4/20
Siemens Building Technologies CC1N7153en
HVAC Products 14.10.2002
Installation notes
· Installation work must be carried out by qualified staff
· Live and neutral conductors may not be mixed up
Electrical connection of the flame detector
It is important to achieve practically disturbance-free signal transmission:
· Never run the detector cable together with other cables
– Line capacitance reduces the magnitude of the flame signal
– Use a separate low-capacitance cable
· Observe the permissible cable lengths (refer to «Technical data»)
· Always run high-voltage ignition cables separately, with the greatest possible dis-
tance to the unit and to other cables
Commissioning notes
· Commissioning work must be carried out by qualified staff
· When commissioning the plant or when doing maintenance work, make the follow-
ing safety checks:
Safety check Anticipated response
a) Burner startup with flame detector
darkened
Lockout at the end of «TSA»
b) Burner startup with flame detector
exposed to extraneous light
Lockout after 40 seconds at the
latest
c) With wire strap «B»:
Simulation of loss of flame during
operation. For that purpose, darken
the flame detector during operation
and maintain this state
Lockout
d) Without wire strap «B»:
Simulation of loss of flame during
operation. For that purpose, darken
the flame detector during operation
and maintain this state
Repetition followed by lockout at the
end of «TSA»
Standards
Conformity to EEC directives
- Electromagnetic compatibility EMC (immunity) 89 / 336 EEC
- Low-voltage directive 73 / 23 EEC
Service notes
· Maintenance work must be carried out by qualified staff
· Each time a unit has been replaced, check to ensure that wiring is in an orderly
state and that the wires are firmly connected
Disposal notes
The unit contains electrical and electronic components and may not be disposed of
together with household waste.
Local and currently valid legislation must be observed.