STIEBEL ELTRON SBP 200 E, SBP 700 E, SBP 700 E SOL Operating And Installation Instructions

267730
SBP 200 E, SBP 700 E, SBP 700 E SOL with WPKI 3
English
SBP 200 E, SBP 700 E, SBP 700 E SOL with WPKI 3
Operating and installation instructions
SBP 200 E / WPKI 3
8960.01
1. Operating instructions 3
1.1 Cylinder description 3
1.2 Special accessories 3
1.3 Essential special accessories
1.4 Operating and installation instructions 3
2. Installation instructions 3
2.1 Cylinder construction 3
2.2 Regulations 3
2.3 Place of installation 3
2.4 Cylinder casing assembly/removal 3
2.5 Immersion heater installation 5
2.6 WPKl 3 installation 5
2.7 Commissioning 5
2.8 Maintenance 5
2
7
6
5
8961.01
SBP 200 E
18 17
8963.02
8962.01
1
2
9
8
3
4
10
Dimensions in mm
305 140 1110
140
510
770
305
600
175 175
1890
1
2
10
8
14
10
11
11
7
6
5 4
Dimensions in mm
SBP 700 E / SBP 700 E SOL
10
9
13
12
16
15
15
A
B
8962.02
8964.01
C
D
3
2. Installation instructions for contractors
1. Instructions for users and contractors
English
Type SBP 200 E SBP 700 E SBP 700 E SOL
Weight empty:
64 kg 145 kg 176 kg
Weight full
264 kg 845 kg 876 kg Height of unit when tilted: 1650 mm 2000 mm 2000 mm Permissible operating pressure 0,3 MPa (3 bar) 0,3 MPa (3 bar)
SBP 200 E Part no: 18 54 58 SBP 700 E Part no: 18 54 59 SBP 700 E SOL Part no: 18 54 60
1.1 Cylinder description
The sealed freestanding cylinder (with a volu­me of 200 or 700 litres) acts as buffer cylinder for heat pumps. A buffer cylinder is recommended to ensure trouble-free heat pump operation. It acts as a bridge during electricity supply shutdown periods and as separator between the volume flow in the heat pump and that in heating circuits.
Features of the SBP 700 E SOL
The cylinder SBP 700 E SOL is also fitted with a heat exchanger for boosting the DHW with solar energy.
1.2 Special accessories
WPKI 3 Part no: 07 37 38
The compact installation heat pump set WPKl 3 is designed especially for use with buf
­fer cylinders SBP 200 E and SBP 700 E (SOL). Clear and simple connection of buffer cylinder SBP to heat pumps WPWE and WPL.
WPKI 4 Part no: 07 44 37
The compact heat pump set WPKl 4 is desi­gned especially for use with buffer cylinders SBP 200 E and SBP 700 E (SOL). Clear and simple connection of buffer cylinder SBP to heat pumps WPF.
Inserts Part no: 00 37 11
For close fitting pipe connection of the buffer cylinder without heat pump compact installati­on WPKl 3. This set comprises 4 inserts, 4 gaskets and 4 union nuts G 2”.
Thermally insulated pressure hoses
G 1¼” x 1 m (DN 25) Part no: 07 44 15 G 1¼” x 2 m (DN 25) Part no: 07 44 16 G 1¼” x 5 m (DN 25) Part no: 07 44 17 G 1¼” x 1 m (DN 32) Part no: 07 44 14 G 1¼” x 2 m (DN 32) Part no: 18 20 19 G 1¼” x 5 m (DN 32) Part no: 18 20 20
1.3 Essential special accessories
UP 32-60-180 Part no: 07 06 30 UP 32-80-180 Part no: 07 06 31
For further accessories, see the design docu
-
mentation.
1.4 Operating and installati­on instructions
Observe the operating and installation in­structions of the components for each rele
-
vant system.
Keep these operating instructions
in a safe place and pass them on to any new user, should the equipment change hands. Let your contractor check their content in conjunction before com­mencing any maintenance or repair work
To prevent damage and contamina­tion, we recommend that the cylin
­der casing is removed for transportation and installation (see 2.3). Do not use a barrel clamp!
2.1 Cylinder construction (A, B, E)
1 Ventilation connectors R ¾” 2 PUR foam thermal insulation 3 Steel container 4 G 2” flow connector, heat pump compact
installation 5 G 2” heating flow connector 6 G 2” heating return connector 7 G 2” return connector, heat pump compact
installation 8 G ½” connector with protective pipe for
HP return temperature sensor 9 Type plate (on the protective cover) 10 G 1½” connectors, for electric immersion
heater 11 G ½” connector, sealed with plug 12 G 1” flow connector, HE solar
(only SBP 700 E SOL) 13 G 1” return connector, HE solar
(only SBP 700 E SOL)
14 G ½” connector with protective sleeve for
temperature sensor (only SBP 700 E SOL) 15 G 1½” connector for additional heat source 16 PUR foam body, thermal insulation segment 17 Retaining strap 18 Buckle 19 Plastic casing 20 Plastic lid 21 Plastic plinth cover
2.2 Regulations
Installation and commissioning, as well as
the maintenance of this equipment, must
only be carried out by an authorised
qualified contractor in accordance with
these instructions.
Optimum function and safe operation
can only be assured when using original,
specialised accessories and spare parts
intended for this equipment.
2.3 Place of installation
The installation location should be safe from frost. If the system is not in use at times when frost is likely, drain the cylinder and the whole system connected to it, to prevent damage.
Ensure that the floor at the installation loca­tion is a load bearing surface, which must be level and even. Secure the cylinder feet firmly to the floor to prevent tipping.
Minimum ceiling height:
1.80 m for SBP 200 E and
2.10 m for SBP 700 E.
2.4 Cylinder casing assembly / removal
The cylinder casing is fitted in the delivered condition. It can be removed if necessary.
Removal (E):
1. Removing the plastic lid (
20)
2. Removing the plastic plinth cover (
21)
3. Removing the plastic casing (
19)
Installation in reverse order.
Fit the cylinder casing before instal­lation work begins on the immersi-
on heater.