INSTALLATION INSTRUCTIONS
ASPHALT ROOF FLASHING KIT - 560105
Installing a Flashing Kit
CAUTION: READ ALL INSTRUCTIONS BEFORE
!
INSTALLING KIT. ADDITIONAL ITEMS WILL BE
NEEDED. THIS INCLUDES A TAPE MEASURE, RATCHET,
MARKER, CHALK SNAP LINE, AND A POWER DRILL.
1. Unpack all of the boxed components and familiarize
yourself with the individual parts.
2. Locate the rafters and snap horizontal and vertical lines
to mark the installation position of the fl ashing.
3. Install base piece and screws as shown in the image
below.
4. Insert the fl ashing so the top part is under the next
row of shingles and pushed far enough up slope to prevent
water infi ltration through the vertical joint in the shingles.
Simply the Best
Note: Make sure to drill the mounting screws into the roof
rafter. This is a key element in the durability of the racking
system.
17 West St., W. Hatfi eld, MA 01088
| 800.582.8423 | 413.247.3380 | fax 413.247.3369 | info@stiebel-eltron-usa.com | www.stiebel-eltron-usa.com
5. Place the EPDM Washer over the stud, pushing it down
until it is fl ush with the top of the fl ashing. Place L-Bracket,
and ⅜˝ Stainless Steel Hex Nut over stud as well. Tighten
the nut to fi nish installation of the fl ashing.
Close up of individual parts that are included.
(L-Bracket, Z-Bracket, & SQ-Bracket are included in separate kits,
and are intended for different mounting scenarios)
For any service or warranty related issue, contact
Stiebel Eltron at:
800.582.8423
17 West Street
West Hatfi eld, MA 01088
TOLL FREE 800.582.8423
PHONE 413.247.3380
FAX 413.247.3369
info@stiebel-eltron-usa.com
www.stiebel-eltron-usa.com
Printed on recycled chlorine-free paper with soy-based inks.
Due to our continuous process of engineering and technological
advancement, specifi cations may change without notice.