SOLIS Single Phase Inverter Installation And Operation Manual

Page 1
2014, Ningbo Ginlong Technologies Co., Ltd.
C
Ningb o Gi nlong Te chn ol ogies C o. , Ltd.
No. 57 Ji nt ong Roa d, B inhai I nd ust ri al Park ,
Xiang sh an, Nin gb o, Zhej ia ng, 3 15 712, P.R. China
Tel: +86 (0 )5 74 6578 1 80 6
Fax: +8 6 (0 )574 65 78 1 606
Email : in fo@gi nl ong.c om
Ple ase rec ord t he se rial nu mber of y our i nve rte r and q uot e thi s whe n you con tact us .
PV Grid Tie Inverter
Inst al la tion and Oper at ion Manual
Solis Single Phase Inverter
Ver 2. 1
Page 2
1. Introduction
2. Safety Instructions
2.1 Safety Symbols
2.2 General Safety Instructions
2.3 Notice For Use
3. Overview
3.1 Front Panel Display
3.2 LED Status Indicator Lights
3.3 Keypad
3.4 LCD
4. Installation
4.1 Select Location for the Inverter
4.2 Mounting the Inverter
4.3 Electrical Connections
5. Start & Stop
5.1 Start the Inverter
5.2 Stop the Inverter
6. Operation
6.1 Main Menu
6.2 Information
6.3 Settings
6.3.1 Set Time
6.3.2 Set Address
6.4 Advanced Info.
6.4.1 Alarm Message
Contents Contents
.1. .2.
3
5
5
5
6
7
7
7
8
8
9
9
10
11
18
18
18
………………………
………………………………………
………………………………………………
………………………………
………………………
……………………………………………
…………………………………………………
………………………………………………
…………………
…………………………………
……………………………
………………………………………
………………………………
…………………………………
………………………………………………
……………………………………
………………………………………
19
19
19
21
21
21
23
23
…………………………………………………
……………………………………………
……………………………………………
………………………………………………
………………………………………
……………………………………
………………………………………
………………………………
6.4.3 Standard No.
6.4.4 Version
6.4.5 Communication Data
6.5 Advanced Settings
6.5.1 Select Standard
6.5.2 Grid ON/OFF
7. Maintenance
8. Trouble Shooting
9. Specifications
24
24
24
24
25
26
27
27
29
……………………………………
…………………………………………
…………………………
…………………………………
………………………………
…………………………………
………………………………………………
…………………………………………
……………………………………………
6.4.2 Temperature
23
……………………………………
1.1 Product Descriptions
3
…………………………………
1.2 Packaging
4
…………………………………………
Page 3
1. Introduction
1. Introduction
.4.
1.1 Pr oduct Des criptions
1.2 Pa ckaging
Figure 1.1 Front side view
.3.
Figure 1.2 Bottom side view
For 1-2kW single MPPT models For 2.5-5kW dual MPPT models
Sol is sing le phas e serie s inver ters ca n trans fer DC po wer fro m PV pane ls into AC
pow er and fe ed into g rid.
Sol is sing le phas e serie s inver ters co ntain 9 m odels w hich ar e liste d below :
Sol is-1K -2G Sol is-1. 5K-2G S olis- 2K-2G S ol is- 2.5 K-2G So lis-3 K-2G
Sol is-3. 6K-2G S olis- 4K-2G S olis- 4.6K- 2G Soli s- 5K- 2G
Par t NO.
1
Des cript ion
PV gr id tie in verte r
2
Wal l mou nti ng brac ket
3
Loc king sc rews
4
Exp ansio n screw s
5
AC con necto r
6
DC co nnect ors
1
76
5
3
2
4
Man ual
7
Num ber
1
1
2
4
1
1 pai r for 1-2 k model s 2 pai rs for 2. 5-5k mo dels
1
When you receive the inverter, please check if all the parts listed below are included:
Table 1.1 Material list
Optional Optional
Page 4
2.Safety Instructions2.Safety Instructions
2.2 Ge neral Saf ety Instruc tions
WARNIN G:
Ele ctric al inst allat ions mu st be don e in acco rdanc e with th e local a nd nati onal ele ctric al safe ty stan dards
2.3 No tice For Us e
The i nvert er has be en cons truct ed acco rding t o the app licab le safe ty and te chnic al gui delin es. Use t he inve rter in i nstal latio ns that m eet the f ollow ing sep cific ation O NLY:
1. Per man ent i ns tal lat io n is re qui red.
2. The i nve rte r mu st be c onn ec ted t o a sep arate g round ed AC grou p, to whi ch no oth er
ele ctric al equi pment i s conne cted.
3. The e lec tri ca l ins tal la tio n mus t meet al l the app licab le regu latio ns and st andar ds.
4. The i nve rte r mu st be i nst al led a cco rding t o the ins truct ions st ated in t his man ual.
5. The i nve rte r mu st be i nst al led a cco rding t o the cor rect te chnic al spec ifica tions .
6. To star tup t he in ve rte r, the G ri d Sup ply M ain Swi tch (AC ) must be s witch ed on, be fore
the s olar pa nel's D C isola tor sha ll be swi tched o n. To st op t he in ver te r, the G rid S up ply
Mai n Switc h (AC) mu st be swi tched o ff befo re th e solar p anel' s DC isol ator sh all be
swi tched o ff.
.5.
.6.
CAUTI ON:
The P V array ( Solar p anels ) suppl ies a DC vo ltage w hen it is e xpose d to ligh t.
CAUTI ON:
Ris k of elec tric sh ock fro m energ y store d in capa citor s of the In verte r. Do not rem ove cov er unti l 5 minut es afte r disco nnect ing all s ource s of supp ly. Serv ice tec hnici an only. Wa rrant y may be vo ided if a ny unau thori zed rem oval of c over.
CAUTI ON:
The s urfac e tempe ratur e of the in verte r can rea ch up to 75 ( 167 F). To avoi d risk of b urns, d o not tou ch the su rface w hen inv erter i s opera ting. Inv erter m ust be in stall ed out th e reach o f child ren.
CAUTI ON:
CAU TION, R ISK OF EL ECTRI C SHOCK s ymbol i ndica tes imp ortan t safet y ins truct ions, w hich if n ot corr ectly f ollow ed, cou ld resu lt in ele ctric s hock.
CAUTI ON:
CAU TION, H OT SURFA CE sy mbol in dicat es safe ty inst ructi ons, wh ich if no t cor rectl y follo wed, co uld res ult in bu rns.
NOTE:
NOT E symbo l indic ates im porta nt safe ty inst ructi ons, wh ich if no t corre ctly fol lowed , could r esult i n some da mage or t he dest ructi on of the i nvert er.
WARNIN G:
To redu ce the ri sk of fir e, bran ch-ci rcuit o ver-c urren t prote ctive d evice s (OC PD) are r equir ed for ci rcuit s conne cted to t he Inve rter. The t rip cur rent fo r over cu rrent f or AC and DC i solat or shou ld be hig her tha n inver ter rat ed curr ent, bu t not exc eed 125 % of inve rter ra ted cur rent. The r ated vo ltage O CPD sho uld be hi gher th an loca l grid vo ltage .
CAUTI ON:
Ris k of elec tric sh ock. Do n ot remo ve cove r. Th er e is no u ser s er vic eab le par ts insi de. Ref er serv icing t o quali fied an d accre dited s ervic e techn ician .
2.1 Sa fety Symb ols
Saf ety sym bols us ed in thi s manua l, whic h highl ight po tenti al safe ty risk s and imp ortan t
saf ety inf ormat ion, ar e liste d as foll ows:
WARNIN G:
WAR NIN G sym bol ind icate s impor tant sa fety in struc tions , which i f not cor rectl y follo wed, co uld res ult in se rious i njury o r death .
Imp roper u se may re sult in p otent ial ele ctric s hock ha zards o r burns . Th is m anu al
con tains i mport ant ins truct ions th at shou ld be fol lowed d uring i nstal latio n and
mai ntena nce. Pl ease re ad thes e instr uctio ns care fully b efore u se and ke ep them f or
fut ure ref erenc e.
WARN ING :
Ple ase d on’t c onn ect P V arra y pos iti ve(+) or ne gat ive (-) to t he gr ound , it co uld
cau se se riou s dam age t o the in ver ter.
Page 5
3. Overview
3.3 Ke ypad3.1 Fr ont Panel D isplay
Fig ure 3.1 F ront Pa nel Dis play
3.2 LE D Status In dicator Lig hts
The re are th ree LED s tatus i ndica tor lig hts in th e front p anel of t he inve rter. Le ft LED: POW ER LED (r ed) ind icate s the pow er stat us of the i nvert er. Midd le LED: O PERATI ON LED ( green ) indic ates th e opera tion st atus. R ight LE D: ALARM L ED (yel low) in dicat es the a larm st atus. P lease s ee Tab le 3 .1 fo r det ai ls
Des cript ion
The i nvert er can de tect DC p ower
No DC p ower or l ow DC pow er
The i nvert er is ope ratin g prope rly.
The i nvert er has st opped t o suppl y power.
The i nvert er is ini tiali zing.
Ala rm or fau lt cond ition i s detec ted.
The i nvert er is ope ratin g prope rly.
Sta tus
ON
OFF
ON
OFF
OFF
ON
FLA SHING
Lig ht
POW ER
OPE RATION
ALA RM
3.4 LC D
The re are fo ur keys i n the fro nt pane l of the In verte r(fro m left to r ight) :
ESC , UP, DO WN a nd EN TER k ey s. Th e key pad i s used fo r:
Scr ollin g throu gh the di splay ed opti ons (th e UP and DO WN ke ys);
Acc ess to mo dify th e adjus table s ettin gs (the E SC and EN TER key s).
3. Overview
The t wo-li ne Liqu id Crys tal Dis play (L CD) is lo cated a t the fro nt pane l of the In verte r,
whi ch show s the fol lowin g infor matio n:
Inv erter o perat ion sta tus and d ata;
Ser vice me ssage s for ope rator ;
Ala rm mess ages an d fault i ndica tions .
Table 3 .1 Stat us Indi cator L ights
.7. .8.
Page 6
4. Installation
4.1 Se lect a Loca tion for the In verter
4. Installation
To sele ct a loca tion fo r the inv erter, t he foll owing c riter ia shou ld be con sider ed:
The t emper ature o f the inv erter h eat-s ink cou ld up to 75.
The i nvert er is des igned t o work in e xtrem e tempe ratur es. The a mbi ent ope ratin g
tem perat ure ran ge is fro m -25 to 60.
If th ere is mo re than 1 i nvert er inst alled t ogeth er, A mi nim um 30 0m m cle ara nc e
sho uld be ke pt betw een eac h inver ter. The b ott om of the i nvert er shou ld be 500 mm
cle aranc e to the gr ound.
Vis ibi lity of t he LED st atus in dicat or ligh ts and th e LCD loc ated at t he fron t panel o f
the i nvert er shou ld be con sider ed.
Adeq uate ve ntil atio n must be pro vide d if the inv erte r is to be inst alled i n a confin ed spac e.
Inv erter s hould b e mount ed in a ver tical p ositi on as sho wn in Fig ure 4.2 . Th e st eps t o
mou nt the in verte r on the wa ll are gi ven as fo llows :
1. Loc ate t he wa ll s tud s in th e de sir ed lo catio n and ali gn the wa ll moun t brack et over
the s tuds. M ark the m ounti ng hole s. For ma sonry w alls, t he moun ting ho les sho uld be
for a s uitab le dyna bolt ty pe moun ting sy stem.
2. MAKE S URE BR ACK ET IS horiz ont al. E nsu re th at the A, B, C, an d D moun tin g hol es
(in F igu re 4.3 ) are a lig ned w ith th e wal l's m ost s ecu re poi nts ( e.g . wal l stu ds in ca se of
cla d bui ldi ng mat eri als ).
.9. .10 .
NOTE:
Not hing sh ould be s tored o n or plac ed agai nst the i nvert er.
4.2 Mo unting th e Inverter
Ple ase use s uitab le fixi ngs for w all typ e (e.g. u se dyna bolts f or bric k, maso nry, etc ).
Fig ure 4.2 I nvert er Moun ting
Bra cket
M4×25 s tainl ess ste el scre w
Inv erter
5.5×3 8 stain less st eel scr ew
WARNIN G:
Bra cket mu st be mou nted ve rtica lly on a ve rtica l wall su rface .
300m m
500m m
500m m
300m m 300m m
300m m
300m m
Fig ure 4.1 I nvert er Moun ting cl earan ce
Page 7
4.3 El ectrica l Connectio ns
The e lectr ical co nnect ion of th e inver ter mus t follo w the ste ps list ed belo w:
1. Swi tch t he So la r Sup ply M ai n Swi tch ( AC) OFF.
2. Swi tch t he so la r pan el DC I so lat or OF F.
The I nvert er is des igned f or elec trica l conne ction w ithou t remov ing the c over. Th e mea ning of th e symbo ls loca ted at th e botto m of the in verte r are lis ted in Tabl e 4.1 .All el ectri cal ins talla tions m ust be in a ccord ance wi th all lo cal and n ation al elec trica l codes .
.11. .12 .
4. Installation 4. Installation
Table 4.1 Terminals
+
-
Pos itive D C input t ermin al
Neg ative D C input t ermin al
DC 1
Pos itive o r negat ive DC 1 in put ter minal
DC 2
Pos itive o r negat ive DC 2 in put ter minal ( for 2.5 -5k mod els)
DC SW ITCH
Swi tch of DC i nput te rmina ls(op tiona l)
COM
Com munic ation c onnec tion eq uipme nt term inal (O ption al)
GRI D
Gri d wires c onnec tion eq uipme nt term inal
3. Con nec t PV in pu t of th e Inv er ter.
Bef ore c onne cti on, p lea se mak e sur e the po lar ity o f the ou tpu t vol tage o f PV ar ray
mat che s theDC +andD C-sy mbols.
Max imum 500Vo c for
Sol is- 1K- 2G Sol is- 1.5 K-2 G Soli s-2 K-2 G
Max imum 600Vo c for
Sol is- 2.5 K-2G S oli s-3 K-2 G Soli s-3 .6K -2G
Sol is- 4K- 2G Sol is- 4.6 K-2 G Soli s-5 K-2 G
3. Car eful ly han g the inv erte r on the up per part of the wa ll mou nt bracket by f itti ng the
hook s into th e slot of t he bracket . Use M4×25 st ainless st eel sc rews and wash ers
at holes E and F (in Fi gure 4 .2) to se cure t he moun ting hooks t o the rea r of the invert er.
Fig ure 4.3 W all M oun t Brack et
A
B
C
D
Inv erter
E(F)
Bef ore c onne cti ng in ver ter, pl eas e make sure t he PV ar ray o pen c ircu it vo lta ge is
wit hin t he lim it of t he inv ert er
Ple ase d on’t c onn ect P V arra y pos iti ve or ne gat ive pole to t he gr ound , it co uld
cau se se riou s dam age s to the i nve rte r
Fig ure 4.3 D C+ Conn ector Fig ure 4.4 D C- Conn ector
Ple ase use q ualif ied DC ca ble for P V syste m.
Page 8
iii ) Cri mp the co ntact p in to the w ire usi ng a prop er wire c rimpe r as show n in Figu re 4.8
Fig ure 4.8 C rimp th e conta ct pin to t he wire
iv) In ser t the c on tac t pin t o th e top p art o f the con ne cto r and s crew up t he cap nu t to
the t op part o f the con necto r (as sho wn in Fig ure 4.8 ).
Fig ure 4.9 C onnec tor wit h Cap nut S crewe d on
.13 . .14 .
4. Installation
The s teps to a ssemb le the DC c onnec tors ar e liste d as foll ows:
I) Str ip of f the D C wir e fo r abo ut 7m m, D isa sse mble th e conne ctor ca p nut (se e Figur e 4.6).
ii) In ser t the w ir e int o the c on nec tor c ap nut an d conta ct pin as s hown in F igure 4 .7.
Fig ure 4.6 D isass emble t he Conn ector C ap nut
Fig ure 4.7 I nsert t he Wire i nto the C onnec tor Cap n ut and co ntact p in
Fig ure 4.1 0 Conne ct the DC C onnec tors to t he Inve rter
v) Th en co nnect t he DC con necto rs to the i nvert er. Smal l click w ill con firm co nnect ion (as s hown in F igure 4 .10).
The re are sy mb ols m ark ed insi de the co nnect or ( see Fi gure
4.11 ), th e Line wi re of gri d must be c onnec ted toLte rmina l; the Ne utral w ire of gr id must b e conne cted toNt ermin al; the E arth of g rid mus t be conn ected to (s ee Figu re 4.11) .
4. Co nnect t he grid s ide of th e Inver ter.
For a ll AC conn ectio ns, 2.5 - 4mm 10 5 cable i s requi red to be u sed. Pl ease ma ke sure
2
the r esist ance of c able is l ower th an 1.5 oh m. If the w ire is lo nger th an 20m, i t's rec ommen ded to us e 4mm ca ble.
2
WARNIN G:
4. Installation
Page 9
Fig ure 4.1 2 AC G rid Ter min al Co nn ect or
Fig ure 4.11 AC G rid Ter min al Conn ector I nside
The s teps to a ssemb le the AC gr id term inal co nnect ors are l isted a s follo ws:
a) Dis ass emb le t he AC co nne ctor. St ri p the AC w ire s about 6 mm,
c) Tigh ten t he ca p nu t to th e ter mi nal ( as sh own in Fi gure 4. 15).
Fig ure 4.1 3 Strip ped AC Wir es
Fig ure 4.1 5 Ti ght U p the C ap o n the Ter min al
d) Con nec t the AC g ri d ter min al c onn ect or to the i nvert er. Smal l click w ill con firm
con necti on (as sh own in Fi gure 4. 16).
Fig ure 4.1 6 Conne ct the Term ina l Conne ctor to t he Inve rter
4. Installation 4. Installation
Eac h Solis S ingle P hase In verte r is supp lied wi th an AC gri d termi nal con necto r, which i s sho wn in Fig ure 4.1 2.
.15 . .16 .
b) Fi x the gre en and ye llow wi re to the g round t ermin al. Fix t he red( or brow n) wire t o L
(li ne) ter minal . Fix the b lue wir e to N(Ne utral ). Tight t he scre ws on the c onnec tor (as
sho wn in Fig ure 4.1 4). Ple ase try t o pull ou t the wir e to make s ure the i t’s wel l
con necte d.
Fig ure 4.1 4 Conne ct Wire s to the Term ina l
Page 10
5. Start & Stop
5.1 St art the Inv erter
To start up the Inverter, it is important that the following steps are strictly followed:
1. Swi tch t he So la r Sup ply M ai n Swi tch ( AC) ON fi rst.
2. Swi tch t he DC I so lat or ON . If t he vo lta ge o f PV ar ray s are hig her tha n start u p volta ge,
the i nvert er will t urn on. T he re d LED pow er will l ight, a nd the LC D shows t he comp any's
nam e and the i nvert er mode l.
Sol is-5K -2G
Fig ure 5.1 C ompan y Name an d Inver ter Mod el on LCD
3. Whe n bot h the D C an d the AC g rid s id es su ppl y to the in verte r, it will b e ready t o
gen erate p ower. In itial ly, the in ver ter wil l check b oth its i ntern al para meter s and the
par amete rs of the AC g rid, to e nsure t hat the y are wit hin the a ccept able li mits. At t he
sam e time, t he gree n LED wil l flash a nd the LC D displ ays the i nform ation o f
INI TIALI ZING.
4. Af ter 3 0-1 80 se con ds (d epe ndi ng on lo cal r equ ire men t), t he in verter wi ll st art t o
gen era te po wer. Th e gre en LE D will b e on co nti nua lly a nd the L CD di spl ays
GEN ERATI NG.
WARNIN G:
Do no t touch t he surf ace whe n the inv erter i s opera ting. I t may be hot a nd caus e burns .
5.2 St op the Inve rter
To stop t he Inve rter, th e follo wing st eps mus t be stri ctly fo llowe d:
1. Swi tch t he So la r Sup ply M ai n Swi tch ( AC) OFF.
2. Wait 30 s eco nds . Swi tch t he so lar p ane l DC Is ola tor O FF. All the L EDs o f the i nve rte r wil l
be of f in a min ute .
4. Installation
Gin long
.17 . .18 .
5. In verte r monit oring C onnec tion.
The i nvert er can be m onito red by Wi -Fi or GP RS func tions . Al l the c omm un ica tio n fun ction s are opt ional ( Figur e 4.18) , pleas e refer t o commu nicat ion con necti on ins truct ions.
Fig ure4. 18 Wi-F i commu nicat ion fun ction
Inter ne t
GPR S monit oring
Wi- Fi moni torin g
Sma rt phon e monit oring
PC mo nitor ing
Web s erv er
Rou ter
Wi- Fi moni torin g
Wi- Fi box
Page 11
6. Operation 6. Operation
6.1 Ma in Menu
Dur ing nor mal ope ratio n, the di splay a ltern ately s hows th e power a nd the op erati on
sta tus wit h each sc reen la sting f or 10 sec onds (s ee Figu re 6.1) . Scree ns can al so be
scr olled m anual ly by pre ssing t he UP and D OWN k eys. Pr ess the E NTER ke y to acce ss to
the M ain Men u.
Fig ure 6.1 O perat ion Ove rview
5 sec
Manufacturer Model name
Sta rt
Pow er 3424 W 01- 01-20 14 12:0 4
Sta tus: Ge nerat ing 01- 01-20 14 12:0 4
Inf ormat ion
Set tings
Adv anced I nfo.
Adv anced s ettin gs
UP/ DOWN
UP/ DOWN
UP/ DOWN
UP/ DOWN or
aut o-scr oll
(10 s ec)
Pre ssing t he
ENT ER key giv es acce ss to the m ain men u.
Pre ssing t he
ESC k ey
cal ls back t he
pre vious m enu.
Mai n Menu
The re are fo ur subm enus in t he Main M enu (se e Figur e 6.1):
1. Inf orm ati on
2. Set tin gs
3. Adva nce d Inf o.
4. Adva nce d Set ti ngs
6.2 In formati on
The S olis Si ngle Ph ase Inv erter m ain men u provi des acc ess to op erati onal da ta and
inf ormat ion. Th e inf ormat ion is di splay ed by sel ectin g "Info rmati on" fro m the men u and
the n by scro lling u p or down .
V_D C1 350. 8V I_D C1 5.1A
V_D C2 350. 8V I_D C2 5.1A
V_G rid 230 .4V I_G rid 8.1 A
Sta tus: Ge nerat ing Pow er: 148 8W
Gri d Frequ ency F_G rid 50. 06Hz
Total E nergy 025 8458 kw h
Thi s Month : 0123k wh Las t Month : 0123k wh
Today : 15.1k wh Yeste rday: 1 3.5kw h
10 se c
10 se c
10 se c
10 se c
10 se c
10 se c
10 se c
10 se c
V_D C1: Sho ws inpu t 01 volt age val ue.
I_D C1: Sho ws inpu t 01 curr ent val ue.
V_D C2: Sho ws inpu t 02 volt age val ue.
I_D C2: Sho ws inpu t 02 curr ent val ue.
V_G rid: Sh ows the g rid's v oltag e value
I_G rid: Sh ows the g rid's c urren t value .
Status: Shows instant status of the Inverter.
Power: Shows instant output power value.
F_G rid: Sh ows the g rid's f reque ncy val ue.
Total g enera ted ene rgy val ue
Thi s Month : Tota l en erg y gen er ate d thi s month .
Las t Month : Tota l en erg y gen er ate d las t month .
Today : Tota l en erg y gen er ate d tod ay.
Yest erd ay: Tot al ener gy ge ne rat ed ye st erd ay.
Dis play
Dur ation
Des cript ion
Table 6 .1 Info rmati on list
Pre ssing t he ESC ke y retur ns to the M ain Men u. Pres sing th e ENTER k ey lock s
(Fi gure 6. 2(a)) o r unloc ks (Fig ure 6.2 ( b)) the s creen .
5.2 St op the Inve rter
Fig ure 6.2 L ocks an d Unloc ks the Sc reen of L CD
(b)(a)
.19 . .20 .
Page 12
6.3 Se ttings
The f ollow ing sub menus a re disp layed w hen the S ettin gs menu i s selec ted:
1. Set Ti me
2. Set Ad dre ss
3. Res tor e Set ti ngs
6.3.1 Set Time
Thi s funct ion all ows tim e and dat e setti ng. Whe n this fu nctio n is sele cted, t he LCD wi ll
dis play a sc reen as s hown in F igure 6 .3.
NEX T=<EN T> OK=< ESC>
01- 01-20 10 16:3 7
Fig ure 6.3 S et Time
Pre ss the UP /DOWN k eys to se t time an d data. P ress th e ENTER k ey to mov e from on e
dig it to the n ext (fr om left t o right ). Pres s the ESC k ey to sav e the set tings a nd retu rn to
the p revio us menu .
6.3.2 Set Addr es s
YES =<ENT > NO=<E SC>
Set Ad dress : 02
Fig ure 6.4 S et Addre ss
Pre ss the UP /DOWN k eys to se t the add ress. P ress th e ENTER k ey to sav e the set ti ngs .
Pre ss the ES C key to ca ncel th e chang e and ret urn to th e previ ous men u.
6. Operation 6. Operation
Thi s funct ion is us ed to set t he addr ess whe n the inv erter i s conne cted to t he PC. Th e
add ress nu mber ca n be assi gned fr om “01” to “99” (see Fi gure 6. 4). The d efa ult add ress
num ber of So lis Sin gle Pha se Inve rter is “ 01”.
.21 . .22 .
6.4 Adv anced Inf o - Techni cians Onl y
Sel ect “Ad vance d Info. ” from th e Main Me nu to dis play a sc reen an d be able t o acces s to
the f ollow ing inf ormat ion.
1. Ala rm Me ssa ge
2. Tempe rat ure
3. Sta nda rd No .
4. Vers ion
5. Com mun ica ti on Da ta
The s creen c an be scr olled m anual ly by pre ssing t he UP/D OWN key s. Pres sing th e ENTER
key g ives ac cess to a s ubmen u. Pres s the ESC k ey to ret urn to th e Main Me nu.
6.4.1 Alarm Me ss ag e
The d ispla y shows t he 10 lat est ala rm mess ages (s ee Figu re 6.9) . Scree ns can be s croll ed
man ually b y press ing the U P/ DOWN k eys. Pr ess the E SC key to r eturn t o the pre vious
men u.
Ala rm0: OV- G-V
Tim e: 27 -11 Da ta: 7 171
Fig ure 6.9 Al arm Mes sage
6.4.2 Tempe ra tu re
The s creen s hows th e tempe ratur e insid e the inv erter ( see Fig ure 6.1 0).
Fig ure 6.1 0 Temp er atu re in si de th e Inv erter
Tempe ratur e
046 .6
NOTE:
To access t o thi s ar ea is f or f ull y qu ali fi ed an d ac cre di ted t echni cians o nly.
Page 13
6.4.3 Stand ar d No .
The s creen s hows th e refer ence st andar d of the In verte r (see Fi gure 6. 11) .
Sta ndard : G83/2
Fig ure 6.11 E xam ple of St andar d of the In verte r
6.4.4 Versio n
The s creen s hows th e model v ersio n and the s oftwa re vers ion of th e Inver ter
(se e Figur e 6.12) .
Mod el: 08
Sof tware Ve rsion : D2000 1
Fig ure 6.1 2 Model Ve rsion a nd Soft ware Ver sion
6.4.5 Commu ni ca ti on D ata
The s creen s hows th e inter nal dat a of the In verte r (see Fi gure 6. 13), wh ich is fo r servi ce
tec hnici ans onl y.
01- 05: 01 25 E 4 9D AA 06- 10: C2 B5 E 4 9D 55
Fig ure 6.1 3 Commu nicat ion Dat a
6.5 Adv anced Set tings - Technicia ns Only
Sel ect Adva nced Se tting s from th e Main Me nu to acc ess the f ollow ing opt ions:
1. Sel ect S tan da rd
2. Gri d ON/ OFF
3.C leari ng Ener gy
6. Operation 6. Operation
NOTE:
To access t o thi s ar ea is f or f ull y qu ali fi ed an d ac cre di ted t echni cians o nly.
For Techn ician s on ly.
.23 . .24 .
Thi s funct ion is us ed to sel ect the g rid's r efere nce sta ndard ( see Fig ure 6.1 4).
YES =<ENT > NO=<E SC>
Sta ndard : G83/2
Fig ure 6.1 4
NOTE:
This fu nct io n is fo r te chn ic ian s us e onl y.
NOTE:
Befor e to us in g thi s fu nct io n, pl ea se se t "G RID O FF " to st op inve rter (r efe r to Sect ion 6 .5 .2) .
Pre ss the UP /DOWN k eys to se lect th e stand ard (AS 4777, V DE410 5, UL17 41, G83 /2 (for
1-3 .6kW mo dels) , G59/3 ( for 4-5 kW mode ls) and “ User- Def” fu nctio n). Pre ss the EN TER
key t o confi rm the se tting . Press t he ESC ke y to canc el chan ges and r eturn s to prev ious
men u.
Sel ectin g the “Us er-De f” menu w ill acc ess to th e follo wing su bmenu ( see Fig ure 6.1 5),
NOTE:
The inv ert er i s cus to miz ed a cco rd ing t o th e loc al s tan dard be fore sh ippin g to the cu sto me r. The " U ser-D ef" fun cti on c an be o nl y use d by t he se rv ice engin eer a nd m ust t o be a llo we d by th e lo cal e ne rgy s up pli er.
Fig ure 6.1 5
Pres s the UP/DO WN keys to scr oll thro ugh item s. Pres s the ENTER ke y to edit the hig hligh ted
item . Press the UP /DOWN ke ys again to ch ange th e settin g. Press th e ENTER key to sa ve the
sett ing. Pre ss the ESC key to ca ncel cha nges an d return s to the previ ous menu .
6.5.1 Selec ti ng S ta nd ard
OV-V : 262 V UN- V: 210V
OV-V : 240 --- 270V
UN- V: 180- --2 10V
OV-G -F: 50. 3---5 2.0Hz (60.36 2.0Hz )
UN- G-F: 47 .0--- 49.5H z(57. 059.5H z)
Bel ow is the s ettin g range f or “Use r-Def ”. Usin g this fu nctio n, the li mits ca n be chan ged
man ually.
Page 14
.25 . .26 .
6. Operation
6.5.2 Grid ON /O FF
Thi s funct ion is us ed to sta rt up or st op the po wer gen erati on of Sol is Sing le Phas e
Inv erter ( see Fig ure 6.1 6).
Gri d ON
Gri d OFF
Fig ure 6.1 6 Set Gri d ON/OF F
Scr eens ca n be scro lled ma nuall y by pres sing th e UP/DO WN keys . Press t he ENTE R key
to sa ve the se tting . Press t he ESC ke y to retu rn to the p revio us menu .
6.5.3 Clear in g En er gy
NOTE:
Pleas e, se t "G rid O N" t o sta rt u p the i nv ert er a fte r the set tings ( refer t o Secti on 6. 5. 2). O th erw is e the i nv ert er w on' t st art u p.
Sol is Sing le Phas e Inver ter doe s not req uire an y regul ar main tenan ce. How ever, cl eanin g
the d ust on he at-si nk will h elp the i nvert er to dis sipat e the hea t and inc rease i ts life t ime.
The d ust can b e remov ed with a s oft bru sh.
CAUT ION:
Do not to uch th e inver ter' s surfa ce whe n it is oper atin g. Some p arts of th e inve rter may be ho t and cau se burn s. Turn off t he inve rter (r efer t o Secti on 5.2) a nd wait f or a cool -dow n perio d befor e befo re any ma intenance o r clean ing op eration.
The L CD and t he LED s tat us ind ica tor li ght s can be c lean ed wi th a dam p clot h if they are t oo
dir ty to be r ead.
NOT E:
Nev er use any sol vent s, abr asi ves or c orro siv e mate rial s to cle an the i nverter.
8. Trouble Shooting
The i nve rte r is de signed in a cco rda nce w ith t he mo st imp ort ant i nte rna tio nal g rid -ti ed
sta nda rds a nd sa fet y and el ect rom agn eti c com pat ibi lit y req uir eme nts . Befo re de liv eri ng to
the c ust ome r, the in ver ter h as be en su bje cte d to sev era l tes ts to e nsu re it s opti mal o per ati on
and r eli abi lit y.
In ca se of fai lure, t he LCD sc reen wi ll disp lay an al arm mes sage. I n this ca se, the i nvert er
may s top fee ding in to the gr id. The f ail ure des cript ions an d their c orres pondi ng alar m
mes sages a re list ed in Table 8 .1:
7. Maintenance
Page 15
8. Trouble Shooting
Ala rm Mess age
OV-G -V
UN- G-V
OV-G -F
UN- G-F
G-I MP
NO- Grid
OV-D C
OV-B US
UN- BUS
SHO RT-PRO
INI -PRO
TEM -PRO
GRO UND-P RO
Fai lure de scrip tion
Ove r grid vo ltage
Und er grid v oltag e
Ove r grid fr equen cy
Und er grid f reque ncy
Hig h grid im pedan ce
No gr id
Ove r DC volt age
Ove r DC bus vo ltage
Und er DC bus v oltag e
Tempo rary hi gh AC curr ent
Ini tiali zatio n syste m fault
Ove r Temp eratu re
Gro und fau lt
Table 8 .1 Fail ure Sce nario s
NOTE:
If the in ver te r dis pl ays a ny a lar m me ssa ge a s lis te d in Tabl e 8.1 ; pl eas e turn of f the i nvert er (ref er to S ec tio n 5. 2 to st op y our i nv ert er ) and w ai t for 5 minut es be fo re re st art in g it (r ef er to S ec tio n 5. 1 to st art you r inver ter ). I f the failu re pe rs ist s, p lea se c ont ac t you r lo cal d is tri butor o r the ser vice ce nte r. Pleas e kee p re ady w it h you t he f oll ow ing i nf orm at ion b efore c ontac ting us .
1. Seri al nu mbe r of Sol is Si ngl e Pha se In ver ter ;
2. The dis tri but or/ dea ler o f Sol is Si ngl e Phase Inv ert er (i f ava ila ble );
3. Inst all ati on da te.
4. The des cri pti on of p rob lem ( i.e . the al arm m ess age d isp lay ed on t he LCD and th e sta tus
of th e LED statu s ind ica tor l igh ts. O the r rea din gs obt ain ed fr om th e Inf orm ati on su bme nu
(re fer t o Sec tio n 6.2) w ill a lso b e hel pfu l.) ;
5. Sy ste m des ign f or the s ola r PV ar ray c onf igu rat ion (e .g. n umb er of p ane ls, c apa cit y of
pan els , num ber o f stri ngs , etc .);
6. Your c ont act de tai ls.
G83 /2
DC Sw itch Opt ional
Page 16
G83 /2
DC Sw itch Opt ional
G83 /2
DC Sw itch Opt ional
Page 17
G59 /3
DC Sw itch Opt ional
.31.
.32.
G59 /3
DC Sw itch Opt ional
Page 18
G59 /3
DC Sw itch Opt ional
.33.
Loading...