INSTALLATION
Fitting Cast front panel (8901 / 8902 / 8903)
Ensure that the oor of the replace opening is level with
the projecting hearth surface. If a cement inll is required to
achieve this, do not proceed with the installation until the
cement is completely dry.
Cover the surface of the hearth to protect it from damage
during installation of the cast panel.
Protect the surfaces of the surround (mantelpiece) from damage
when trial tting of the panel.
Position the front panel centrally in the replace opening
against the wall. Place the surround (mantelpiece) in position
and, holding it rmly against the wall, pull the front panel
forward until it touches the rear of the surround. The panel is
now in the correct position and should be xed. The surround
can be removed while this is completed.
There are a number of ways of xing the front panel, but a
typical method is:-
Drill through the 4 corners of the main panel in a position that
will be covered when the surround is in position. Drill holes in
the wall in corresponding position, and secure the front panel
with 75mm (3”) screws and non-plastic wall plugs. Fill any
gaps between the wall and the panel with a non-combustible
material, such as breglass rope seal or Stovax re cement, to
form airtight seal.
Safety
As with all replaces the surfaces will become very hot when
in use, therefore due care should be taken when near the
replace. If it is to be used in the presence of young children,
elderly or inrm persons a suitable reguard should be used.
Care should also be taken with the placement of combustible
items near the replace as conducted and radiated heat could
cause a re hazard.
Stovax offer a wide range of rescreens and sparkguards, along
with a hearthgate system designed to offer full protection for a
range of stoves and replaces. Your Stovax dealer can advise
you on these products.
If a chimney re occurs evacuate all persons from the building
before calling the re brigade. Do not re-enter the building
until it is conrmed safe to do so.
Following a chimney re do not use the replace until it is
inspected, by a HETAS (GB only) registered installer, to conrm
that the appliance is safe to use, or make any repairs required
before re-use. Only genuine Stovax replacement parts are to be
used to keep your replace in safe and efcient working order.
After any chimney re it is recommended that the chimney
system be inspected and swept by a NACS registered (UK only)
chimney sweep, to conrm that the system is structurally sound
and free from any obstructions before re-use.
MAINTENANCE
Never use strong Portland cement mortar in chimneys and
replaces. A lime based mortar will allow expansion and
movement and reduce the risk of cracking.
Wait until any cement or seals are dry before tting a wooden
surround. If the surround is wood, x Stovax at rope seal (Part
No. 4953) to all surfaces that touch the cast iron panel. Place it
into position ensuring that it is central, and secure it to the wall
using at brass brackets (mirror plates).
With Solid fuel res use only at a low re for the rst few hours
of use to allow the castings to temper.
During this time the replace may give off some unpleasant
odours, and we recommend that you keep the room well
ventilated to avoid a build-up of fumes.
For fully polished replaces Stovax Steel Cleaner (Part No.
2037) is recommended to keep them clean and rust free. If
a re is not to be lit for an extended period, it is advisable
to coat with a light oil to prevent moisture in the air causing
surface rust and pitting of the cast iron. This is important when
plastering or other decorating work is being done.
E & OE.
Cast Iron
London Fronts
Models: 8901, 8902, 8903, 8904
Installation Instructions
This product is suitable for use in the stated countries. To install the product in other countries it is essential to obtain translated instructions
and in some cases the product may require modification. Contact Stovax to obtain further information.
Stovax Ltd, Falcon Road, Sowton Industrial Estate, Exeter, Devon, England EX2 7LF
Tel: (01392) 474011 Fax: (01392) 219932 E-mail: info@stovax.com www.stovax.com
IMPORTANT
Please read these instructions carefully before using the appliance.
Keep them safe for future reference and when servicing the stove.
PM190-Issue 1 (October 2006)
INSTALLER / SUPPLIER DETAILS
SITE REQUIREMENTS / INSTALLATION
To assist us in any Guarantee claim please complete the following information: -
Stovax dealer the appliance was purchased from
Name: ...........................................................................................................................................................................................
Address: ........................................................................................................................................................................................
.....................................................................................................................................................................................................
Telephone number:.......................................................................................................................................................................
Date installed: ...............................................................................................................................................................................
Model description: ........................................................................................................................................................................
Installation Engineer
Name: ...........................................................................................................................................................................................
Address: ........................................................................................................................................................................................
Hearth
The constructional and superimposed hearth must meet the
requirements of the Building Regulations for the re and
surround to be tted.
Flue
The ue system should meet the requirements of the Building
Regulations for the re to be tted and the fuel to be used.
The ue exit from the building should be positioned to comply
with the requirements of the Building Regulations.
Any existing ue should be conrmed as suitable for the new
intended use, as dened in the Building Regulations.
Any existing ue or chimney system must be inspected and
swept by a NACS registered (UK only) chimney sweep, to
conrm that the system is structurally sound and free from any
obstructions.
Suitable access should be provided to enable the collection and
removal of debris.
Provision should be made to sweep and inspect the ue when
the appliance is installed.
Additional ventilation
If the replace is to be used with Solid fuel, Gas, or Oil products
additional ventilation will be required. This should meet the
requirements of the Building Regulations for the re to be
tted and the fuel to be used. This should be provided using a
permanently open air vent, which is positioned so that it is not
liable to be blocked both inside and outside the building.
If any of these checks reveal problems do not proceed with
the tting of the replace until they have been rectied.
Dimensions
.....................................................................................................................................................................................................
Telephone number:.......................................................................................................................................................................
GENERAL
Before installation of this product please read these instructions fully.
It is very important to also understand the requirements of the UK Building Regulations (England and Wales – Document J /
Scotland - Part F), along with any local regulations, and working practices that may apply. Should any conict occur between these
instructions and these regulations then the regulations shall apply.
All electrical connections should meet the requirements of UK Building Regulations
(England and Wales – Document P / Scotland - Part N).
Your local Building Control Ofce would be happy to advise should questions arise, regarding the requirements of the regulations.
The replace should be tted by a HETAS (GB only) registered installer, or approved by your local building control ofcer. Your
Stovax dealer should be able to arrange this service for you.
Any gas appliance installation completed in conjunction with the replace must be completed by a CORGI registered gas
engineer, in accordance with the manufactures installation instructions. Your Stovax dealer should be able to arrange this service
for you.
No other heating appliances should be connected to, or share,
the same ue or chimney system.
Check the ue draught. This should be done with all windows
and doors closed and any extraction fans in this or adjoining
rooms running at maximum speed.
Note: A guide containing general information on Chimneys and
Flues is obtainable from: -
The British Flue & Chimney Manufacturers’ Association,
FETA
2 Waltham Court, Milley Lane,
Hare Hatch
Reading,
Bucks ,
RG10 9TH
Tel : - 01189 403416 e-mail :- info@feta.co.uk
Where a hearth, replace, ue or chimney is provided or
extended (including cases where a ue is provided as part
of refurbishment work), information essential to the correct
appliance and use of these should be permanently posted
in the building, to meet Requirement J4 of the Building
Regulations (England and Wales), F3.12 (Scotland).
Fitting optional insert panel (8904)
The insert panel is tted to the back of the main front panel
using the 4 xing screws supplied. This will then allow tting of
both Stovax and Gazco 16” products.
Your building insurance company may also require you to inform them that you have installed a new heating appliance, so check
with your insurers that your cover is still valid after installing the replace.
When completing the installation and building works you should comply with your responsibilities under the Health and Safety at
Work Acts, and any new regulations, which may be introduced during the lifetime of these instructions.
A faulty installation could cause danger to the inhabitants and structure of the building.
2
Fireplace opening
As all replaces are different it is not possible to give full details
of the construction of the replace opening. But this should be
constructed using ‘best practice’ construction methods using
suitable non-combustible materials.
3