins 3, 7, 20 connected straight through
25 Way D type, Male
O K
D T R B
D T R A
T X RX
C T S BC T S A
23 0 V
~
~
24 V
R D S /R S 2 3 2
M O D E M
!
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
1 - 3
Page 4
NBOX(B)/PNC2 Installation Instructions - Fixing
1.3 Installation - Fixing (continued)
Connect Auxiliary Supply Output
9
O K
D T R B
D T R A
J 1 3
J 1 2
terminal size 0.5 to 2.5 mm
Configure/Commission
11
T X R X
C T S BC T S A
2
PNC2
24 V
2
Close Flap
10
24 V
AUX
I max = 150
mA
NBOX(B)/PNC2 Installation Instructions
- Sheet 2: Configuration.
1 - 4
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
Page 5
Installation Instructions - Configuration
A D D R E S S
O N
D U M B
N O R M
NBOX(B)/PNC2
Printer Node Controller
SHEET 2: Installation Instructions - Configuration
2.1: Installation - Configuration
Fix Unit
1
NBOX(B)/PNC2
Installation Instructions -
Sheet 1: Fixing
1
Open Flap
4
a
Switch off
2
O
I
Open MBOX
3
if unit fitted in ENCLS/MBOX/IQ22x
a
b
2
Set the Network Address
5
(Lan A)
b
O K
D T R B
D T R A
T X R X
C T S BC T S A
= D
NBOX(B)/PNC2
= D
/
e.g.
Address = 2+16+64= 82
SET
NOT SET
J1 3
J1 2
Address = D
= D
/
Set Network Baud Rate
6
(Baud A)
Baud B Baud A
move link to set baud rate
e.g 9k6
Baud B Baud A
O K
D T R B
D T R A
T X R X
J1 3
J1 2
Network Baud Rate = R1
= R1
C T S BC T S A
= R1
= R1
= R1
address
e.g 19k2
1, 4 to 9, 11 to 114 0, 2, 3, 10 or >119
Set RS232 Port to Printer Baud Rate
7
(Baud B)
Baud B Baud A
Printer Baud Rate = R2
move link to set baud rate
Baud B Baud A
= D
/
J1 3
J1 2
= R2
D T R B
D T R A
C T S BC T S A
= R2
NBOX(B)
/PNC2
O K
T X R X
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
2 - 1
Page 6
NBOX(B)/PNC2 Installation Instructions - Configuration
0
I
T X R X
O K
D T R B
D T R A
C T S BC T S A
J 13
J 12
2.1 Installation - Configuration (continued)
Set Dumb/Normal switch to Printer Comms Type
8
e.g.
O N
A D D R E S S
D U M B
N O R M
Set up printer
9
Set printer RS232 serial interface as follows: Baud rate set as step 7 above (1k2, 4k8, 9k6, or 19k2) Comms type set as step 8 above
either 8 bits no parity or 7 bits odd parity
Auto Line Feed: On
Set Battery Links On
if NBOXB
11
Dumb
Sets Printer Comms Type to: 8 bits no parity
Norm
Sets Printer Comms Type to: 7 bits odd parity
Switch On
10
Close flap
12
O N O N
J 1 3
O F F O F F
Check Node Controller
13
a (power)
(green)
b (watchdog)
(red)
a
O K
D T R B
D T R A
T X R X
J1 3
J1 2
C T S BC T S A
b
Note: Batteries must be charged for 16 hours before they will support
J 1 2
unit during mains failure
D T R A
J1 3
J1 2
O K
D T R B
T X R X
C T S BC T S A
Check supply
PNC2 Faulty
2 - 2
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
Page 7
Installation Instructions - Configuration NBOX(B)/PNC2
O
I
NBOX(B)/PNC2
?
2.1 Installation - Configuration (continued)
14
L A N A
T - T + R - R +
Check Network
(Lan A)
D T R B
D T R A
J 1 3
OK
J 1 2
C T S BC T S A
PNC2 faulty
T X R X
O K
L A N A
T - T + R - R +
aRX
(yellow)
bTX
(yellow)
c OK
(green)
NBOX(B)/PNC2
NBOX(B)/PNC2
?
Network Address invalid
0, 2, 3 or >119
OK
Check Network cabling for short circuits with a multimeter (NOT Megger)
Check baud rate Power up other nodes until
faulty node is found (OK ). Correct fault.
Configure Alarm Language
15
if required
The PNC2 will automatically set its alarm language to that of the other nodes on the local Lan if possible (otherwise stays in English). It may be changed if required:
PNC2
Recommend use of PowerTool or Wupdn
Set language by R(P=x) where x defines language as follows: x=0 English, =1 Spanish, =2 Finnish, =3 Swedish, =4 Norwegian, =5 Danish, =6 German, =7 Italian, =8 Portuguese, =9 French.
Note that if the PNC2 is reset by power up or on change of address or baud rate, the PNC2 will automatically set its language
Check System
16
! alarm ! alarm
IQ
Lan
PNC2
IQ Configuration Manual 90-1533 PNC2 Data Sheet TA200263 PowerTool Manual TE200163 Wupdn Manual TE200162
Close MBOX
17
if fitted in ENCLS/MBOX/IQ22x
a
b
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04
2 - 3
Page 8
NBOX(B)/PNC2 Installation Instructions - Configuration
2.2 Connecting to LRM
1
5
J1 3
J1 2
Switch off
Set Battery Links Off
2
if NBOXB
O N O N
O
J 1 3
I
J 1 2
O F F O F F
J1 3
J1 2
Connect LRM, pushbutton, alarm/lamp
WARNING:
Static Sensitive
devices
417-IEC-5134
2 4
-
R
I N
+
0
P N C 2
ET 1
J1 7
J1 6
D ev B
J1 5
D ev A
La n A
J7
L A T C H I N G R E L A Y
2 4 V d c
P u s h b u t t o n
0 V
1
S i g n a l
2 3
7 7 - 0 1 3 6 I S S 1
J 1 7
Open Flap
3
a
O K
D T R B
D T R A
TX RX
C T SBC T S A
b
Remove Cover
4
a
b
c
Set Latching Action Link on LRM
6
7 7 - 0 1 3 6 I S S 1
0
C
1
2
C
3
N C
4
N O
A l a r m o r L a m p
Set Link to +
I N
+
L A T C H IN G R E L A Y
2 4
R
-
N C
N O
C
C
2
3
4
1
Check PNC2/LRM System
7
a Send Alarm
! alarm
Lan
b Check Alarm Annunciator
IQ
Lan
c Check Reset
IQ
Lan
PNC2IQ
P u s h b u t t o n
PNC2
P u s h b u t t o n
PNC2
P u s h b u t t o n
A l a r m
L R M
o r L a m p
A l a r m
L R M
o r L a m p
A l a r m
L R M
o r L a m p
! alarm
Replace Cover
8
Set Battery
10
Links On
if NBOXB
J1 3
J1 2
O K
D T R B
D T R A
TX RX
C T SBC T S A
O N O N
J 1 3
O F F O F F
Switch On
9
0
I
Close Flap
11
J 1 2
Trend Control Systems Ltd reserves the right to revise this publication from time to time and make changes to the content hereof without obligation to notify any person of such revisions or changes.
Website www.trend-controls.com
Fax (UK) +44 (0)1403 241608
E-mail trendinfo@novar.com
2 - 4
P.O. Box 34, Horsham, West Sussex, RH12 2YF United Kingdom Telephone +44 (0)1403 211888
Fax (International) +44 (0)1403 210982
Registered office. Novar House 24 Queens Road Weybridge Surrey KT13 9UX Registered in England No 1664519
NBOX(B)/PNC2 Printer Node Controller Installation Instructions TG200266 Issue 1/C 21/07/04