
KH
L32
Chain Cutter-Installation
Preparation
1. Removing the existing parts
Remove the needle plate,
plate.
2. Interchanging existing parts
(Replacement:
•
If
the
special
be
used,
•
If
the
existing cloth
refer
to
Fig.
Installing the
Fit
the
parts
replacement
refer
16.
Chain
in
the
Table
to
Installation Hints
• When pin 0 is fitted,
as
be aligned
•
Prior
oil
parts.
•
The
adjusted
fitting
the
clearance
well
and
Note too,
be installed
surface
surface
•
To
the
overlap
adjustment,
upper
screw
it is
•
Rotate'
and
they
to
the
oil wick
position of
the
chain
as
needle plate should be 0.4mm
adjust
clothguide plate 0 again.
knife
0 and move
correctly
lower
cut
the
of
is 0.3mm
the
shown
the installation of
and
by loosening
needle plate
cutter
that
is 0.5mm higher
the
is
around
clearance
the
in
such a way
the
needle
the
overlap
(See
rotate
to
its
highest
adjusted.
pulley
blades engage smoothly
thread
Table 4
Special
cloth
plates
fabric
4;
Modification Fig.16)
cloth
Table
plate
4.
is to be modified,
Cutter (Fig. 17)
sequence 1 to
the
driver
in
Fig.
17.
the
pipe
as
well
the
chain
in
the
the
cloth
between
Cloth
the pulley
the
and
cleanly.
for
cutter
the
screw
and
cloth plate. When
correct
plate
plate
than
plate
of
Fig.
KH device.
(See
the
20).
position.
lower
check
guard
guide 0 should
that
blades, remove
that
and
cloth
plate
slot
chain
as
the
position the
guide 0
the
(See
the
The
To
and
Then
blade G until
is to
6.
should
cutter,
moving
should be
0
after
cloth pia
Fig.18).
its
upper
upper
Fig.
19).
correct
make this
move
the
loosen
and
the
upper
that
as
te
Fig.16
Fig.17
Fig.18
0.4mm
Fig.19
0
I
Machine
Model No. Needle Plate
L
32
Model
2N-3W
Cloth Plate
Part No.
303758
Remarks
Fig.l6
Fig.20

KH
E32
Chai
Cutter-Installation
n
''
.'
I'
~·
'
Preparation
1.
Removing the existing parts
the
ne
Remove
plate.
2. lnterchangi
(Replacem
•
If
the
speci
be used,
appropriate
•
If
the
refer
• Modify
as
shown (
Table 5
Special
Machine M
Model
No.
E32
E32
existi
to
Fi
the
cloth
Ne
r:
edle plate,
ng
existing parts
ent: Table
replacement
al
efer
to
part.
ng cloth
g.
21.
needle
Fig.
21)
plates
ode I Cloth Plate
edle
Plate
2N
2W
3N
3W
fabric
5;
Modification: Fig.21)
Table 5 and
plate
plate
fitted
for
KH device.
cloth
is
Part
301243
301241
guard
to
No.
and
plate
select
be modified,
to
the
cloth
is to
the
machine
Remarks
Fig.21-l
Fig.21-2
_3_0.
6_...
-7
Prr
Ll'l i !
I
21-1
Ll'l
,.;
Fig.21
~
21-2
r

Installing the Chain Cutter (Fig. 22, 23)
Fit
the
parts
lns1allation Hints
•
When
that
it
•
Prior
oil the
parts.
•
The
position
adjusted
cloth
plate
chain
clearance
well
and
Note
be
surface
surface
•
To
the
adjustment
this
the
loosen
4f)
•
Rotate
and
they
•
Use
machine
cutter
as
needle
too,
installed
adjust
cloth
adjustment,
upper
until it is
lower
cut
the existing
in
the
sequence
pin 0 is fitted,
locates
to the installation
oil
the
of
screw
the
to
in
the
wick
and
of
the
after
that
is 0.5mm
the
fitting the needle
by loosening
is
in
around
clearance
plate
the J1eedle
the
plate
is 0.3mm
knife to
blades
fasten
the
should be 0.4mm
the
in
such a way
overlap
guide 0 again.
rotate
4D
and
correctly
pulley
thread
center
pipe
chain
the
cloth
between
cloth
higher
plate
of
(See
its
highest
move
and
engage
cleanly.
screw
the
auxiliary
1 to 8.
fasten
of
as
screw
correct
plate
the
the
adjusted.
check
4D
screw
of the long hole.
the
chain
well
as
cutter
0.
position, the
plate
guide 0
the
(See
guide 0 should
that
than
(See
blades,
The
Fig.
26).
pulley
position.
the
lower
that
smoothly
attached
plate
8
cutter
the
moving
should be
plate
When
cloth
its
the
Fig.
and
the
plate
Fig.24).
upper
upper
25).
remove
correct
To
make
move
Then
blade
upper
and
that
to the
41).
and
so
the
as
0.
4mm
+
i
Fig.22
Fig.23
Fig.24
Fig.26
~'
\
--
:::;;;_)-'
~
--~
~
I
;
Fig.25
•
Fig.27

Installing
the
Venturi
Device
Location (Figs.
Attach
depending on the machine type.
31).
Fit
the
parts
device to
Connecting the
1. Connecting
After
locate
device
2.
When using a chain
connect
with
3.
Attach
The
to
The
the
connecting the joint 0
the
tube 8 on
and
then tighten
Connecting the air blower tube 0
the
air
the
tube 0
Connecting
the
two
suction
the
air
waste
•
After
connected,
to
the
tube
chain
tube
receptacle.
all of the pipes
foot pedal by
in
the
blower
and
the
tubes
4D
cutter.
4D
connects
the
lever
30,
31 )
the
machine
sequence
Air
air
the
cutter
loosen
tubes
connects
1 to 4.
Pipes
supply
joint
nut 0 securely.
with
41)
to
4D
as
shown
the
have
I)
should be
the
Chain
(See
(Fig.
tube 8
to
the
C)
of the
an
the
Venturi
the
and
in
the
Venturi
Venturi
been
rest
board
Figs.
32)
compressor,
Venturi
air
blower,
device
screw
48.
4D
Fig.
32.
deVice
device to
correctly
connected
48.
30,
Adjustment
i ) Open
air
ii)
Loosen
hand wheel
kg/cm
iii)
Adjust
the
operate
The
when
the
supply
2
•
the
chain
machine should only
the
compressor
so
that
nut
41)
and
Cl
so
length of
cutter
when
the
pedal is
Fig.30
valve
it
is
less
turn
the
pressure
the
suction
pedal is
pressed
and
than
the
air
chain
just
pressed
start
harder.
adjust
10kg/cm
regulator
is
3-3.5
48
so
starts
lightly.
to
operate
Fig.31
the
2
that
to
•
r
eR57
· R53
Fig.32
I.
1'
to com pressor '
t=Jt
•