Summit SP6DS2D7ADA, SP6DS2D7 Instruction Manual

Handle
Directions for Applying Overlay Panel
Materials Supplied: 1 - Drill Bit 3/16"
Gasket
4 - Screws M4 x 25 Flat Hd Phillips (For Handle) 8 - Screws #10 x 2.25" Phillips
Step 1
1) Remove both drawers from unit by opening drawers and pushing in black tabs on either side of the slides. You must hold in tabs to disengage slide.
2) Peel back gasket (Fig A) and remove 2 screws to remove handle.
3) Throw out the 2 screws that attach the handle.
2 3/4
11/16
2 3/4
1) Drill the bottom 2 holes shown in the drawing using the supplied drill bit on the drawer front.
2) Cut overlay panels as follows: Top (outdoor unit): 23-7/16 x 16-5/16 Top (indoor unit): 23-7/16 x 15-11/16 Bottom (outdoor unit): 23-7/16 x 13-3/16 Bottom (indoor unit): 23-7-16 x 12-9/16
Step 2
1 of 2 Q119
04/17
01/
19 3/8
M4 x 25 Flat Head 2 Places
Overlay Panel
1 1/4
#10 x 1.75" 2 Top
Step 3
1) If reusing the handle that came with the unit, drill two holes 19 3/8" apart and a minimum of 1 1/4" from the top.
2) Screw handle on using the supplied screws. Drive screws flush with panel. Screws are designed for 3/4" overlay panel. If thickness other than this is used, customer will supply.
#10 x 1.75" 2 Bottom
Step 4
1) Peel back the gasket and attach the overlay panel to the drawer face using the 4 supplied screws and thru the 4 existing clearance holes.
2) Install both drawers back into unit.
2 of 2 Q119 01/04/17
Loading...