Supermicro SUPERSERVER 8016B-TLF User Manual

SUPER
SUPERSERVER
8016B-TLF
®
USER’S MANUAL
Revision 1.0
The information in this User’s Manual has been carefully reviewed and is believed to be accurate. The vendor assumes no responsibility for any inaccuracies that may be contained in this document, makes no commitment to update or to keep current the information in this manual, or to notify any person or organization of the updates. Please Note: For the most up-to-date version of this
manual, please see our web site at www.supermicro.com.
Super Micro Computer, Inc. ("Supermicro") reserves the right to make changes to the product described in this manual at any time and without notice. This product, including software and docu­mentation, is the property of Supermicro and/or its licensors, and is supplied only under a license. Any use or reproduction of this product is not allowed, except as expressly permitted by the terms of said license.
IN NO EVENT WILL SUPERMICRO BE LIABLE FOR DIRECT, INDIRECT, SPECIAL, INCIDENTAL, SPECULATIVE OR CONSEQUENTIAL DAMAGES ARISING FROM THE USE OR INABILITY TO USE THIS PRODUCT OR DOCUMENTATION, EVEN IF ADVISED OF THE POSSIBILITY OF SUCH DAMAGES. IN PARTICULAR, SUPERMICRO SHALL NOT HAVE LIABILITY FOR ANY HARDWARE, SOFTW ARE, OR DA TA STORED OR USED WITH THE PRODUCT, INCLUDING THE COSTS OF REPAIRING, REPLACING, INTEGRATING, INSTALLING OR RECOVERING SUCH HARDWARE, SOFTWARE, OR DATA.
Any disputes arising between manufacturer and customer shall be governed by the laws of Santa Clara County in the State of California, USA. The State of California, County of Santa Clara shall be the exclusive venue for the resolution of any such disputes. Super Micro's total liability for all claims will not exceed the price paid for the hardware product.
FCC Statement: This equipment has been tested and found to comply with the limits for a Class A digital device pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environ­ment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the manufacturer’s instruction manual, may cause harmful interference with radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case you will be required to correct the interference at your own expense.
California Best Management Practices Regulations for Perchlorate Materials: This Perchlorate warn­ing applies only to products containing CR (Manganese Dioxide) Lithium coin cells. “Perchlorate Material-special handling may apply. See www.dtsc.ca.gov/hazardouswaste/perchlorate”
WARNING: Handling of lead solder materials used in this product may expose you to lead, a chemical known to the State of California to cause birth defects and other repro­ductive harm.
Manual Revision 1.0 Release Date: July 26, 2011
Unless you request and receive written permission from Super Micro Computer, Inc., you may not copy any part of this document.
Information in this document is subject to change without notice. Other products and companies referred to herein are trademarks or registered trademarks of their respective companies or mark holders.
Copyright © 2011 by Super Micro Computer, Inc. All rights reserved.
Printed in the United States of America
Preface
About This Manual
This manual is written for professional system integrators and PC technicians. It provides information for the installation and use of the SuperServer 8016B-TLF. In­stallation and maintenance should be performed by experienced technicians only.
The SuperServer 8016B-TLF is a high-end quad processor server based on the SC818A-1400B 1U rackmount server chassis and the Super X8QBE-LF serverboard. The X8QBE-LF supports four Intel® E7-4800/7500 Series processors - please refer to our web site for an up-to-date list of supported processors.
Manual Organization
Preface
Chapter 1: Introduction
The fi rst chapter provides a checklist of the main components included with the server system and describes the main features of the Super X8QBE-LF serverboard and the SC818A-1400B chassis.
Chapter 2: Server Installation
This chapter describes the steps necessary to install the SuperServer 8016B-TLF into a rack and check out the server confi guration prior to powering up the system. If your server was ordered without the processor and memory components, this chap­ter will refer you to the appropriate sections of the manual for their installation.
Chapter 3: System Interface
Refer to this chapter for details on the system interface, which includes the functions and information provided by the control panel on the chassis as well as other LEDs located throughout the system.
Chapter 4: System Safety
You should thoroughly familiarize yourself with this chapter for a general overview of safety precautions that should be followed when installing and servicing the SuperServer 8016B-TLF.
iii
SUPERSERVER 8016B-TLF User's Manual
Chapter 5: Advanced Serverboard Setup
Chapter 5 provides detailed information on the X8QBE-LF serverboard, including the locations and functions of connectors, headers and jumpers. Refer to this chapter when adding or removing processors or main memory and when reconfi guring the serverboard.
Chapter 6: Advanced Chassis Setup
Refer to Chapter 6 for detailed information on the SC818A-1400B 1U rackmount server chassis. You should follow the procedures given in this chapter when install­ing, removing or reconfi guring Serial ATA or peripheral drives and when replacing system power supply units and cooling fans.
Chapter 7: BIOS
The BIOS chapter includes an introduction to BIOS and provides detailed informa­tion on running the CMOS Setup Utility.
Appendix A: BIOS Error Beep Codes
Appendix B: System Specifi cations
iv
Notes
Preface
v
SUPERSERVER 8016B-TLF User's Manual
Table of Contents
Chapter 1 Introduction
1-1 Overview .........................................................................................................1-1
1-2 Serverboard Features .....................................................................................1-2
Processors ......................................................................................................1-2
Memory ...........................................................................................................1-2
SATA ..............................................................................................................1-2
Rear I/O Ports ................................................................................................. 1-2
ATI Graphics Controller ...................................................................................1-2
IPMI .................................................................................................................1-2
Other Features ................................................................................................ 1-3
1-3 Server Chassis Features ................................................................................1-4
System Power ................................................................................................. 1-4
SATA Subsystem .............................................................................................1-4
Front Control Panel .........................................................................................1-4
Cooling System ............................................................................................... 1-4
1-4 Contacting Supermicro ....................................................................................1-5
Chapter 2 Server Installation
2-1 Overview ............................................................................................................. 2-1
2-2 Unpacking the System .................................................................................... 2-1
2-3 Preparing for Setup .........................................................................................2-1
Choosing a Setup Location .............................................................................2-2
Rack Precautions ............................................................................................ 2-2
Server Precautions ..........................................................................................2-2
Rack Mounting Considerations .......................................................................2-3
Ambient Operating Temperature ................................................................ 2-3
Reduced Airfl ow .........................................................................................2-3
Mechanical Loading ................................................................................... 2-3
Circuit Overloading .....................................................................................2-3
Reliable Ground ......................................................................................... 2-3
2-4 Installing the System into a Rack ................................................................... 2-4
Identifying the Sections of the Rack Rails ...................................................... 2-4
Installing the Inner Rails ................................................................................. 2-4
Installing the Outer Rails .................................................................................2-5
Locking Tabs ..............................................................................................2-5
Installing the Server into the Rack ..................................................................2-6
2-5 Checking the Serverboard Setup ....................................................................2-7
vi
Table of Contents
2-6 Preparing to Power On ................................................................................... 2-9
Chapter 3 System Interface
3-1 Overview .........................................................................................................3-1
3-2 Control Panel Buttons ..................................................................................... 3-1
Reset ...............................................................................................................3-1
Power ..............................................................................................................3-1
3-3 Control Panel LEDs ........................................................................................3-2
Overheat/Fan Fail ........................................................................................... 3-2
NIC2 ................................................................................................................3-2
NIC1 ................................................................................................................3-2
HDD .................................................................................................................3-2
Power ..............................................................................................................3-3
3-4 Drive Carrier LEDs ..........................................................................................3-3
Chapter 4 System Safety
4-1 Electrical Safety Precautions .......................................................................... 4-1
4-2 General Safety Precautions ............................................................................4-2
4-3 ESD Precautions ............................................................................................. 4-3
4-4 Operating Precautions .................................................................................... 4-4
Chapter 5 Advanced Serverboard Setup
5-1 Handling the Serverboard ............................................................................... 5-1
Precautions .....................................................................................................5-1
Unpacking .......................................................................................................5-2
5-2 Serverboard Installation ..................................................................................5-2
5-3 Connecting Cables .......................................................................................... 5-3
Connecting Data Cables ................................................................................. 5-3
Connecting Power Cables ..............................................................................5-3
Connecting the Control Panel ......................................................................... 5-3
5-4 I/O Ports ..........................................................................................................5-4
5-5 Installing the Processor and Heatsink ............................................................ 5-5
Memory Support ..............................................................................................5-8
Notes and Restrictions ..............................................................................5-11
5-7 Adding PCI-E Add-On Cards .........................................................................5-11
5-8 Serverboard Details ...................................................................................... 5-12
X8QBE-LF Quick Reference ......................................................................... 5-13
5-9 Connector Defi nitions ................................................................................... 5-14
5-10 Jumper Settings ............................................................................................5-20
5-11 Onboard Indicators ........................................................................................5-23
5-12 SATA Ports ....................................................................................................5-24
vii
SUPERSERVER 8016B-TLF User's Manual
5-13 Installing Software ......................................................................................... 5-25
Supero Doctor III ...........................................................................................5-26
Chapter 6 Advanced Chassis Setup
6-1 Static-Sensitive Devices ..................................................................................6-1
Precautions .....................................................................................................6-1
6-2 Control Panel ..................................................................................................6-2
6-3 System Fans ...................................................................................................6-3
System Fan Failure .........................................................................................6-3
Replacing System Fans ..................................................................................6-3
Removing a Fan .........................................................................................6-3
Installing a Fan ...........................................................................................6-3
6-4 Drive Bay Installation ......................................................................................6-4
Removing the Front Bezel .............................................................................. 6-4
Accessing the Drive Bays ...............................................................................6-5
SATA Drive Installation ....................................................................................6-6
Mounting a Drive in a Drive Carrier ...........................................................6-6
Installing/removing SATA Drives ................................................................6-7
SATA Backplane ......................................................................................... 6-7
DVD-ROM and Floppy Drive Installation ........................................................6-8
6-5 Power Supply .................................................................................................. 6-9
Power Supply Failure ......................................................................................6-9
Removing the Power Supply...........................................................................6-9
Installing a new Power Supply ........................................................................6-9
Chapter 7 BIOS
7-1 Introduction ......................................................................................................7-1
Starting BIOS Setup Utility .............................................................................. 7-1
How To Change the Confi guration Data .........................................................7-1
Starting the Setup Utility ................................................................................. 7-2
7-2 Main Setup ...................................................................................................... 7-2
7-3 Advanced Setup Confi gurations......................................................................7-4
7-4 Boot Confi guration ........................................................................................ 7-29
7-5 Security Settings ...........................................................................................7-29
7-6 Exit Options ................................................................................................... 7-31
Appendix A BIOS Error Beep Codes Appendix B System Specifi cations
viii
Chapter 1: Introduction
Chapter 1
Introduction
1-1 Overview
The 8016B-TLF is a high-end server that is comprised of two main subsystems: the SC818A-1400B 1U server chassis and the X8QBE-LF quad Intel processor serverboard. Please refer to our web site for information on operating systems that have been certifi ed for use with the SuperServer 8016B-TLF (www.supermicro. com).
In addition to the serverboard and chassis, various hardware components have been included with the SuperServer 8016B-TLF, as listed below:
Seven 4-cm hot-swap chassis fans (FAN-0101L4)
One air shroud (MCP-310-81804-0B)
Four CPU passive heatsinks for 1U chassis (SNK-P0044P)
One riser card for PCI-Express x16 slot (CSE-RR1U-E16)
SATA Accessories One SATA backplane (BPN-SAS-818A) Three hot-swap drive carriers (CSE-PT39-B0) One 50-cm iPass to SATA cable (CBL-0116L) One HDD backplane PWS cable (CBL-0385L)
One rail set (MCP-290-00016-0N)
One 8016B-TLF User's Manual
1-1
SUPERSERVER 8016B-TLF User's Manual
1-2 Serverboard Features
At the heart of the SuperServer 8016B-TLF lies the X8QBE-LF, a quad processor serverboard based on the Intel 7500/ICH10R chipset. Below are the main features of the X8QBE-LF. (See Figure 1-1 for a block diagram of the chipset).
Processors
The X8QBE-LF supports four Intel E7-4800/7500 Series processors in LGA1567 sockets. Please refer to the serverboard description pages on our web site for a complete listing of supported processors (www.supermicro.com).
Memory
The X8QBE-LF has 32 DIMM slots that can support up to 1 TB of registered ECC DDR3-1066/978/800 SDRAM. Modules of the same size and speed should be used. See Chapter 5 details.
SATA
A SATA controller is integrated into the South Bridge (ICH10R) section of the chipset to provide a six-port SATA subsystem, which is RAID 0, 1, 10 and (Windows only) 5 supported. The SATA drives are hot-swappable units.
Note: The operati ng system yo u use must h ave R AID su ppor t to e nable t he hot­swap capability and RAI D function of the SATA drives.
Rear I/O Ports
The color-coded I/O ports include one COM port, a VGA (monitor) port, a dedicated IPMI LAN port and two Gb Ethernet ports. Two USB ports are also located here.
ATI Graphics Controller
The X8QBE-LF features an integrated Matrox G200eW video controller. The G200eW is a 2D/3D/video accelerator chip with a 128-bit core.
IPMI
IPMI (Intelligent Platform Management Interface) is a hardware-level interface speci­ cation that provides remote access, monitoring and administration for Supermicro server platforms. IPMI allows server administrators to view a server’s hardware status remotely, receive an alarm automatically if a failure occurs, and power cycle a system that is non-responsive.
1-2
Chapter 1: Introduction
Other Features
Other onboard features that promote system health include onboard voltage moni­tors, a chassis intrusion header, auto-switching voltage regulators, chassis and CPU overheat sensors, virus protection and BIOS rescue.
Figure 1-1. Intel 7500 Chipset:
System Block Diagram
Note: This is a general block diagram. Please see Chapter 5 for details.
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
SMI 6.4GT/s
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
SLOT#2-PCIE-G2x8
SLOT#3-PCIE-G2x16
SLOT#4-PCIE-G2x8
SLOT#5-PCIE-G2x16
SLOT#6-PCIE-G2x8
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
SMI
6.4GT/s
CHA
CHB
CHC CHD
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
6
I
S
M
PCIE-G2x8
PCIE-G2x8x2
PCIE-G2x4
PCIE-G2x8x2
PCIE-G2x4
VRM11.1
CHA
Nehalem-EX
CHA CHB
SMI
Nehalem-EX
6.4GT/s
CHC CHD
.
T
4
/s
G
PE8/PE7
PE10/PE9/PE8/PE7
PE4
PE6/PE5/PE4/PE3
PE3
iPASS Cable iPASS Cable
QPI 6.4GT/s
LSI2008
USB Port
SATA Port SATA Port
QPI 6.4GT/s
QP
I
6 6
QPI
QPI 6.4GT/s
XDP1: CPU1 & CPU2 XDP2: CPU3 & CPU4
USB Port USB Port
SATA Port SATA Port
GT
.
4
4
.
GT
PCIE-G2x4
USB Port USB Port
SATA Port SATA Port
/s
/
s
Nehalem-EX
SPI
USB
2.0
SATA
Nehalem-EX
QPI 6.4GT/s
CHA CHB CHC
CHD
QPI 6.4GT/s
W83527HG
CHB
CHC
SMI 6.4GT/s
CHD
SMI 6.4GT/s
DDR3-DIMM DDR3-DIMM
SMI 6.4GT/s
QPI 6.4GT/s
Power Management
Reset & PowerGood
Clock Subsystem Clock Gen Clock Buffer
CLINK
PCIEx4-ESI
PCI
USB 1.0
USB 2.0
PC
L
Reset & PowerGood GPIO, Misc
LPC
SMBus
SIO
For 4U System 748 Chassis FAN Location Front Side: 3 (9238) Rear Side: 3 (8038)
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
800/1066 800/1066
CPLD
PCIe Gen1 x4
t
n
o
C
l
o
r
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
M
S
G
I
.4
6
T/
WPCM450RA0BX
Serial
Port
FAN Control
s
SPI
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
Power Supply
1400W x2 for 4U
SMBus
HM
W83795G
RMII
D
D
SPI
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
DDR3-DIMM
800/1066
KAWELA Dual GbE
RMII PHY
Analog Video
R2
RTL8201N
Gbit LAN
Gbit LAN
10/100
LAN
1-3
SUPERSERVER 8016B-TLF User's Manual
1-3 Server Chassis Features
The following is a general outline of the main features of the SC818A-1400B server chassis.
System Power
The SC818A-1400B features a 1400W high-effi ciency power supply with I2C. Power must be removed from the system before servicing or replacing the power supply.
SATA Subsystem
The SC818A-1400B chass is was designed to s upport th ree SATA drives, w hich are hot- swappa ble unit s.
Front Control Panel
The control panel on the SuperServer 8016B-TLF provides you with system monitor­ing and control. LEDs indicate system power, HDD activity, network activity, system overheat and power supply failure. A main power button and a system reset button are also included. In addition, two USB ports and a COM port have been incorpo­rated into the front of the chassis for convenient access.
Cooling System
The SC818A-1400B chassis has an innovative cooling design that includes seven 4-cm fans located in the middle section of the chassis. The power supply module also includes a cooling fan. All chassis and power supply fans operate continu­ously. An air shroud channels the airfl ow from the system fans to effi ciently cool the processors and memory.
1-4
Chapter 1: Introduction
1-4 Contacting Supermicro
Headquarters
Address: Super Micro Computer, Inc.
980 Rock Ave. San Jose, CA 95131 U.S.A.
Tel: +1 (408) 503-8000
Fax: +1 (408) 503-8008
Email: marketing@supermicro.com (General Information)
support@supermicro.com (Technical Support)
Web Site: www.supermicro.com
Europe
Address: Super Micro Computer B.V.
Het Sterrenbeeld 28, 5215 ML 's-Hertogenbosch, The Netherlands
Tel: +31 (0) 73-6400390
Fax: +31 (0) 73-6416525
Email: sales@supermicro.nl (General Information)
support@supermicro.nl (Technical Support) rma@supermicro.nl (Customer Support)
Asia-Pacifi c
Address: Super Micro, Taiwan
4F, No. 232-1, Liancheng Rd. Chung-Ho 235, Taipei County Taiwan, R.O.C.
Tel: +886-(2) 8226-3990
Fax: +886-(2) 8226-3991
Web Site: www.supermicro.com.tw
Technical Support:
Email: support@supermicro.com.tw
Tel: 886-2-8226-5990
1-5
SUPERSERVER 8016B-TLF User's Manual
1-6
Chapter 2: Server Installation
Chapter 2
Server Installation
2-1 Overview
This chapter provides a quick setup checklist to get your 8016B-TLF up and running. Following these steps in the order given should enable you to have the system operational within a minimum amount of time. This quick setup assumes that your system has come to you with the processors and memory preinstalled. If your system is not already fully integrated with a serverboard, processors, system memory etc., please turn to the chapter or section noted in each step for details on installing specifi c components.
2-2 Unpacking the System
You should inspect the box the 8016B-TLF was shipped in and note if it was dam­aged in any way. If the server itself shows damage you should fi le a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack unit that will hold the 8016B-TLF. It should be situated in a clean, dust-free area that is well ventilated. Avoid areas where heat, electrical noise and electromagnetic fi elds are generated. You will also need it placed near a grounded power outlet. Be sure to read the Rack and Server Precautions in the next section.
2-3 Preparing for Setup
The box the 8016B-TLF was shipped in should include two sets of rail assemblies, two rail mounting brackets and the mounting screws you will need to install the system into the rack. Follow the steps in the order given to complete the installation process in a minimum amount of time. Please read this section in its entirety before you begin the installation procedure outlined in the sections that follow.
2-1
SUPERSERVER 8016B-TLF User's Manual
!
!
Choosing a Setup Location
Leave enough clearance in front of the rack to enable you to open the front door completely (~25 inches) and approximately 30 inches of clearance in the back of the rack to allow for suffi cient airfl ow and ease in servicing.
This product is for installation only in a Restricted Access Location (dedicated equipment rooms, service closets and the like).
This product is not suitable for use with visual display work place devices
acccording to §2 of the the German Ordinance for Work with Visual Display Units.
Warnings and Precautions!
Rack Precautions
Ensure that the leveling jacks on the bottom of the rack are fully extended to the fl oor with the full weight of the rack resting on them.
In single rack installation, stabilizers should be attached to the rack. In multiple
rack installations, the racks should be coupled together.
Always make sure the rack is stable before extending a component from the
rack.
You should extend only one component at a time - extending two or more si-
multaneously may cause the rack to become unstable.
Server Precautions
Review the electrical and general safety precautions in Chapter 4.
Determine the placement of each component in the rack before you install the rails.
Install the heaviest server components on the bottom of the rack fi rst, and then
work up.
Use a regulating uninterruptible power supply (UPS) to protect the server from
power surges, voltage spikes and to keep your system operating in case of a power failure.
2-2
Chapter 2: Server Installation
Allow the hot plug SATA drives and power supply modules to cool before touch- ing them.
Always keep the rack's front door and all panels and components on the servers
closed when not servicing to maintain proper cooling.
Rack Mounting Considerations
Ambient Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient operating tempera­ture of the rack environment may be greater than the ambient temperature of the room. Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient tempera­ture (Tmra).
Reduced Airfl ow
Equipment should be mounted into a rack so that the amount of airfl ow required for safe operation is not compromised.
Mechanical Loading
Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading.
Circuit Overloading
Consideration should be given to the connection of the equipment to the power supply circuitry and the effect that any possible overloading of circuits might have on overcurrent protection and power supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself should be grounded. Particular attention should be given to power supply connec­tions other than the direct connections to the branch circuit (i.e. the use of power strips, etc.).
2-3
SUPERSERVER 8016B-TLF User's Manual
2-4 Installing the System into a Rack
This section provides information on installing the 8016B-TLF into a rack unit with the rack rails provided. If the system has already been mounted into a rack, you can skip ahead to Sections 2-5 and 2-6. There are a variety of rack units on the market, which may mean the assembly procedure will differ slightly. You should also refer to
the installation instructions that came with the rack unit you are using.
Identifying the Sections of the Rack Rails
You should have received two rack rail assemblies in the rack mounting kit. Each assembly consists of two sections: an inner fi xed chassis rail that secures directly to the server chassis and an outer fi xed rack rail that secures directly to the rack itself (see Figure 2-1). Two pairs of short brackets to be used on the front side of the outer rails are also included.
Installing the Inner Rails
Both the left and right side inner rails have been pre-attached to the chassis. Pro­ceed to the next step.
Figure 2-1. Identifying the Sections of the Rack Rails
(right side rail shown)
2-4
Chapter 2: Server Installation
Installing the Outer Rails
Begin by measuring the distance from the front rail to the rear rail of the rack. Attach a short bracket to the front side of the right outer rail and a long bracket to the rear side of the right outer rail. Adjust both the short and long brackets to the proper distance so that the rail can fi t snugly into the rack. Secure the short bracket to the front side of the outer rail with two M4 screws and the long bracket to the rear side of the outer rail with three M4 screws. Repeat these steps for the left outer rail. See Figure 2-2.
Locking Tabs
Both chassis rails have a locking tab, which serves two functions. The fi rst is to lock the server into place when installed and pushed fully into the rack, which is its normal position. Secondly, these tabs also lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when you pull it out for servicing.
Figure 2-2. Installing the Rack Rails
2-5
SUPERSERVER 8016B-TLF User's Manual
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit. The next step is to install the server into the rack. Do this by lining up the rear of the chassis rails with the front of the rack rails. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you may have to depress the locking tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should hear the locking tabs "click". Finish by inserting and tightening the thumbscrews that hold the front of the server to the rack.
Figure 2-3. Installing the Server into a Rack
2-6
Chapter 2: Server Installation
2-5 Checking the Serverboard Setup
After you install the 8016B-TLF in the rack, you will need to open the top cover to make sure the serverboard is properly installed and all the connections have been made.
Accessing the inside of the System (see Figure 2-4)
First, release the retention screws that secure the system to the rack.1.
Grasp the two handles on either side and pull the system straight out until it 2. locks (you will hear a "click").
Next, release the thumbscrew at the middle rear of the top cover. Then de-3. press the two buttons on the top of the chassis to release the top cover.
Push the cover away from you (toward the rear of the chassis) until it stops. 4. You can then lift the top cover from the chassis to gain full access to the inside of the server.
To remove the system from the rack completely, depress the locking tabs in 5. the chassis rails (push the right-side tab down and the left-side tab up) to continue to pull the system out past the locked position.
Checking the Components and Setup
You may up to four processors already installed in the serverboard. Each 1. processor needs its own heatsink. See Chapter 5 for instructions on proces­sor and heatsink installation.
Your server system may have come with system memory already installed. 2. Make sure all DIMMs are fully seated in their slots. For details on adding system memory, refer to Chapter 5.
If desired, you can install an add-on card to the system. See Chapter 5 for 3. details on installing PCI-E add-on cards.
Make sure all power and data cables are properly connected and not blocking 4. the chassis airfl ow. See Chapter 5 for details on cable connections.
2-7
SUPERSERVER 8016B-TLF User's Manual
Figure 2-4. Accessing the Inside of the System
2-8
Chapter 2: Server Installation
2-6 Preparing to Power On
Next, you should check to make sure the peripheral drives and the SA TA drives and backplane have been properly installed and all connections have been made.
Checking the Drives
All drives are accessable from the front of the server. For servicing the DVD-1. ROM and fl oppy drives, you will need to remove the top chassis cover. The SATA disk drives can be installed and removed from the front of the chassis without removing the top chassis cover.
A slim DVD-ROM and fl oppy drive should be preinstalled in your server. Refer 2. to Chapter 6 if you need to reinstall a DVD-ROM and/or fl oppy disk drive to the system.
Depending upon your system's confi guration, your system may have one or 3. more drives already installed. If you need to install SATA drives, please refer to Chapter 6.
Checking the Airfl ow
Airfl ow is provided by seven sets of 4-cm fans (each set of fans consists 1. of two fans that are mounted back to back) and an air shroud. The system component layout was carefully designed to direct suffi cient cooling air fl ow to the components that generate the most heat.
Note that all power and data cables have been routed in such a way that they 2. do not block the airfl ow generated by the fans.
Providing Power
Plug the power cords from the power supplies unit into a high-quality power 1. strip that offers protection from electrical noise and power surges.
It is recommended that you use an uninterruptible power supply (UPS).2.
Finally, press the power on button on the front of the chassis.3.
2-9
SUPERSERVER 8016B-TLF User's Manual
Notes
2-10
Chapter 3: System Interface
Chapter 3
System Interface
3-1 Overview
There are several LEDs on the control panel as well as others on the drive car­riers to keep you constantly informed of the overall status of the system as well as the activity and health of specifi c components. There are also two buttons on the chassis control panel and an on/off switch on the power supply. This chapter explains the meanings of all LED indicators and the appropriate response you may need to take.
3-2 Control Panel Buttons
There are two push-buttons located on the front of the chassis: a reset button and a power on/off button.
Reset
Use the reset button to reboot the system.
Power
The main power button is used to apply or remove power from the power supply to the server system. Turning off system power with this button removes the main power but keeps standby power supplied to the system.
3-1
SUPERSERVER 8016B-TLF User's Manual
3-3 Control Panel LEDs
The control panel located on the front of the SC818A-1400B chassis has fi ve LEDs. These LEDs provide you with critical information related to different parts of the system. This section explains what each LED indicates when illuminated and any corrective action you may need to take.
Overheat/Fan Fail
When this LED ashes it indicates a fan failure. When on continuously (on and not ashing) it indicates an overheat condition, which may be caused by cables ob-
structing the airfl ow in the system or the ambient room temperature being too warm. Check the routing of the cables and make sure all fans are present and operating normally. You should also check to make sure that the chassis covers are installed. Finally, verify that the heatsinks are installed properly (see Chapter 5). This LED will remain fl ashing or on as long as the overheat condition exists.
2
NIC2
Indicates network activity on GLAN2 when fl ashing .
1
NIC1
Indicates network activity on GLAN1 when fl ashing .
HDD
On the 8 016B-TLF this light i ndi c ate s SATA and/or DVD- RO M d r ive ac t iv ity when ashing.
3-2
Chapter 3: System Interface
Power
Indic ates power is bein g supplied to the sy stem's power supply u nits. This LED should normally be illuminated when the system is operating.
3-4 Drive Carrier LEDs
Green: E ach drive c a rrier h a s a gr e e n L ED. Wh e n i l lu m in ated, this gre e n L ED
(on the front o f the drive ca rrier) indic ates drive ac tivity. A conne ction to th e backp lane enables th is LED to blink on and of f when that par ticular d rive is being ac cessed. Please refer to Chapter 6 for instructions on replacing failed drives.
Red:
The red LED to indicate a drive failure. If one of the drives fail, you should
be notifi ed by your system management software. Please refer to Chapter 6 for instructions on replacing failed drives.
3-3
SUPERSERVER 8016B-TLF User's Manual
Notes
3-4
Chapter 4: System Safety
!
Chapter 4
System Safety
4-1 Electrical Safety Precautions
Basic electrical safety precautions should be followed to protect yourself from harm and the SuperServer 8016B-TLF from damage:
Be aware of the locations of the power on/off switch on the chassis as well
as the room's emergency power-off switch, disconnection switch or electrical outlet. If an electrical accident occurs, you can then quickly remove power from the system.
Do not work alone when working with high voltage components.
Power should always be disconnected from the system when removing or in- stalling main system components, such as the serverboard, memory modules and fl oppy drive. When disconnecting power, you should fi rst power down the system with the operating system fi rst and then unplug the power cords of all the power supply units in the system.
When working around exposed electrical circuits, another person who is familiar
with the power-off controls should be nearby to switch off the power if neces­sary.
Use only one hand when working with powered-on electrical equipment. This
is to avoid making a complete circuit, which will cause electrical shock. Use extreme caution when using metal tools, which can easily damage any electrical components or circuit boards they come into contact with.
Do not use mats designed to decrease static electrical discharge as protection
from electrical shock. Instead, use rubber mats that have been specifi cally designed as electrical insulators.
The power supply power cords must include a grounding plug and must be
plugged into grounded electrical outlets.
4-1
SUPERSERVER 8016B-TLF User's Manual
!
Serverboard Battery: CAUTION - There is a danger of explosion if the onboard battery is installed upside down, which will reverse its polarites (see Figure 4-1). This battery must be replaced only with the same or an equivalent type recom­mended by the manufacturer (CR2032). Dispose of used batteries according to the manufacturer's instructions.
DVD-ROM Laser:
CAUTION - this server may have come equipped with a
DVD-ROM drive. To prevent direct exposure to the laser beam and hazardous radiation exposure, do not open the enclosure or use the unit in any uncon­ventional way.
Mainboard replaceable soldered-in fuses: Self-resetting PTC (Positive Tempera-
ture Coeffi cient) fuses on the mainboard must be replaced by trained service technicians only. The new fuse must be the same or equivalent as the one replaced. Contact technical support for details and support.
4-2 General Safety Precautions
Follow these rules to ensure general safety:
Keep the area around the SuperServer 8016B-TLF clean and free of clutter.
The 8016B-TLF weighs approximately 43 lbs. (19.5 kg) when fully loaded. When lifting the system, two people at either end should lift slowly with their feet spread out to distribute the weight. Always keep your back straight and lift with your legs.
Place the chassis top cover and any system components that have been re-
moved away from the system or on a table so that they won't accidentally be stepped on.
While working on the system, do not wear loose clothing such as neckties and
unbuttoned shirt sleeves, which can come into contact with electrical circuits or be pulled into a cooling fan.
Remove any jewelry or metal objects from your body, which are excellent metal
conductors that can create short circuits and harm you if they come into contact with printed circuit boards or areas where power is present.
4-2
Loading...
+ 78 hidden pages