Important: Retain these instructions
Installation Instructions - Sheet 1
IQLROUTER/.../24VAC
IQL Lon Router
CONTENTS
1.1 Unpacking ............................................. 1-1
1.2 Storage ............................................. 1-1
1 INSTALLATION
1.1 UNPACKING
1.2 STORAGE
-10 °C
(14 °F)
+50 °C
(122 °F)
H O
2
1.3 INSTALLATION - MOUNTING
Note that this product may involve Lonworks system integration . This procedure should
only be performed by an installer with Lonworks engineering expertise.
!
90 %RH
0
1.3 Installation - Mounting ................................ 1-1
1.4 Installation - Configuration ......................... 2-1
2 Reset IQLROUTER/../24VAC ....................... 2-3
3 Disposal ............................................. 3-4
1
IQLROUTER/24
Installation Instructions
TG200791
1
2
It is recommended that the
installation should comply with
the HSE Memorandum of
Guidance on Electricity at Work
Regulations 1989.
For USA install equipment in accordance
with the National Electric Code.
Sheet 1
Sheet 2
Dimensions
1
185 mm (7.28”)
152 mm (5.98”)
89 mm (3.5”)
75 mm (3”)
IQLROUTER/../24VAC Installation Instructions TG200791 Issue 1/C 5/5/06
45 mm
(1.77”)
Requirements
2
a
b
L
OFF
FREE OFF
FREE
BUS
BUS
ON
OFF
11
10
7 8
9
12 13
6
PKT
1 2
3
4
5
LO N - B
LO N - A
A-S VC-B
1 - 1
IQLROUTER/../24VAC Installation Instructions - Sheet 1
1.3 INSTALLATION - MOUNTING (Continued)
Requirements (Continued)
2
c
L
OFF
FREE OFF
FREE
BUS
BUS
ON
OFF
11
8
10
7
9
1213
6
PKT
12
3
4
5
LON - B
LON - A
A-SVC- B
If not installed well outside normal
d
reach (e.g behind false ceiling)
L
OFF
OFF
FREE OFF
FREE
BUS
BUS
ON
OF F
11
7 8
10
9
12 13
6
PK T
1 2
3
4
5
LO N - B
LO N - A
A-S VC-B
BUS
ON
OFF
78 9
6
PKT
12
3
4
5
LON - A
A-SVC -B
FREE O FF
FREE
BUS
11
10
121 3
LON - B
g For IQL ROUTER/NOVAR/UL/24VAC only
UL rated as 'UL916, open listed energy
management equipment accessory’
OFF
FREE OFF
FREE
BUS
BUS
ON
OFF
11
10
7 8
12 13
9
6
PKT
1 2
3
4
5
LO N - B
LO N - A
A-S VC-B
OFF
FREE OFF
FREE
BUS
BUS
ON
OF F
11
7 8
10
9
12 13
6
PK T
1 2
3
4
5
LO N - B
LO N - A
A-S VC-B
Mounting
3
e
0 °C
(32 °F)
0
Protection: IP20
+45 °C
(113 °F)
90 %RH
f
Avoid locations where corrosive
fumes or explosive vapours are
present. Avoid electrical noise
interference.
Either surface mount
ab
170 mm
(6.69”)
2 holes
∅ 6 mm
(0.24”)
or DIN rail mount
a
1 - 2
b
IQLROUTER/../24VAC Installation Instructions TG200791 Issue 1/C 5/5/06
c
Installation Instructions - Sheet 1 IQLROUTER/../24VAC
1.3 INSTALLATION - MOUNTING (Continued)
Lift hinged cover
c
4
a
CAUTION: Failure to use a screwdriver to open the cover will cause damage to the unit.
Connect Lonworks Bus
b
5
T e r m i n a to r
2
OF F
FR EE OFF
FR EE
BU S
O N
O FF
7 8
9
6
P KT
1 2
3
4
5
L ON - A
A -SV C- B
BU S
11
10
12 13
L ON - B
8 9 1 0 1 1L o n B
Lon
Lon
Lon
Polarity independent
T e r m in a t o r
Terminal size 0.5 to 2.55 mm
(14 to 20 AWG)
Network Side A Network Side B
4 5 6 7
L o n A
Lon
Polarity independent
Lonworks - FTT (free topology)
Star topology* Bus topology* Loop topology*
T e r m i n a to r
*Terminate Lonworks bus at one point
only
Terminate at IQLROUTER using integrated
Lon terminater link A (see step 6).
elbaChtgnelsubxaMedonotedonxaM
20158nedleB)tf0461(m005)tf0461(m005
002/FH/61/0/1/PTdnerT
)1748nedleB(
GWA22,VIleveLLU)tf0461(m005)tf0131(m004
8.0x2x2Y)tS(YJ)tf0461(m005)tf0501(m023
865AIT)tf5741(m054)tf028(m052
GWA42,5.taCA
Terminated using integrated Lon terminater link B (see step 6)
Integrated Lon terminater link A set to
OFF (see step 6)
(m005)tf0131(m004
)tf0461
SCN
LonA
Do not allow wires to cross on a loop
LonA
LonB
IQL ROUTER
A
1
4
3
1
2
B
3
2
LINC
LonB
SCN
Maximum 64 nodes per
Lonworks segment
Maximum 40 IQLs (and
LONCs) per virtual Lan
IQL ROUTER
B
A
3
1
2
4
3
1
2
IQL
IQL
y
4
x
IQL
4
x
y
x
IQL
y
y
x
Terminated using integrated Lon terminater link B (see step 6).
If used with LPT-10 (powered bus), cable lengths differ - see Link Power Transceiver
User’s Guide (078-0105-01C) available from Echelon.
IQLROUTER/../24VAC Installation Instructions TG200791 Issue 1/C 5/5/06
1 - 3