T
R
I
V
I
E
W
RACK MO
Installation Instructi
UNT KIT TRK-
on
142
Warning: 1. At least two persons are necessary to m
2. Do not use over force on the screws.
TRK-142 used for m
m
odel including: TCM-
Instructions
1. Go to step 2 if did not purchase
the screws (M4x12mm) provided, see Fig. 1.
2. Take off 4 screws from left
3
. Install TRK-
l
ength12mm, flat
4. M
oun
head, ph
Notes
1. Standard 19"
stock
2. The
2U, 3U available. (Contact salesperson for detail)
:
t the whole set onto the rack frame
illips drive. (these screws are provi
:
.
gap betw
ounting 14" or 15" CRT color monitors on the 19" standard rack, compatible
1401, TCM-1402S
handle TRH-
and right side of the monitor, (these screws not used again).
142 bracke
open rack m
een monitors or other equipments can be covered by blank panel or vent
t to left
head, ph
and right side of the monitor using the screws provided (M5
illips) in the package, 2 each side, see FIG. 2.
odel: TOR-
6.0
and TCM-1501
by using 6 pieces screws: M5, l
1901)
"
141. Secure
ded by rack manufacturer
and cabinet rack (m
oun
t the monitor on the rack
.
handle TRH-
, see FIG. 3 below.
)
odel: TCR-1901) are available in
.
141 to TRK-141 bracket wit
,
ength 10mm,
pan or truss
panel, 1U
,
h
FIG. 1
FIG. 2
12.25
19" St
andard O
"
TRK-141
TRH-141
TRK-141
FIG. 3
Model TOR-
pen Rack
1901
TATUNG COMPANY OF AMERICA, I
2850 EL PRESIDIO ST, LONG BEACH, CA 90810
TEL: 310.637.2105 FAX: 310.631.4758
NC