SOR 2210 General Instructions Manual

Page 1
2210 Side Mounted
catos w
e
esc
or absence of liquid a
t
es, th
Level Switch
General Instructions
The SOR® 2210 Side Mounted Level Switch is a horizontally mounted, float-operated level switch. The 2210 is suitable for plant and OEM applications where open or closed contacts are required to signal presence or absence of liquid at a discrete level.
When the liquid rises, the float extension arm moves a magnet which repels an internal magnet de-actuating a microswitch. When the liquid level falls, the float extension arm moves the magnet in the opposite direction, actuating the microswitch.
The 2210 is recommended for use in clean liquids only.
NOTE: If you suspect that a product is defective, contact the factory or the SOR Representative in your area for a return authorization number (RMA). This product should only be installed by trained and competent personnel.
Table of Contents
Installation ...................................... 2
Design and specifications are subject to change
without notice.
For latest revision, go to
SORInc.com
Single Switch ............................... 3
Multiple Switch ............................. 4
SIL ............................................ 5
Electrical .................................... 5
Maintenance .................................... 6
Troubleshooting ................................ 6
Replacement Parts ............................ 7
Maximum Operating
Pressure Ratings ........................... 7
Form 1428 (05.16) ©SOR Inc.
Registered Quality System to ISO 9001
1/8
Page 2
1" NPT
81
1
S
A
R
G
S
1" SW
118.6
4.67
14685 W 105TH ST LENEXA, KS
913-888-2630
SORINC.COM
MM
LINEAR =
*95.1±6.3
3.75±0.25
*95.1±6.3
3.75±0.25
NOTES:
1
1. ADD MINIMUM CLEARANCE
REQUIRED TO REMOVE HOUSING COVER
2X 1 IN 3000# SW
PROCESS CONNECTION
4 IN SCH 40 EXTERNAL CHAMBER
112.8
4.44
LEFT SIDE VIEW
459.6±14.2
18.10±0.56
10-32 EXTERNAL
GROUND SCREW
176.4±11.1
6.95±0.44
NAMEPLATE
1
112.6
4.43
ELECTRICAL CONNECTION 1 NPTF STD 3/4 NPTF OPT 1/2 NPTF OPT M20 X 1.5 F OPT
Linear = mm/inches
Drawing 0390698
63.5
2.50
FRONT VIEW
Dimensions are for reference
only. Contact the factory for
certified drawings for a
ISO-9001
PRODUCT CERTIFICATION DRAWING
ALL DIMENSIONS ARE ±1/16 IN
UNLESS OTHERWISE SPECIFIED
particular model number.
Installation
External switch chambers must be mounted so that the centerline is within 3º of
horizontal. The conduit connection centerline must be within 3° of vertical and the nameplate at 12 o’clock (facing up - see by rotating the unit 180°.
). Switch actuation cannot be reversed
3.
DR
J
CHE
M
EN
R
Pipe support hangers or stands should be used where necessary.
All isolation valves must be fully open during service, as restricted valves may
cause erroneous level switching.
Single Switch
Chamber
External chamber piping should be short, straight and unrestricted.
Pipe must be of a diameter equal to or greater than the process
connection diameter.
Valves and other equipment between the chamber and process
must be of the same diameter or larger than the process connection diameter to allow adequate liquid flow into the chamber.
Multiple
Switch
Chambers
In addition to the Single Switch installation instructions, multiple chamber
installations have the following requirements:
Headers connecting multiple chambers to the process must be larger
than the chamber process connection diameter to allow adequate liquid flow to all chambers. Header diameters are listed below:
- Header diameter must be 1.5 times larger than process connection diameter for two chambers.
- Header diameter must be 2 times larger than process connection diameter for three or four chambers.
- Header diameter must be 2.5 times larger than process connection diameter for five or more chambers.
2/8
Valves, tees, elbows and other pipe fittings in a header must be the
same diameter as the recommended header diameter.
Form 1428 (05.16) ©SOR Inc.
Page 3
Not following these installation instructions, including pipe and valve diameter and pipe lengths can affect operation of the switch, including
differential. See Single Switch Chamber Installation Switch Chamber Installation
.
and Multiple
Insulation of the control chamber is acceptable, but switch housing and cover must not be insulated.
Single Switch Chamber Installation
Locate switch chamber process connection 12” to 24” (300mm to 600mm) away from
the process pipe or tank.
Locate the switch chamber so that the switch actuates or deactuates at the desired level. For liquids with a specific gravity of 1.0, switch actuation will occur approximately 3/4” (20mm) above the chamber centerline and deactuation will occur at approximately 3/8” (10mm) above the chamber centerline. Consult factory for other specific gravity values.
Connect the bottom chamber process connection to the process pipe or tank 6” to 12”
(150mm to 300mm) below the centerline of the chamber. This will ensure liquid level in the switch chamber is as close as possible to process liquid level.
Inside diameter of piping, including elbows, tees and valves, must be equal to or
greater than process connection diameter.
One elbow is recommended to connect the level switch with the process pipe or tank.
Drawing 0390736
ISOLATION
2210 LEVEL
SWITCH WITH
EXTERNAL
CHAMBER
ELBOW
304.8 609.6 TO
12.0 24.0
RECOMMENDED
VALVE
PIPE
PROCESS TANK
LIQUID SET POINT
152.4 304.8 TO
6.0 12.0
RECOMMENDED
Deviating from any of these instructions may adversely affect operation of the level switch by restricting liquid  ow into the switch chamber. The recommended dimensions allow adequate space for isolation valves, pipe  ttings and insulation. Structural support (not shown) must be provided for level switch chambers.
Form 1428 (05.16) ©SOR Inc.
3/8
Page 4
0
O
Multiple Switch Chamber Installation
The header pipe diameter for three (3) or four (4) chambers needs to be two times the process connection diameter. For 1” (25mm) process connections, the pipe header must be 2” (50mm) in diameter. This includes pipe connecting the header to the process, fittings, valves and other pipe equipment installed as part of the header piping. Headers should be arranged to use one elbow or tee to connect to the process pipe or tank.
Pipe connecting the header to individual chambers can be the same size as the process
connection on the switch chamber. Fittings and valve diameters must also be equal to or greater than the process connection diameter. One elbow is recommended to connect the level switch chamber to the header pipe.
Install each chamber so that the actuate or deactuate point is at the desired process
liquid level. See Single Switch Chamber Note 2 for set point locations.
Locate the header 8” to 16” (200mm to 400mm) away from the process tank. Locate switch chamber process connection 12” to 18” (300mm to 450mm) away from
the header pipe.
Horizontal spacing of level switch chambers should be 6” to 12” (150mm to 300mm).
Drawing 0390736
152.4 304.8
6.0 12.0
TEE TO
PROCESS TANK
50.8 HEADER PIPE
TO
VENT HEADER
2.0
ISOLATION VALVE
25.4 PIPE TO
1.0
EACH CHAMBER
ELBOW
PROCESS TANK
LIQUID SET POINTS
THREE 2210 LEVEL SWITCHES WITH EXTERNAL
CHAMBERS
SUPPLY HEADER
Deviating from any of these recommendations may adversely affect operation of the level switch by restricting liquid  ow into the switch chamber. The recommended dimensions leave adequate space for isolation valves,  ttings and insulation. Structural support (not shown) must be provided for level switch chambers.
304.8 457.2 TO
12.0 18.0
RECOMMENDED
203.2 406.4 TO
8.0 16.0
RECOMMENDED
152.4 304.8 TO
6.0 12.0
RECOMMENDED
TO LOWEST
SET POINT
PRODUCT C
ALL DIME
UNLESS
1
ISO-90
4/8
Form 1428 (05.16) ©SOR Inc.
Page 5
Safety Integrity Level (SIL) Installation Requirements
The SOR pressure switches have been evaluated as Type-A safety related hardware. To meet the necessary installation requirements for the SIL system, the following information must be utilized:
Proof Test Interval shall be one year. Units may only be installed for use in Low Demand Mode. Products have a HFT (Hardware Fault Tolerance) of 0, and were evaluated in a
1oo1 (one out of one) configuration.
Form 1538 (03.12) ©2012 SOR Inc.
Electrical Installation
Remove the end cover to gain acess to the switch mechanism and terminal block. Feed the switching wires into the housing through the electrical connection. Wire
to the terminal block(s) as shown in temperature and electrical load required by the application. Keep wire length as short as possible to prevent damage when cover is installed.
Connect the ground wire to the green ground screw located on the outside of the housing.
. Select wires which are compatible with
Replace the switch cover. Ensure switch cover is screwed on all the way. Housing becomes very hot during regular use, high temp. conduit connections are
necessary.
Test the switch action by varying the liquid level in the chamber or tank.
WIRING CONTINUITY
SPDT DPDT
SPDT DPDT
All housings must be properly sealed at conduit connection to maintain NEMA classi cation.
The cover can become extremely hot during operation. Use adequate protection to prevent severe personal injury.
LIQUID
LEVEL
LOW
LIQUID
LEVEL
HIGH
1
4
2
5
3
6
Form 1428 (05.16) ©SOR Inc.
5/8
Page 6
Maintenance
Do not remove the cover when the unit is energized. Risk of electrical shock resulting in serious injury and/or death.
Keep the cover tightly secured to the housing.
Prevent moisture or dirt from entering the housing when the cover is off.
Check all screw terminal connections periodically. Vibration may loosen the
screw terminals.
Clean the float and counterweight mechanism periodically to assure continued
free movement.
Make no adjustments to the switch mechanism. It is factory calibrated for
optimum performance.
Troubleshooting
Symptom Probable Cause
a. The terminal block is wired incorrectly. Check wiring.
The float is in actuated position but the switch does not actuate.
The float is in de-actuated position but the switch remains actuated.
The control will not function when installed but operates when removed from process connection.
Liquid is in the vessel at the actuation level but the unit does not respond.
b. The unit is installed upside-down. Rotate housing so
that the nameplate faces up.
c. The switch is damaged. Contact the factory.
a. The terminal block is wired incorrectly. Check wiring. b. The switch is damaged. Contact the factory.
a. Float travel is inadequate. Check for internal vessel obstructions.
See Mounting Requirements
a. The float pivot pin is bound up or dirty. Clean the float pivot pin. b. The unit is installed upside-down. Rotate housing so that the
nameplate faces up. c. The specific gravity of the liquid is not sufficient to lift the float. d. The float is leaking or collapsed. Contact the factory.
6/8
Form 1428 (05.16) ©SOR Inc.
Page 7
Replacement Parts
Replacement switch assemblies include: bracket, terminal block, magnet, microswitch(es) installation screws and ground screw. Order replacement parts by part number.
Part Number Description
3698150 SPDT Switch Assembly (A1) 3698151 DPDT Switch Assembly (A4) 3698158
3698159
SPDT Switch Assembly (S1) DPDT Switch Assembly (S4)
3698184 Interface & Float Assembly 3698185 Interface Gasket 2414001 Interface Screws
Maximum Operating Pressure Ratings*
Pressure at Listed Temperature in psig (bar)
Chamber
Designator
A
Chamber
Description
S40
Carbon Steel
(includes float)
100°F
(38°C)
1435
(99)
200°F
(93°C)
1435
(99)
300°F
(149°C)
1435
(99)
400°F
(204°C)
1435
(99)
500°F
(260°C)
1435
(99)
600°F
(316°C)
1435
(99)
650°F
(343°C)
1435
(99)
700°F
(371°C)
1378
(95)
750°F
(399°C)
1244
(86)
S40
C
Stainless Steel
(includes float)
* Maximum operating pressure is limited by the float or chamber, depending on the temperature.
Form 1428 (05.16) ©SOR Inc.
1799
(124)
1550
(107)
1397
(96)
1282
(88)
1196
(82)
1129
(78)
1110
(77)
1081
(75)
1072
(74)
7/8
Page 8
SORInc.com
14685 West 105th Street, Lenexa, KS 66215  913-888-2630  800-676-6794 USA  Fax 913-888-0767
8/8
Registered Quality System to ISO 9001
Form 1428 (05.16) ©SOR Inc.