Toro 139-7133 Installation Instructions

SelfLevelingKit
TXL2000ToolCarrier
ModelNo.139-7133
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
FormNo.3436-312RevA
InstallationInstructions
1
2
3
4
Nopartsrequired
Mountbracket1 Carriagebolt(3/8x1inch) Nut(3/8inch) Self-levelingvalve Straighttting Elbowtting Bolt(5/16x2-1/2inches) Nut(5/16inch) Straighttting Tubewithcentertting Tubewithextraendtting Tube1 Bulkheadtube1 Elbowtting Switch Wireharness1
Qty.
Use
3 3 1 2 2 2 2 1 1 1
1 1
Preparethemachine.
Installthebracketandvalve.
Installthehydraulictubes.
Installtheswitch.
1
PreparingtheMachine
NoPartsRequired
Procedure
1.Parkthemachineonalevelsurface.
2.Lowertheloaderarms.
3.Shutofftheengineandremovethekey.
4.Opentherear-accesscover.
©2020—TheT oro®Company 8111LyndaleAvenueSouth Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3436-312*A
2
InstallingtheBracketand Self-LevelingValve
Partsneededforthisprocedure:
1Mountbracket
3
Carriagebolt(3/8x1inch)
3
Nut(3/8inch)
1
Self-levelingvalve
2
Straighttting
2
Elbowtting
2
Bolt(5/16x2-1/2inches)
2
Nut(5/16inch)
Procedure
1.Looselyinstallthemountbrackettothefront sideoftheelectroniccontrolunitmountusing3 carriagebolts(3/8x1inch)and3nuts(3/8inch) asshowninFigure1.
2.Install2straightttingsand2elbowttingsto theself-levelingvalve(Figure2).
g311823
Figure2
1.Straighttting(2)3.Elbowtting(2)
2.Self-levelingvalve
3.Torquethestraightttings94to115N∙m(69to 85ft-lb).Donottorquetheelbowttingsatthis time.
4.Looselyinstallthevalvetothebracketusing2 bolts(5/16x2-1/2inches)and2nuts(5/16inch) asshowninFigure3.
1.Carriageboltandnut(3)
2.Bracket
Figure1
3.Electroniccontrolunit
g311824
g311822
1.Bolt(2)2.Nut(2)
mount
2
Figure3
3
InstallingtheHydraulic Tubes
Partsneededforthisprocedure:
1
Straighttting
1
Tubewithcentertting
1
Tubewithextraendtting
1Tube
1Bulkheadtube
1
Elbowtting
5.DisconnectthehosefromportB2(top,middle) ontheliftvalve(Figure5).
Figure5
1.Tubewithextraendtting3.PortB2(top,middle)
2.HosefromportB2(top,
middle)
4.Elbowtting
g312132
Procedure
1.Disconnectthehoseandelbowttingfromport A2(bottom,middle)ontheliftvalve(Figure4).
Figure4
1.HosefromportA2(bottom,
middle)
2.Tubewithcentertting
2.InstallastraightttingtoportA2(bottom, middle).Torquethettingto94to115N∙m(69 to85ft-lb).
3.PortA2(bottom,middle)
6.Installthetubewiththeextraendttingfrom portC(right)ontheself-levelingvalvetoportB2 (top,middle)ontheliftvalve(Figure5).
7.Installtheelbowttingtothetubewiththeextra endtting(Figure5).Torquethettingto94to 115N∙m(69to85ft-lb).
8.Installthehosethatyoudisconnectedfromport B2(top,middle)totheelbowttingonthetube.
9.Markanddisconnecttheleftcylinderhosefrom thetubeandtherightcylinderhosefromthe bottomofthebulkhead(Figure6).
g312131
3.Installthetubewithcenterttingfromport D(left)ontheself-levelingvalvetoportA2 (bottom,middle)ontheliftvalve(Figure4).
4.Installthehosethatyoudisconnectedtothe ttingonthetube.
1.PortA1(bottom,right)
2.Tube
3.Mountplate
3
g312148
Figure6
4.Bulkhead,connectedto rightcylinderhose
5.Leftcylinderhose
Loading...
+ 5 hidden pages