T
R
I
V
I
E
W
RACK MO
Installation Instructi
UNT KIT TRK-
on
172
Warning: 1. At least two persons are necessary to m
2. Do not use over force when fastening the screws
TRK-172 used for m
m
odel: TCM-
Instructions
1701
:
1. Go to step 2 if did not purchase
with the screws (M4x12mm) provi
2. Take off 6 screws from left
3
. Install TRK-
16mm
4. M
head, ph
Notes
Long, flat head, ph
oun
t the whole set onto the rack frame
illips drive. (these screws are provi
:
1. Standard 19"
stock
2. The
.
gap betw
ounting 17" CRT color monitors on the 19" standard rack, compatible monitor
.
handle TRH-
171. Secure the
ded, see Fig. 1.
and right side of the monitor, (these screws not used again).
172 bracke
t to left
and right side of the monitor using the provided screws (M6
illips) in the package, 3 each side, see FIG. 2.
by using
6
ded by rack manufacturer
open rack m
odel: TOR-
1901)
and cabinet rack (m
een monitors or other equipments can be covered by blank panel or vent
2U, 3U available. (Contact salesperson for detail)
8.0
"
oun
t the monitor on the rack
.
handle TRH-
pieces screws
,
: M5
, see FIG. 3 below.
)
odel: TCR-1901) are available in
19" St
Model TOR-
.
171 to TRK-172 bracke
,
length 10mm,
pan or truss
panel, 1U
andard O
pen Rack
1901
t
,
14.00
"
FIG. 1
FIG. 2
TATUNG COMPANY OF AMERICA, I
2850 EL PRESIDIO ST, LONG BEACH, CA 90810
TEL: 310.637.2105 FAX: 310.631.4758
NC
TRH-171
TRK-172
TRK-172
FIG. 3