Siemens Arcadis Varic Maintenance Protocol

Würthwein
ARCADIS Varic
Maintenance Protocol
System
Customer:
SP
Address:
Department:
Room:
Contact person:
Telephone:
Customer no.:
Cust. specific no.:
Date.:
The instructions SPR2-310.831.01.02.02 is requied for these protocol
Print No.: Replaces: SPR2-310.832.01.01.02
SPR2-310.832.01.02.02
© Siemens AG
The reproduction, transmission or use of this document or its contents is not permitted without express written authority. Offenders will be liable for damages. All rights, including rights created by patent grant or registration of a utility model or design, are reserved.
English Doc. Gen. Date: 08.04
2004
Cust.-No.: Date: Protocol
1Protocol
SIEMENS Office:
Address:
Region:
Country:
Contact person:
Tel.:
CSE in charge:
Tel.:
Remarks Regarding the Protocol:
The protocol is valid as proof of quality for one check that must be performed on the sys­tem / component in one year.
The check must be performed in the specified intervals.
The results of the check are entered in this protocol.
The page numbers after the checkpoints refer to the corresponding page in the appropri­ate instructions (see cover page).
The protocol must be completely filled out by the Customer Service Engineer, i.e.:
All boxes must be filled out. If a box does not apply to the system or if no entry needs to
be made, check the “n.a.“ box.
Enter the customer number (Cust. No.:) and the date of the check in the header of each
page so that each page can be allocated to a customer and to a check date.
If there are complaints, the IVKs for the component about which a complaint has been
made as well as the type of complaint must be entered in the “Open Points“ table pro­vided for this. Correction of these open points also must be documented in this table with the date and a signature. If there are no open points, check “No“ and document this with the date and a signature.
If movable components (also test phantoms that are part of the system) that can be
used in different systems are used for the check, they must be entered in the “Movable Components“ table provided for this.
The measurement values for the measurements that must be performed during the
check must also be entered in the open spaces / tables provided for them.
After completing the check, Page 3 of this protocol must be filled out and signed.
ARCADIS Varic SPR2-310.832.01.02.02 Siemens AG
08.04 CS SD 24
Page 2 of 8
Medical Solutions
Protocol Date: Cust.-No.:
Further Processing and Archiving of the Protocol
The protocol is a document and thus must be archived. After completing the test, it must be filed in the corresponding register in the “System Owner Manual“ binder. If needed, a copy can be handed to the customer.
System:
Serial No.:
Software Version:
Number of the Service Contract:
Type of Maintenance:
Evaluating the Condition of the System / Component
The system has no deficiencies. The image quality test resulted in no differences from required reference values.
The system / component has slight deficiencies that have no affect on continued operation of the system. However they should be corrected preventively.
The image quality test resulted in no differences from required reference values.
The system / component has serious deficiencies. For safety reasons, continued operation of the system is per­mitted only after successfully correcting the deficiencies.
After completing all work steps, an evaluation was performed.
Date: Name of Technician: Signature:
The operator or a person assigned for this has taken note of this evaluation.
(if national regulations require this)
Date: Name: Signature:
Siemens AG SPR2-310.832.01.02.02 ARCADIS Varic Medical Solutions
08.04 CS SD 24
Page 3 of 8
Cust.-No.: Date: Protocol
Explanation of Abbreviations in the Protocol
Abbrev. Explanation Abbrev. Explanation
SI Safety Inspection PMF Preventive Maintenance, Operat-
ing Value Check, Function Check
SIE Electrical Safety Inspection Q System Quality, Image Quality
SIM Mechanical Safety Inspec-
QIQ Image Quality
tion
PM Preventive Maintenance QSQ System Quality Check
PMP Periodic Preventive Mainte-
SW Software Maintenance
nance
PMA Preventive Maintenance
CSE Customer Service Engineer
Adjustments
Activities performed
Only additional activities that are not described in the instructions for the system / compo­nent need to be listed.
Date:
Activities performed:
OK not OKn.a.
Open Points
Yes No Date / Signature: _____________________
If “Yes“, enter the component with the IVK and the open point (only the number) in the table. After completing maintenance, record this in the table.
IVK Component Open Points Completed
Date Signature
ARCADIS Varic SPR2-310.832.01.02.02 Siemens AG
08.04 CS SD 24
Page 4 of 8
Medical Solutions
Protocol Date: Cust.-No.:
Measuring Devices
If the measurement devices are sensed electronically, for example with a “scout”, entry of the measuring devices in the table can be skipped.
Measuring devices electronically sensed?
Yes No Date / Signature: _____________________
Measuring Devices Type Serial No. Date Used Next Cali-
bration
Due
Movable Components
Yes No Date / Signature: _____________________
If “Yes“, enter the movable component with which the check was performed along with the with the Serial No. in the table.
Movable components (also test phantoms that are part of the system) are parts that can be used on different systems).
Component Serial No.
Siemens AG SPR2-310.832.01.02.02 ARCADIS Varic Medical Solutions
08.04 CS SD 24
Page 5 of 8
Cust.-No.: Date: Protocol
OK not n.a.
OK
1 General
1.1 Requirements
1.2 Required documents
1.2.1 When laser light localizer is present
1.2.2 When I.I. laser light localizer is present
1.3 Required tools, test equipment and aids
1.4 Potentially required spare parts
1.5 Emphasized texts
1.6 Safety information and preventive measures
1.7 Explanation of abbreviations
1.8 Maintenance interval
2 Visual and electrical inspection
2.1 Visual inspection
PMP Damage
2.2 Electrical inspection
2.2.1 Outlets
SIE Damage SIE Line voltage SIE Internal line impedance
3 Safety inspection
3.1 Mechanical safety inspection
SIM Cover panels SIM Cable deflectors SIM I.I. laser light localizer mechanics (if available) SIM I.I. laser light localizer function (if available) SIM Laser light localizer mechanics (if available) SIM Laser light localizer function (if available) SIM Foot brake SIM Brakes SIM C-arm SIM Wheels
ARCADIS Varic SPR2-310.832.01.02.02 Siemens AG
08.04 CS SD 24
Page 6 of 8
Medical Solutions
Protocol Date: Cust.-No.:
SIM Lifting column SIM Cassette holder (if present) SIM Warning signs SIM ID labels SIM TFT monitor(s)
3.2 Electrical safety inspection
SIE Cables and plugs SIE Fluoroscopic timer SIE Acoustic warning signal SIE Compulsory radiation shut off SIE Check the radiation release switch SIE Radiation indicator SIE Iris collimator SIE Conductive rubber SIE Ground wire test SIE Equivalent leakage current
4 Maintenance, operating value, and functional inspection
4.1 Maintenance
PMP Cleaning the system PMP System ventilation
4.2 Operating value inspection
SIE Dose rate PMF Event log
4.3 Functional inspection
SIE TFT monitor SIE Cassette exposure collimation (if present) SIE Area dose product measuring unit (if present) PMF Laser camera connection (if present) PMF Check the operating function. PMF Monitor display of the iris collimator opening PMF PMF monitor display of the slot diaphragm positions. PMF Battery replacement in the UPS
5 Final result/quality inspection and maintenance
SIE IQ quick test PMP Maintenance
5.1 Final work steps
SIE Ground wire test SIE Ground wire resistance
Siemens AG SPR2-310.832.01.02.02 ARCADIS Varic Medical Solutions
08.04 CS SD 24
Page 7 of 8
Cust.-No.: Date: Protocol
ARCADIS Varic SPR2-310.832.01.02.02 Siemens AG
08.04 CS SD 24
Page 8 of 8
Medical Solutions
Loading...