![](/html/b1/b128/b128e1c45f7f7c933705af0635ccab6e79838c6d271795eb2bac4a31ad480c97/bg1.png)
DETACHABLE IN-SERVICE GUIDE
![](/html/b1/b128/b128e1c45f7f7c933705af0635ccab6e79838c6d271795eb2bac4a31ad480c97/bg2.png)
DIRECTIONS FOR USE
Please refer to the IFU for a complete statement of the indications, contraindications, warnings, and instructions for use
supplied with each device. Always follow the IFU.
Step 1
Before opening the packaging, conrm correct coil size. Also check the coil expiration date. Open package and
remove hoop.
Conrm correct coil size Check coil expiration date
32
Open package and remove hoop
![](/html/b1/b128/b128e1c45f7f7c933705af0635ccab6e79838c6d271795eb2bac4a31ad480c97/bg3.png)
Step 2 Step 3
Gently remove clear cap from the delivery system. Prior to using the device, insert the proximal end of the delivery pusher
into the funnel section of the AZUR® Detachment Controller; DO NOT PRESS BUTTON.
Remove clear cap from the
delivery system
Insert the proximal end of the
delivery pusher into the controller.
If light does not light, replace the
®
AZUR
Detachment Controller.
IMPORTANT: Do not press button at any time during Step 3.
If a red light appears, replace the
AZUR® Detachment Controller.
If the indicator light remains solid
green, continue using the AZUR®
Detachment Controller.
Do not press button.
54