Titus Displacment Ventilation User Manual

Installation Manual
Displacement Ventilation Diffusers
Index
Section 1 Index 1.0 Section 2 DVCP (Round Diffuser)
Diffuser Installation & Commissioning 2.0 Duct Cover Installation 2.1
Section 3 DVVC (Radius Corner Diffuser)
Diffuser Installation & Commissioning 3.0 Duct Cover Installation 3.1
Diffuser Installation & Commissioning 4.0 Duct Cover Installation 4.1
DV 5-9-13
Section 5 DVBC (Rectangular Diffuser)
Diffuser Installation & Commissioning 5.0 Duct Cover Installation 5.1
Section 6 DVRI (Rectangular Diffuser)
Diffuser Installation & Commissioning 6.0-.2
Section 7 DVIR (Rectangular Diffuser)
Diffuser Installation & Commissioning 7.0
Installation Manual
DVCP Installation
DV 5-9-13
Step 1 Mark the positions to drill the 4 holes on the bottom plate of the unit.
Step 2 Drill holes to mount the mounting base.
Step 3 Install mounting base to the floor using anchor screws.
Step 4 Install the unit onto the mounting base using pop rivets.
Commissioning (Balancing) The balancing port is positioned on the side behind the decor strip. The K­factor of the unit is stated on the K­factor label mounted on one of the side of the balancing port. The k­factor can also be found on our website in the relevant k-factor guide. See Figure 5
FIGURE 5
2.0
DVCP Duct Cover Parts
Installation Manual
DVCP Duct Cover Installation
DV 5-9-13
2.1
Installation Manual
DVCP Duct Cover Installation
Step 1 Mount the duct cover bottom on the top of the unit.
Duct Cover Bottom
DV 5-9-13
Step 2 Mount the duct cover support assembly on the top of the unit. Align the holes on the flange of the duct cover bottom and the duct cover support assembly and cut the support according to the ceiling height keeping 2” distance between the ceiling and the top of the duct covert support assembly. Align the duct cover top with the three holes on the support assembly and rivet the duct cover top with the duct cover support assembly in 2 places.
DUCT COVER TOP
DUCT COVER
SUPPORTER
2.2
Installation Manual
DVCP Duct Cover Installation
DV 5-9-13
Step 3 Install the duct onto the unit. Install the second duct cover top to the duct cover support assembly enclosing the duct. Assemble both the duct cover top together using pop rivets.
Step 4 Assemble all four duct cover support assemblies to the duct cover bottom using pop rivets.
2.3
Installation Manual
DVCP Duct Cover Installation
DV 5-9-13
Step 5 Align the top edge of the duct cover support assembly with the top face of the extension and install the extension assembly onto the duct cover support assembly using screws. (Décor strip of the unit should align with the décor strip of the duct cover assembly)
Step 6 Place the duct cover on the top of the unit and assemble it to the duct cover support assembly using screws. Snap the décor strips into the springs of the duct cover support assemblies.
2.4
Installation Manual
DVVC Installation
DV 5-9-13
Step 1 Drill the holes on the bottom plate of the unit and the mounting base. Install the mounting base into place using screws.
Step 2 Install wall brackets to the wall using screws and slide the bottom of the unit into the angle wall brackets.
Step 3 Install wall bracket to the wall to hold the top of the unit using screws.
Commissioning (Balancing) The balancing port is positioned on the side behind the decor strip. The K-factor of the unit is stated on the K-factor label mounted on one of the side of the balancing port. The k-factor can also be found on our website in the relevant k­factor guide. See Figure 5
FIGURE 4
3.0
DVVC Duct Cover Parts
Installation Manual
DVVC Installation
DV 5-9-13
3.1
Installation Manual
DVVC Duct Cover Installation
DV 5-9-13
Step 1 Cut the brackets according to the ceiling height keeping 0-2” distance between the ceiling and top of the bracket.
Step 2 Using spacers align the brackets to the end of the unit keeping 0.67” distance from the end face of the unit. Screw the left and right brackets to the wall.
3.2
Installation Manual
DVVC Duct Cover Installation
DV 5-9-13
Step 3 Install the duct onto the unit. Align the top edge of the brackets with the top face of the extension and install the extension assembly onto the brackets using screws.
Step 4 Place the duct cover assembly on the top of the unit and assemble it to the brackets using screws. Snap the décor strips into the springs of the extension and duct cover assemblies.
3.3
Installation Manual
DVHC Installation
DV 5-9-13
Step 1 Drill the holes on the bottom plate of the unit and the mounting base. Install the mounting base into place using screws.
Step 3 Install wall bracket to the wall to hold the top of the unit using screws.
Step 2 Install wall bracket to the wall using screws and slide the bottom of the unit into the angle wall bracket.
Commissioning (Balancing) The balancing port is positioned on the side behind the decor strip. The K­factor of the unit is stated on the K­factor label mounted on one of the side of the balancing port. The k-factor can also be found on our website in the relevant k-factor guide. See Figure 4
FIGURE 4
4.0
DVHC Duct Cover Parts
Installation Manual
DVHC Duct Cover Installation
DV 5-9-13
4.1
Installation Manual
DVHC Duct Cover Installation
DV 5-9-13
Step 1 Cut the brackets according to the ceiling height keeping 0-2” distance between the ceiling and top of the bracket.
Step 2 Using spacers align the brackets to the end of the unit keeping 0.67” distance from the end face of the unit. Screw the left and right brackets to the wall.
4.2
Installation Manual
DVHC Duct Cover Installation
DV 5-9-13
Step 3 Install the duct onto the unit. Align the top edge of the brackets with the top face of the extension and install the extension assembly onto the brackets using screws.
Step 4 Place the duct cover assembly on the top of the unit and assemble it to the brackets using screws. Snap the décor strips into the springs of the extension and duct cover assemblies.
4.3
Installation Manual
DVBC Installation
DV 5-9-13
Step 1 Drill the holes on the bottom plate of the unit and the mounting base. Install the mounting base into place using screws.
Step 3 Install wall bracket to the wall to hold the top of the unit using screws.
Step 2 Install wall bracket to the wall using screws and slide the bottom of the unit into the angle wall bracket.
Commissioning (Balancing) The balancing port is positioned on the side behind the decor strip. The K-factor of the unit is stated on the K-factor label mounted on one of the side of the balancing port. The k-factor can also be found on our website in the relevant k­factor guide. See Figure 4
FIGURE 4
5.0
DVBC Duct Cover Parts (For Size 12-36)
Installation Manual
DVBC Duct Cover Installation
DV 5-9-13
5.1
Installation Manual
DVBC Duct Cover Installation
DV 5-9-13
Step 1 Cut the brackets according to the ceiling height keeping 0-2” distance between the ceiling and top of the bracket.
Step 2 Using spacers align the brackets to the end of the unit keeping 0.67” distance from the end face of the unit. Screw the left and right brackets to the wall.
Step 3 Install the duct onto the unit. Align the top edge of the brackets with the top face of the extension and install the extension assembly onto the brackets using screws.
5.2
Installation Manual
DVBC Duct Cover Installation
DV 5-9-13
Step 4 Mount the mounting fixture assembly on the top of the unit.
Step 5 Slide the duct cover in-between the mounting strip and the aluminum strip and assemble it to the brackets using screws. Snap the décor strips into the springs of the extension and duct cover assemblies.
5.3
Installation Manual
DVRI Installation
Step 1 Drill the holes and install the mounting base into place using screws.
DV 5-9-13
Step 2 In Wall Mounting - Install the four Angle brackets on the top of the unit using screws. (You may need to cut the angle strips to match the overall dimensions of the unit.) Install the unit into the wooden frame and screw to the sides. Install angle strips from the sides to the front of the unit using screws.
6.0
Installation Manual
DVRI Installation
DV 5-9-13
Step 3 Floor Mounting - Using Angle Strips screw the unit to the wall from the top and the sides. (You may need to cut the angle strips to match the overall dimensions of the unit.)
Step 4 Mounting against the wall - Using Angle Strips screw the unit against the wall from the top and the bottom. (You may need to cut the angle strips to match the overall dimensions of the unit.)
6.1
Installation Manual
DVRI Installation
Commissioning (Balancing) Uninstall the front cover for maintenance. For Size < 10 the balancing port is positioned on the side of the unit behind the white plug and For Size > 12 the balancing port is positioned in the center behind the decor strip. The K-factor of the unit is stated on K-factor label mounted on long bracket behind the front cover for Size < 10 and on one of the side of the balancing port for Size > 12. The k-factor can also be found on our website in the relevant k-factor guide. See Figure 4
DV 5-9-13
FIGURE 4
6.2
Installation Manual
DVIR Installation
DV 5-9-13
Step 1 Screw the Plenum-Inlet Assembly into place through the sides. (Note: Plenum­Inlet Assembly is mounted before the wall board is fixed)
Step 2 Install the Mounting frame-Distributor assembly to the wall board using screws.
Step 3 Install front cover onto the Mounting frame-Distributor assembly.
Commissioning (Balancing)
Uninstall the front cover for commissioning. The balancing port is positioned on the lower edge of the unit. The K-factor of the unit is stated on K­factor label placed on one of the side of the Plenum box. The k-factor can also be found on our website in the relevant k­factor guide. See Figure 4
FIGURE 2
FIGURE 4
7.0