Toshiba BMS-IFLSV1E APPLICATION CONTROL MANUAL

INSTALLATION MANUAL
TCS-NET RELAY INTERFACE
BMS-IFLSV1E
• Thank you very much for purchasing this TOSHIBA TCS-NET Relay Interface.
• Please read this manual carefully beforehand for proper installation of the relay interface.
CONTENTS
Precautions for Safety.................................................................................................................... 1
Introduction ..................................................................................................................................... 2
1 Installation .................................................................................................................................... 3
Connection of Power cables/Earth wires/Signal wires ............................................................................
2
3 Setting .......................................................................................................................................... 6
4
Precautions for Safety
• Read these "Precautions for Safety" carefully before installation.
• The precautions described below include important items regarding safety. Observe them without fail.
• After the installation work, perform a trial operation to check for any problem. Follow the Owner's Manual to explain how to use and maintain the unit to the customer. Ask the customer to keep this Installation Manual together with the Owner's Manual.
WARNING
• Ask an authorized dealer or qualified installation professional to install or reinstall the relay
interface.
Improper installation may result in electric shock or fire.
• Perform installation work properly according to this Installation Manual.
Improper installation may result in electric shock or fire.
• Do not modify the unit.
Any modification may cause a malfunction, resulting in overheating or fire.
CAUTION
• Perform wiring correctly in accordance with specified the current capacity.
Failure to do so may result in short-circuiting, overheating, or fire.
• Connect the specified cables for the terminals securely to prevent external forces from
affecting them.
Failure to do so may result in disconnection, overheating, or fire.
1
Introduction
nApplications/Functions/Specifications Applications/Functions/Specifications
• Applications
The TCS-NET Relay Interface is used to connect air conditioners (with TCC-LINK installed) to the air conditioner control system.
• Functions
The TCS-NET Relay Interface converts signals between TCC-LINK and RS-485.
• Specifications
Power supply
Current
Power consumption
Operating temperature/humidity
Storage temperature
Chassis material
Dimensions
Mass
External View
1
2
220 - 240 V, AC 50/60 Hz
18 mA
2.4 W
0 to 40 °C, 10 to 90% RH (no condensation)
-20 to +60 °C
Galvanized sheet metal 0.8t (no coating)
66 (H) x 170 (W) x 200 (D) mm
1 kg
Parts name
200
6- 5.5 mounting holes
22787822
Case
Case lid
Grommet
Grommet
Grommet for power supply
66
63.6
Specifications
Galvanized sheet metal
Galvanized sheet metal
C30-SG20A
C30-SG20A
C30-SG20A
3
4
147
Top side
5
22787822
156
170
Bottom side
2
Before Installation
Check the following package contents.
No.
1
TCS-NET Relay Interface
2
Installation Manual
3
Screw
Item
Quantity
1
1
4
Remarks
M4 x 12mm tapping screws
Use the following wiring materials to connect the signal lines. (Procured on site)
No.
1
Signal line
1
2
For TCC-LINK
For RS-485
Installation
Type
Wire size
Length
Type
Wire size
Length
2-core shield wires
1.25 mm2, 1000m max.
2.00 mm2, 2000m max.
2-core shield wires
1.25 mm2, 500m max. (total length)
Description
(total length including air conditioner area)
TCS-NET Relay Interface Installation Method and Orientation
There are five installation methods for this relay interface as shown below: surface mount and wall mounts. Use the attached screws.
REQUIREMENT
Do not install the unit in any of the following places.
• Humid or wet place
• Dusty place
• Place exposed to direct sunlight
• Place where there is a TV set or radio within one meter
• Place exposed to rain (outdoors, under eaves, etc.)
Installation Space and Maintenance Space
A side space for connecting through cable inlets and an upper space for maintenance must be reserved before installation. The other sides can be adjacent to surrounding objects.
No good
100mm
100mm
3
ON
1 2
ON
1 2
Connection of Power cables/Earth wires/
2
Signal wires
CAUTION
• The RS-485 signal lines have polarity. Connect A to A, and B to B. If connected with incorrect
polarity, the unit will not work.
• The TCC-LINK signal lines have no polarity.
Power cables/Earth wires/Signal wires
Connect power cables, earth wires, and signal wires to the specified terminals on the terminal block.
Secure each cable with a cable clamp.
Air conditioner
Intelligent server
Connect the shield wire of the TCC-LINK communication wire to the earth on the air conditioner side. Do not connect the shield wire to the terminal block. It should be open and insulated.
FG
U2 U1
TCC- LINK
RS-485
BA
Connect the shield wire of the RS-485 communication wire to the earth on the intelligent server side. Do not connect the shield wire to the terminal block. It should be open and insulated.
SW6
ON
12
SW5
ON
12
SW7
LED5
LED4
LED3
LED2
LED1
SW4
1
O N
2
3
4
SW2 SW3
SW1
Connect the earth wire to the earth terminal on the chassis.
L N
Power supply
Length of stripped power cable
35 10
55 10
L N
Length of stripped RS-485 communication wire
REQUIREMENT
Install a breaker at the primary side of the power supply.
35 10
4
Connection of Power cables/Earth wires/
2
Signal wires (continued)
Wiring Connection
The following describes a connection example when using two or more TCS-NET Relay Interface units.
• Terminator resistor setting (See “3 SETTING” for the setting method.)
• Set the RS-485 terminator resistor to “120 ohm” for No.1 (relay interface address SW1=1) TCS-NET
Relay Interface unit, and set to “open” for other units.
• Set the TCC-LINK terminator resistor to “open” as it is set on the air conditioner side.
• Shield earthing
• The shield of RS-485 signal wires should be connected at closed end, and the terminal end should
be open and insulated. The shield earth of the RS-485 signal wires should be single-point earth at the intelligent server. The shield earth of the RS-485 signal wires should be single-point earth.
The shield of TCC-LINK signal lines should be connected at the closed end, and the TCS-NET Relay Interface terminal end should be open and insulated. Earth is connected on the air conditioner side.
TOUCH SCREEN CONTROLLER (BMS-TP0640/5120)
INTELLIGENT SERVER (BMS-LSV2E)
TCC-LINK U1 and U2 have no polarity.
The shield of TCC-LINK cable should be open and insulated. It is not connected to the terminal block.
TCC-LINK terminator resistor is set on the air conditioner side. Bit 1 and 2 of SW6 should be OFF.
Connect the shield wires of the two wires.
Red Orange
Red/Orange
Brown/Yellow
A
B
Crimp 3 wires with
A
B
Brown
a closed end wire
Yellow
joint.
FG
U1U2
TCC-LINK
ABLN
RS-485
Power supply
FG
U1U2
The shield of RS-485 cable should be open and insulated. It is not
TCC-LINK
ABLN
RS-485
connected to the terminal block.
CAUTION: RS-485 signals A and B have polarity. Be careful when connecting the RS-485 wires.
Power supply
Set the RS-485 terminator resistor on the No.1 (relay interface address SW1=1) unit. Set bit 1 of SW5 to ON.
ON
ON
ON
ON
SW6
1
SW5
1
SW6
1
SW5
1
Set the RS-485 terminator resistor on the No.1 (relay interface address SW1=1) unit and for Intelligent Server
2
2
8
ADDRESS
2
2
1
ADDRESS
only. Do not set it here.
U4U3
U2 U1
Outdoor
unit
SW1
SW1
U2 U1
Remote
controller
U4U3
U2 U1
Outdoor
unit
U2 U1
Remote
controller
U2 U1
Indoor unit
Indoor unit
U2 U1
Indoor unit
Indoor unit
U4 U3
U2 U1
Outdoor
unit
U2 U1
Remote
controller
U4 U3
U2 U1
Outdoor
unit
U2 U1
Remote
controller
U4U3
Indoor unit
Central
remote controller
U4U3
Indoor unit
Central
remote controller
Set the TCS-NET Relay Interface address with SW1. Assign 1 to 8 to each address to avoid duplication. CAUTION: The SW1 setting is read when the power is turned on. Push the reset switch SW7 after changing the address.
5
3
Setting
The following settings are necessary to use TCS-NET Relay Interfaces.
• SW1 TCS-NET Relay Interface address set switch
When two or more TCS-NET Relay Interfaces are used, set a different address for SW1 to avoid address duplication. Assign addresses in an ascending order.
CAUTION
• Set relay interface addresses according to the air conditioner address table.
For the relay interface whose address SW1=1, perform terminator resistor setting.
• When the SW1 setting has been changed, push the reset switch SW7. The new address
setting is read.
• SW2 Test switch
• SW3 Test switch
• SW4 Test switch
Not used during operation. Set these switches to zero (0) or “all OFF”.
• SW5 RS-485 terminator resistor select switch
Set “120 ohm" only when the relay interface address SW=1, and set “open” for other relay interfaces.
FGU1U2ABLN
RS-485 TCC-LINK
SW6
ON
1
SW5
ON
1
2
2
SW7
LED4
LED2
LED5LED3LED1
1
234
• SW6 TCC-LINK terminator resistor select switch The TCC-LINK terminator resistor is set on the air conditioner side. Set SW6 to “open”.
• SW7 Reset switch When performing an address setting with SW1, push this reset switch after the address setting to read the set value.
SW4
ON
SW3
SW2
SW1
SW1
SW2
SW3
SW4
SW5
SW6
Relay interface address set switch
1-8
0, 9-F
Test switch (0 usually)
Test switch (all OFF usually)
Test switch
RS-485 terminator resistor select switch
1ON2
60 ohm 120 ohm 120 ohm Open
TCC-LINK terminator resistor select switch
Relay interface address
Not used
1ON2
1ON2
1ON2
Note:Bit 2 is not used.
SW7
LED1
LED2
LED3
LED4
LED5
1ON2 1ON2
100 ohm Open
Reset switch
Power indicator
RS-485 communication status indicator
TCC-LINK Communication status indicator
TCC-LINK Communication error indicator
Test indicator
REQUIREMENT
• RS-485 terminator resistor select switch SW5.
Set “120 ohm” only when the TCS-NET Relay Interface address SW=1, and set “open” for other relay interfaces.
• The TCC-LINK terminator resistor is set on the air conditioner side. Set SW6 to “open”.
6
4
Trial Operation Check
Before starting trial operation
Complete the air conditioner trial operation. Turn on the power of the TCS-NET Relay Interface after all cable connections and settings are completed. Then turn on power of the air conditioners and Touch Screen Controller.
Trial operation
Check the TCC-LINK and RS-485 communication status of the TCS-NET Relay Interface by checking the blinking of the LEDs.
CAUTION
For the operation check of the Touch Screen Controller, refer to the Touch Screen Controller Installation Manual.
LED 1
LED 2
LED 3
LED 4
LED 5
• LED1 Power indicator ON: While power is on OFF: When power is not turned on
• LED2 RS-485 communication status indicator Blinking: When RS-485 communication with the Intelligent server is normal OFF: When RS-485 communication with the Intelligent server is disabled
• LED3 TCC-LINK Communication status indicator Blinking: When TCC-LINK communication with any of the air conditioners is normal OFF: When TCC-LINK communication with all air conditioners is disabled
• LED4 TCC-LINK Communication error indicator ON: While TCS-NET Relay Interface cannot send signals due to busy communication on the air
OFF: When communication on the air conditioner side is not busy
• LED5 Test indicator Not used in normal operation Displayed only in the test mode
Power indicator
RS-485 communication status indicator
TCC-LINK Communication status indicator
TCC-LINK Communication error indicator
Test indicator
conditioner side. This state is temporary. This LED turns OFF after a while and communication will restart.
Normal operation
ON
Blinking
Blinking
OFF
OFF
Abnormal operation
OFF
OFF
OFF
ON
ON
DH69609101
7