Go/No Go Test Script Specification, Electrical
Go/No Go Test Script Specification,
Electrical
Applicable for S700i and S700c
Contents
General............................................................................................................................. 2
1
1.1 About this document..........................................................................................2
1.2 Script Requirements ..........................................................................................2
1.3 General definitions ............................................................................................3
2 Test sequence using an RF shield box and coupler......................................................4
2.1 Initialising and call set-up .................................................................................4
2.2 Audio loop back ................................................................................................5
2.3 Measurement group Low channel 900 ..............................................................5
2.4 Measurement group Mid channel 900 ...............................................................5
2.5 Measurement group High Channel 900.............................................................6
2.6 Measurement group Low channel 1800 ............................................................6
2.7 Measurement group Mid channel 1800 .............................................................6
2.8 Measurement group High channel 1800............................................................ 7
2.9 Measurement group Low channel 1900 ............................................................7
2.10 Measurement group Mid channel 1900 ............................................................. 7
2.11 Measurement group High channel 1900............................................................8
3 Test sequence using an RF shield box and coupler......................................................9
3.1 Initialising and call set-up .................................................................................9
3.2 Audio loop back ..............................................................................................10
3.3 Measurement group Low channel 900 ............................................................10
3.4 Measurement group Mid channel 900 .............................................................10
3.5 Measurement group High Channel 900...........................................................11
3.6 Measurement group Low channel 1800 ..........................................................11
3.7 Measurement group Mid channel 1800 ...........................................................11
3.8 Measurement group High channel 1800.......................................................... 12
3.9 Measurement group Low channel 1900 ..........................................................12
3.10 Measurement group Mid channel 1900 ........................................................... 12
3.11 Measurement group High channel 1900..........................................................13
4 Attenuation factors for Sony Ericsson S700i..............................................................14
4.1 Attenuation factors for Rohde&Schwarz antenna coupler use........................14
4.2 Attenuation factors for RF-fixture use (Direct line connection)......................15
5 Revision history.............................................................................................................15
2/1524-2/FEA 209 544/89 A
Company Internal
Sony Ericsson Mobile Communications AB
Approved according to 000 21-LXE 107 42/1
Go/No Go Test Script Specification, Electrical
1 General
1.1 About this document
This document contains the test requirements for E-GSM900, GSM1800 and GSM1900
pocket transceivers for use with antenna coupler or RF adapter. This test sequences should be
used as an arrival and verification test of radio functionality.
Tests are done in signalling mode, i.e. a call has been established to the test instrument. The
test instrument controls the transceiver unit. RF performance is measured with an antenna
coupler or with a RF-connector and RF cable, whichever is selected.
1.2 Script Requirements
1. The test should be designed in such manner that it is possible to perform accurate testing
without demands on users system expertise.
2. The measurements should run automatically, though a certain amount of manual work is
included (and mandatory), such as call set-up (i.e. dialling number).
3. It should be possible to print or store the measurement results.
4. It should be possible to change the channels used in testing due to possible local radio
interference. The ranges for these settings are specified under the Channel Allocation
table.
5. All functions and settings should be protected in such manner that the end user cannot
directly change them. (For example, a password or encrypted settings file.)
6. The attenuation factors that should be used are stated in section 4. The test instrument
must be capable of using different attenuation factors for RX and TX. It must also be
possible to use various attenuation factors for different channels in each band.
NOTE! Any set-ups other than the one stated in this document must be discussed and
exempted by Sony Ericsson to be approved.
2/1524-2/FEA 209 544/89 A
Company Internal
Sony Ericsson Mobile Communications AB
2(15)
Go/No Go Test Script Specification, Electrical
1.3 General definitions
1.3.1 Channel allocation table
Band Ch definition Any ARFCN of:
E-GSM900 Low 975-979
E-GSM900 Mid 36-40
E-GSM900 High 120-124
GSM1800 Low 512-517
GSM1800 Mid 697-702
GSM1800 High 880-885
GSM1900 Low 512-517
GSM1900 Mid 658-663
GSM1900 High 805-810
1.3.2 Power level allocation table
Band PL definition Powerlevel (PL)
E-GSM900 Low 19
E-GSM900 Mid 12
E-GSM900 High 5
GSM1800/1900 Low 15
GSM1800/1900 Mid 8
GSM1800/1900 High 0
1.3.3 Test limits
The test limits for each measurement is specified in the Sequence tables.
Since the coupler introduces higher measurement inaccuracy, some measurements have wider
limits than stated in the GSM specifications.
The direct line connection limits conform to the phase 2 GSM specifications.
2/1524-2/FEA 209 544/89 A
Company Internal
Sony Ericsson Mobile Communications AB
3(15)
Go/No Go Test Script Specification, Electrical
2 Test sequence using an RF shield box and coupler
2.1 Initialising and call set-up
Parameter Value Unit
BCCH Mid Ch
TCH Mid Ch
TX power level High PL
RF output power -40 dBm
System GSM 900
2.1.1 Sequence
1. Initialise instrument.
2. Insert a test-SIM and a fully charged standard battery. It’s very important that a fully
charged battery is used otherwise there is a high risk for incorrect test results.
3. Position the phone in the coupler according to the picture. (Fig.1 )
Fig.1 Position of the phone in
to the Rohde&Schwarz holder.
2/1524-2/FEA 209 544/89 A
Company Internal
Sony Ericsson Mobile Communications AB
4(15)
Go/No Go Test Script Specification, Electrical
4. Turn on the phone and wait for registration.
5. Set up a call to the instrument or let the instrument call the phone.
6. Close the lid on the shielding box.
2.2 Audio loop back
1. Set power level to high.
2. Activate audio loop back in the test instrument.
3. Operator must acknowledge passed or fail before the test is continued.
2.3 Measurement group Low channel 900
Parameter Value Unit
TCH Low Ch
TX power level High PL
RF output power -68 dBm
System GSM 900
2.3.1 Sequence
Measurement Test limits Unit
TX power
RMS Phase error
Rx Level 34-50 Units
Rx Quality 0-3 Units
32 +/- 4
0 +/- 5
2.4 Measurement group Mid channel 900
Parameter Value Unit
TCH Mid Ch
TX power level Mid PL
RF output power -102 dBm
System GSM 900
dB
deg
2.4.1 Sequence
TX power
RMS Phase error 0 +/– 5 deg
Peak Phase error 0 +/- 20 deg
Freq error +/- 90 Hz
Rx Level 2-14 Units
Rx Quality 0-3 Units
2/1524-2/FEA 209 544/89 A
Company Internal
Sony Ericsson Mobile Communications AB
Measurement Test limits Unit
19 +/- 5
dB
5(15)