The Sub-Zero & Wolf Kitchen Design Contest
2002/2003
Official Entry Form
ALL ENTRIES MUST BE SUBMITTED TO: Sub-Zero/Wolf 2002/ 03 Kitchen Design Contest
4717 Hammersley Road, Madison, WI 53711
Entries must be received no later than January 16, 2004.
WHITE - SUB-ZERO/ WOLF COPY YELLOW - DISTRIBUTOR COPY PINK - CONTESTANT COPY
All entries must be accompanied by this form, filled
in entirely with all requested information. Incomplete
entry forms will be disqualified. All entries must be
received by January 16, 2004 to be eligible.
(PLEASE PRINT)
INCLUDE WITH ENTRY FORM:
• Floor plan and elevation or perspective
drawings in 8
1
/2 "x 11" format and minimum of
two color photographs (5"x 7" or 8"x 10") of
complete kitchen.
• Narrative statement of no more than 200 words
describing how Sub-Zero and Wolf products
benefitted the kitchen design, as outlined in the
official contest rules. Include any unusual client
needs or requirements.
By signing below, contestant agrees to all rules and
provisions as outlined in the Sub-Zero/Wolf 2002/ 03
Kitchen Design Contest official contest rules.
Signature: __________________________________________
Date: _______________________________________________
CONTESTANT INFORMATION:
Name: ______________________________________________
Company Name: ____________________________________
____________________________________________________
Address: __________________________________________
____________________________________________________
City: ________________________________________________
State/ Zip: __________________________________________
Phone:
(WORK) ______________________________________
Phone:
(HOME) ______________________________________
Fax: ________________________________________________
E-mail: ____________________________________________
Profession: ________________________________________
CONTEST CATEGORIES: (CHECK ONE)
Best kitchen using both Sub-Zero and Wolf
Best showroom using both Sub-Zero and Wolf
Best use of 400 Series outside of kitchen
Best use of Sub-Zero and/or Wolf outside
of kitchen
International category
PROJECT INFORMATION:
Project start date: __________________________________
Completion date: __________________________________
Project is:
(CHECK ONE)
New Construction Remodeling
Sub-Zero and/ or Wolf unit(s) used in this project:
MODEL NUMBERS AND SERIAL NUMBERS (IF POSSIBLE)
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________
____________________________________________________